Text
4 j Docket Nos.60-528, 60-629 and 50-530 Hr. E.
E. Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 2'l666 Phoenix, Arizona 85036 DISTRIBUTION
~Document-'Control 50=525/529/53~0-NRC PDR MAY 3 583L PDR NSIC PRC System LBII'3. Reading JLee EALicitra
- Attorney, OELD
- Jordan, IE
THNovak
Dear Hr. Van Brunt:
Subject:
Request for Additional Information - Palo Verde, Units 1, 2 and 3
By letter dated Harch 22, 1983, you submitted a proposed revision to Table 3.2-1 of the Palo Verde FSAR.
The revision deleted, with no justifi-cation given, a commitment to apply the gA program to certain items during the operations phase of the plant.
Confirming telephone conversations with K. Jones and J. Horita of. zour
- staff, we cannot accept the proposed revision to Table 3.2-1 witllou4~
proper justification.
Therefore, we request that you provide the infor-mation listed in Enclosure l.
Please advise us as to when you plan to respond to this request.
If you have any questions regarding the request, you should contact Hanny Licitra, the Licensing Project Hanager.
Sincerely, Original signed by:
George K Knighton George M. Knighton, Chief Licensing Branch 83 Division of Licensing Office of Nuclear'eactor Regulation
Enclosure:
As stated cc:
See next page 8305230003 8g050g t
PDR ADOCK 05000528 A
PDR OFFICElR SURNAME13 DATE Q LB83 ELicitra:m 4/83 h on 4/+/83
~ ~ ~ ~ ~ ~
NRC FORM 318 (10-80) NRCM 0240 OFF lClAL R ECOR D COPY USOPO: 1981~950
v((
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 CC:
Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Charles S; Pierson Assistant Attorney General 200 State Capitol 1700 West Washington Phoenix, Arizona 85007 Charles R.
Kocher, Esq., Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P.
0.
Box 800
- Rosemead, California 91770 h!'s.. Margaret Walker Deputy l3irector of Energy Programs Economic Planning and Devel oyment Office 1700 West Washington Phoenix, Arizona 85007 Regional Adminstr ator-Region V
U. S. Nuclear Regulatory Commission-1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, N.
W.
Washington, D.
C.
20037 Lynne Bernabei Government Accountability Project of the Institute for Policy.
Studies.
1901 gue Street, N.
W.
Washington, D.
C.
20009 Mr.
Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U. S.'Nuclear Regulatory C'ommission P.
0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 'S. 26th Street Phoenix: Arizona 85040
~
a
~
g',
~
~
~
Palo Verde Nucl'ear Generating Station Re uest for Additional Information 260.0 260.63 equality Assurance Branch The revision to Table 3.2-1 of the PVNGS FSAR, submitted by ANPP-23322-WFg/JYM dated March 22, 1983, deleted a commitment to apply the pertinent provisions of the FSAR Chapter 17 gA program to some items during the operations phase.
Reinstate such a commitment for the following items or justify not doing so.
Princi al Com onent
~FSAR Pa e
Table 3.2-1 Sheet Reactor coolant pump motors Pressurizer heaters New fuel elevator Fuel building HVAC Ductwork, supply
& exhaust Supply dampers, other Containment normal air cooling system Cooling fans and motors Cooling coils Heating coils Ductwork Dampers CEDM air cooling system Fans and motors Cooling coil Ductwork Dampers Reactor cavity air cooling system Fans and motors Containment building preaccess filter system Diesel generator normal heating and cooling system Unit heaters, electric Ventilating fans Dampers Control room. normal air conditioning system Ductwork Dampers 3 ~ 2 3 30 2-3 3.2-10 3.2-20 3.2-20 3.2-21 3.2-21 3.2-21 3.2-21 3.2-21 3.2-21
- 3. 2-.21
- 3. 2-21 31 2-21 3.2-22 3.2-22 3.2-23 302-23 3.2-23 3.2-24 3.2-24 18 18 19 19 19 19 19 19 19 19 19 20 20 21 21 21 22 22
I II I
~
I
~
'I I'
~
WIWK I Vg
~4$
W h
P h
~
~
~
~ 260.64 Clarify the proposed footnote cc of FSAR Table 3.2-1 to provide a
commitment that the equipment described by the footnote will be subject to the pertinent provisions of 10 CFR 50 Appendix B during the operations phase.
This can be done by making the last part of the last sentence of the footnote read:
"... Regulatory Guide 1.29 and shall be subject to the pertinent requirements of 10 CFR 50 Appendix B during the operations phase."
~
y
~
r 4
t