~R REQII (4
~o aa I
O I
aa
+r~
gO
+***+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Dgg 3.4 1984 Docket Nos.: 50-528, 50-529 and 50-530 Applicant:
Facility:
Subject:
Arizona Public Service Company Palo Verde, Units 1, 2 and 3
Summary of Meeting on Shift Staffing A meeting was held with the applicant on November 7, 1984 in Bethesda, mary-land.
The purpose of the meeting was to discuss operating experience require-ments for Palo Verde shift staffing.
The meeting attendees are listed in the enclosure and the meeting is summarized as follows.
Sumarv The applicant's submittals relating to operating shift staffing for Palo Verde were provided by letters dated September 12, 1984 and October 25, 1984.
Prior to the meeting, the staff had informed the applicant that, based on its review of the submittals, the staff could not conclude that the planned staffing for Palo Verde Unit 1 had sufficient commercial PWR operating experience to meet the Commission approved industry standard.
During the meeting, the staff agreed that for two of the Palo Verde Unit 1 shifts, the shift supervisors (SROs) meet the industry standard since each of them has in excess of 6 months of commercial PWR operating experience.
For 3 of the other shifts, one supervisor has 5 months of PWR experience and requires an additional
- month, and two have 3 months and require 3 more months.
The sixth supervisor has only 24 months of PWR experience but has several years of BWR experience.
The staff stated that, based on his extensive operating experience, it could support the use of this supervisor for 6 shift operation if this were the only exception to the industry standard.
Two viable and acceptable approaches were discussed with the applicant for Palo Verde Unit 1 meeting the industry standard for operating experience.
These are as follows:
850i0302h6 8412l4 PDR ADGCK 05000528 A
hl f If>>
It Iv I
~
~
(I I
fV>> \\
ff<<" "
I, I
I
I'I ht Vfh
~,<<I
<<I Ill h
<<If Ihf I
I <<hvf II fl,
- Ih lf,
,f
>> l 'll rhl P IA )t P,<<t
.1<<$ v
<<g I
If 4 I
=1 f<<(,
fili>>
I I <<h 1
Ig>>
I g
6'tr <<
I
,<<14 t'
~
I'<<h)l, I<<
'<< ~
fvf I
v I
+
I
)I
'yfh
.I tf<<h<<)
hffh 6>> I" I/
f"ffl 11
=
'I I
1'
<< ~
't f ~n<>1 frgf I
I A,
I p t thf" a S>T fh
=
'I I
I
"~
I r"gr I~
1.
For those shifts which do not have sufficient operating experience, use advisors who do have sufficient experience until the shift staffing has obtained the necessary experience.
2.
SROs can obtain additional experie'nce by being assigned as observers on shift to an operating PWR plant.
The applicant stated that it would evaluate the two approaches.and make a sub-mittal to the staff on how it proposes to proceed on this matter.
The appli-cant felt that it could meet the industry standard for Palo Verde Unit 1 prior to initial criticality.
4I 4@lQIKQ.Sg~ 8Zc
Enclosure:
As stated cc:
See next page E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing DISTRIBUTION:
See attached page LB@3:DLf/':DL ELicitra:tab G nighton 12/yy /84 12/ P'/84
II
~
II
+H h>f
~
'h ~ hh, fk
'fkh f h,
~
H h
II IL h
H k
o h
k
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 I'enneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M,Street, NW Washington, DC 20037 t
Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238
4 r
lt 1)git" 1 e
tl'~
l C
i gl II N
1 n
t K
C II III 1
ENCLOSURE MEETING ATTENDEES PALO VERDE SHIFT STAFFING NOVEMBER 7, 1984 Name Terry Quan Ed VanBrunt Joe Bynum Bob Adney Hugh Thompson Larry Crocker Mike Schoppman Thomas Novak Manny Licitra Yic Nersus John Hannon Affiliation APS APS APS APS NRC/DHFS NRC/DHFS/LQB NRC/DHFS/LQB NRC/DL NRC/DL/LB¹3 NRC/DL/LB¹3 NRC/DL/DRAB
OO J
I t
I t'
F h,,
h us J'ra gy p
'I h
'k 1
II 5 II
MEETING
SUMMARY
DISTRIBUTION
~ockee
~File NRC %%"
L PDR NSIC PRC System LB¹3 Reading File Project Manager J.
Lee
- Attorney, OELD R. Kartfield*
OPA*
E. Licitra NRC Partici ants H. Thompson L. Crocker M. Schoppman T. Novak M. Licitra V. Nersus J.
Hannon OTHERS bcc:
Applicant 8 Service List
- Caseload Forecast Panel Visits
a p
~
tl C
M