Application for Amend to License NPF-34,changing Tech Spec Table 3.3-5 to Reflect Containment Spray Pump up-to-rated Speed Response Time to Support Power Ascension Program Schedule.Fee Paid
ML17298C035
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/12/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17298C036 List:
References
ANPP-32389-EEVB, NUDOCS 8504150316
Download: ML17298C035 (9)


Text

REGULATORYVFORMATION DISTRIBUTION SEM (RIDE)

AC'CESSION NBR 8504 1 503 1 6 DOC ~ DATE 85/04/ 1 2 NOTARIZED NO DOCKET ¹ FACIL:STN-50-528 Palo Verde Nuclear Station~

Unit ii Arizona Publi 05000528 AUTH',NAME AUTHOR AFFII IATION VAN BRUNTFE ~ ED Arizona Public Service Co ~

RECIP ~ NAME RECIPIENT AFFILIATION DENTONFH ~ R.

Office of Nuclear Reactor Regulationi Director.

SUBJECT:

Application for amend to License NPF 34~changing.Tech Spec Table 3.3-5 to reflect containment spray pump up~to rated speed response, time to support power ascension program schedule.Fee paidO DISTRIBUTION CODE; A001D COPIES RECEIVED:LTR "ENCL SIZE:

TITLE; OR Submittal:

General Distribution NOTES:Standardized

plant, OL: 12/31/84 050005?8 RECIPIENT ID CODE/NAME NRR LB3 BC 01 INTERNAL; ACRS 09 ELD/HDS3 NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 EXTERNAL; EGSG BRUSKEFS NRC PDR" 02 COPIES LTTR ENCL 7

7 6

6 1

0 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/METB LPDR NSIC 00 03-05 COPIES LTTR'NCL 1

0 1

0 1

1 1,

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 24

p r r 1

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 ANPP-32389-EEVB/WFQ April 12, 1985 Director of Nuclear Regulation Mr. Harold R. Denton U.S. Nuclear Regulatory Commission Washington, D.

C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528 (License No. NPF-34)/529/530 Request for License Technical Specification Correction File:

85-056-026.

G.1.01.10

Reference:

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to H.
Denton, NRC, (ANPP-32373) dated April ll, 1985;

Subject:

Request for License Technical Specification Correction

Dear Mr. Denton:

Per conversations with your staff on April 10 and 11,

1985, submitted herewith is a request for an Emergency "Technical Specification Change.

This change is required in an expeditious manner to support the present PVNGS Unit 1

Power Ascension Program schedule.

Enclosed within this package request is:

a.

Description of the Proposed Change Request b.

Marked-up Technical Specification Change Page c.

Justification for Emergency Classification d.

Safety Evaluation of the Proposed Amendment Request e.

Significant Hazards Consideration Determination f.

Environmental Impact Consideration Determination g.

Discussion of the need for No Compensatory Measures In accordance with 10CFR170.12(c),

fee of

$ 150.00 is also enclosed.

required by Monday, April 15, 1985'chedule for Mode 4 entry.

the license amendment application Your approval of this request is in order not to delay our present 8504150316 850412 PDR ADOCK 05000528 P

PDR

ANPP-32389 April 12, 1985 Page Two If you have any questions, please contact W. F. Quinn of my staff.

Very truly yours,

~

~

~

E.

Va Brunt, Jr.

xecutive Vice President Project Director EEVB/WFQ/jdf Enclosure cc:

E. A. Licitra G,

W, Knighton R.

P.

Zimmerman A.

C.

Gehr C. F. Tedford-(w/attachment)

(w/attachment)

(w/attachment)

(w/attachment)

Arizona Radiation Regulatory Agency (w/attachment)

y l

li li t

t ANPP-32389 Dated April 12, 1985 Page 1 of 2 ENCLOSURE DESCRIPTION OF PROPOSED AMENDMENT RE UEST Table 3.3-5, Item 3.e of the PVNGS Unit 1 Technical Specifications is proposed to be changed to reflect the Containment Spray Pump up-to-rated.

speed response times of "33""/23"-~" (see attached marked up Technical Specification page 3/4 3-29).

The proposed response times are "consistent with the accident analyses as presented in FSAR Section 6.2.1.

JUSTIFICATION FOR EMERGENCY CLASSIFICATION On April 9, j.985 during testing of the Containment Spray Pumps in preparation for entry into Mode 4, it was determined that the Engineered Safety Features response times for the pumps to reach rated speed was greater than that allowed by Technical Specification Table 3.3-5, Item 3.e.

Investigation revealed that the valves presented in the Technical Specification were not consistent with the accident analyses as presented in FSAR Section 6.2.1.

This is an emergency change request since failure to allow this change to be made as an emergency situation will delay entry into Mode 4 during the present power ascension program.

Mode 4 entry is presently scheduled'or April 16, 1985.

The need for a correction to this Technical Specification was not obvious since development of the response times required a calculation of timing sequences to determine the total response time.

SAFETY EVALUATION OF PROPOSED AMENDMENT RE UEST The change to Table 3.3-5, Item 3.e will provide consistency between the Safety Analyses and Technical Specifications.

The probability of occurrence or consequences of an accident or malfunction of equipment will be consistent with that which was previously analyzed and the margin of safety will be maintained.

SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION The proposed amendment request does not involve a Significant Hazards Considera-tion because:

A)

Operation of PVNGS Unit 1 in accordance with this change would not:

2.

3.

Involve a significant increase in the probability or consequences of an accident previously analyzed; or Create the possibility of a new or different kind of accident from any accident previously analyzed; or Involve a significant reduction in a margin of safety; and B)

The proposed change matches the example citied in 48FR14864; i.e.,

the proposed change involves a purely administrative change to Technical Specifications in that it provides for correction of an error to achieve consistency between the Final Safety Analysis Report and Technical Specifications.

" CR ANPP-32389 Page 2 of 2 ENVIRONMENTAL IMPACT CONSIDERATION DETERMINATION The proposed amendment request does not involve an unreviewed environmental question because operation of PVNGS Unit 1 in accordance with this change would not:

1.

Result in a significant increase in any adverse environmental impact previously evaluated in the Final Environmental Statement (FES) as modified by staff's testimony to the Atomic Safety and Licensing Board, Supplements to the FES, Environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or 2.

Result in a significant change in effluents or power levels; or 3.

Result in matter not previously reviewed in the licensing basis for PVNGS which may have a significant environmental impact.

PROPOSED COMPENSATORY MEASURES There are no proposed compensatory measures which could be used in lieu'f this technical specification change.

There are no additional or new components to be added to PVNGS for this technical specification change.

(