Application for Amend to License NPF-34,revising Tech Spec 3/4.3.2 to Correct Containment Spray Pump Response Times Identified in Item 3e of Table 3.3-5, ESF Response Times. Expeditious Review Requested
ML17298C033
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/11/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML17298C034 List:
References
ANPP-32373-EEVB, NUDOCS 8504150314
Download: ML17298C033 (5)


Text

REGULATORYNFORNATION DISTRIBUTION SEN (RIBS)

ACCESSION NBR 85041 503 1 4 DOC DATE 85/04/1 1 NOT'AR IZED" YES DOCKET AUTH, NAME

~

FACIL;STN-50 528 Palo Verde Nuclear- Stationi Unit AUTHOR AFFILIATION ii Arizona Publi 05000528 VAN BRUNTiE ~ E. Arizona Public Service Co.

REC IP ~ NAME RECIPIENT AFFILIATION DENTONiHGR ~

SUBJECT:

Application for amend to License NPF 34irevising Tech 'Spec 3/4.3 ' to correct containment spray pump response times" identified in Item 3e of Table 3,3 5i "ESF Response T'imes,"

Expeditious review requested, DISTRIBUTION CODE: B001D COPIES RECEIVED:LTR 'NCL SIZE; TITLE: Licensing Submittal: PSAR/FSAR Amdts 8, Related Correspondence NOTES!Standardized plant. 05000528 OL: 12/31/84 RECIPIENT COPIES RECIPIENT .COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADI- 1 0 NRR LB3 BC 1 0 NRR LB3 LA 1 0 LIC ITRA E E 01 1 1 INTERNAL: ACRS 41 6 6 ADM/LFMB 1 0 ELD/HDS3 1 0 IE FILE 1 1 IE/DEPER/EPB 36 1 1 IE/DQAVT/QAB21'RR/DE/AEAB 1 1 NRR ROEiM ~ L 1 1 0, NRR/DE/CEB 11 1 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB 28 2 2" NRR/DE/MEB 18 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 NRR/DE/SGEB 25 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DSI/AEB 26 1 1 NRR/DS I/ASB 1 1 NRR/DSI/CPB 10 1 1 NRR/DS I/CSB 09 1 1 NRR/DSI/ICSB 16 1 1 NRR/DSI/METB 12'R 1 1 NRR/DSI/PSB 19 1 1 AB 22 1 1 NRR/DSI/RSB 23, ,1 1 LE 04 1 RGN5 3 3 /MIB 0 EXTERNAL; BNL(AMDTS ONLy) 1 1 DMB/DSS (AMDTS) 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 PNL GRUELiR 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 51 ENCL 43

a l

ll h

~>>

1 >) E,~

'N 11 II I

e

Arizona Nuclear Power Project P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 ANPP-32373-EEVB/WFQ Director of Nuclear Regulation AP ril ll, 1985 Mr. Harold R. Denton U. S. Nuclear Regulatory Commission Washington, D. CD 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 .

Docket Nos. STN 50-528 (License No. NPF-34)/529/530 Request for License Technical Specification Correction File: 85-056-026- G.1.01.10

Dear Mr. Denton:

The purpose of this letter is to request an emergency Technical Specification change to correct the Containment Spray Pump response times identified in Technical Specification 3/4.3.2, Table 3.3-5, Item 3e, as shown on the attachment. On April 9, 1985 APS identified an error in the calculation of this value which decreased the required response times by six seconds. These times should read:

e. Containment Spray Pump <33*/23**

This correction is required to make the Technical Specification consistent with the Safety Analysis as previously reviewed by your staff and does not represent a decrease in any margin of safety as described in the Safety Analysis.

This correction has been reviewed by the Plant Review Board and Plant Manager. It was discussed with Mr. G. Knighton et al, on April 10 and 11, 1985 via telecon.

Unit 1 is expected to be ready for initial entry into Mode 4 on or about April 15, 1985. In support of this evolution, you are requested to provide concurrence for this emergency Technical Specification change request as soon as possible. If you have any questions, please contact Joe Bynum at (602) 932-5300, extension 6300.

~/~

Very truly yours, 85040929 Qg'do 03~~ Ogooqgg E. E. Van Brunt, Jr.

0 + $ 9 +OQQ Executive Vice President 8

P Project Director EEVB/KWG/jdf Attachment cc: E. A. Licitra (w/attachment)

G. W. Knighton (w/attachment)

P. R. Zimmerman (w/attachment)

A. C. Gehr (w/attachment)

ANPP"32373 STATE OF ARIZONA )

) ss.

COUNTY OF MARICOPA)

I, Donald Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Donald Karner 1

Sworn to before me this / gl day of 1985 o ary Public My Commission Expires: