ML17298A795

From kanterella
Jump to navigation Jump to search
Further Response to FOIA Request for Records Re Problems Encountered by Util During Hot Functional Testing.Forwards App a Documents.Documents Also Available in Pdr.Search for Addl Documents Continuing
ML17298A795
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/22/1983
From: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML17298A796 List:
References
FOIA-83-609 NUDOCS 8402090097
Download: ML17298A795 (4)


Text

'+pe <tf'pj

+4',

0 P'g y 0

+**++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 I

Ogg g S 1983 imp

~) &

Docket No. 50-528 Ms. Billie Garde Government Accountability Project Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009

Dear Ms. Garde:

IN RESPONSE REFER TO FOIA-83-609 This is in further response to a letter from Ms.

Lynne Bernabei dated October 17, 1983, in which she requested, pursuant to the Freedom of Information Act, records relating to problems encountered by the Arizona Public Service Company during hot functional. testing of Palo Verde, Unit 1, including but not limited to the following failures:

broken thermowells, loose and broken parts to the reactor coolant

pumps, loose thermal
sleeves, and cracked shrouds on the CEA upper support structure.

Appendix A is a list of documents responsive to this request.

These documents are being placed in the NRC Public Document Room (PDR) in FOIA file folder 83-609 in your name.

The search for additional documents relevant to this request is continuing.

When we have completed our search, you will be notified.

Si

erely, J.

M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated seoio9oo97 saim2 PDR FOIA CARDE83-609 PDR

f r

r a'M

Re:

'A-83-609 APPENDIX A l.

Undated Draft Memo for V. S.

Noonan from J.

E. Jackson re:

TRIP REPORT -

REVIEW OF CE-KSB TESTING OF MODIFIED PALO VERDE REACTOR COOLANT PUMP AT THE NEWINGTON, NH TEST FACILITY (8 pages) 2.

Undated 3.

8/4/83 Palo Verde Nuclear Generating Station - Reactor Coolant Pump-Design Deficiencies - Preliminary Report (3 pages)

Memo for D. G. Eisenhut from T. Bishop re:

REQUEST FOR TRANSFER OF LEAD RESPONSIBILITY FOR EVALUATING OF REACTOR COOLANT SYSTEM DAMAGE IN COMBUSTION ENGINEERING SYSTEM 80 COMPONENTS AT PALO VERDE NUCLEAR GENERATING STATION AND OTHER AFFECTED PLANTS (2 pages) 4.

5/18/83 Memo for G. Knighton from M. Winsor re:

ANPP Unit 1 RCP-Operating Guidelines w/attachments (21 pages) 5.

8/29/83 Arizona Public Service Company - Palo

'~erde Units 1, 2, and 3 -

SUMMARY

OF MEETING CONCERNING RESULTS OF HOT FUNCTIONAL TESTING FOR PALO VERDE UNIT 1 w/attachments (23 pages)

1