Forwards 820326 Request for Addl Info Re Rapid Depressurization & DHR for CESSAR Plant.Justification for Safe Operation of Plant,If Responses to Encl Question Will Not Be Provided 1 Month Prior to Load,Requested
ML17297B872
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/19/1983
From: Novak T
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8302020115
Download: ML17297B872 (6)


Text

J4N. f 9 $83 Docket Nos.:

50-528, 50-529 and 50-530 Hr. E.

E.

Van Brunt, Jr.

Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036

Dear Van Brunt:

DISTRIBUTION Document Control 50-528'/530 NRC PDR L PDR PRC System LB¹3 Reading JLee EALicitra

Attorney, OELD ELJordon JHTaylor ACRS (16)

BSheron

Subject:

Depressurization and Decay I{eat Removal for Palo Verde, Units 1, 2 and 3

In the enclosed letter, we requested Combustion Engineering (CE) to provide additional information about rapid depressurization and decay heat removal for CESSAR plants.

Since Palo Verde is a CESSAR plant, th'.responses to be provided by CE will be directly applicable to the Palo Verde plaIlt.

If the response to all of the enclosed questions will not be provided by CE at least one month prior to the anticipated fuel load date for Palo Verde Unit 1, we request that you provide justification for safe operation of the plant in the in',terim. If you have any questions regarding this matter, please contact the NRC pl.o'ject manager, Emanuel Licitra.

Sincerely, Original signed by:

Thomas 1I. Novak

Enclosure:

As stated Thomas tk. Hovak, Assistant Director for Licensing Division of Licensing cc:

See next page 83020>0~~

05000528

'DR ADOCK 0 A

  • See previous concurrence.

OFFICEI SURNAME/

DATE 0 DL:LB¹3 EALicitra/yt Qjj/83"""-"

~D L

~

~ ~ ~ 0 ~ ~ ~ ~

~

/

Nt ovak

"'Tg783""

~.~..~.(. ~

DL:LB¹3 GWKnighton

~\\1 0)0 0 ~ ~ 0]g0 t1 ~ 0 ~ 0 ~ 0 RSB ",-

BSheron'7/j'j /83"'"'"

~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ 1 ~ 10ttO ~ ~ 0 ~

NRC FORM 318 (10-80) NRCM 0240 O F FI CIA L R ECOR D COPY USQPO: 1881~880

/'

)

1

n Docket Nos.:

50-528, 50-529 and 50-530 fir. E.

E.

Van Brunt, Dr.

Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036

Dear Mr. Van Brunt:

DISTRIBUTION Document Control 50-528/529/530 NRC PDR L PDR PRC System LB//3 Reading JLee EALicitra

Attorney, OELD ELJordon JMTaylor ACRS (1

BSher

Subject:

Depressurization and Decay Hea Removal for Palo Verde Units 1, 2 and 3

(CESSAR Design)

In a letter to Mr. 5",: E. Scherer, ated March 26, 1982, a copy of which was sent to you, we"'requested Cp bustion Engineering to provide additional information regarding a capability for rapid depressurization of the CESSAR primary coolant syst f to allow more direct methods of decay heat removal.

As you are aware Combustion Engineering is working to complete the response to our requ If the response by Cori ustion Engineering is not provided at least one month prior to the ynticipated fuel load date for Palo Verde Unit 1, we request that you pfovide a justification for safe operation of the Palo Verde plant in t 6 interim until the issue can be resolved.

If you have any questions regarding this request, please carr'tact the NRC project mana kr, Emanuel Licitra.

Sincerely, cc:

See next page George ll. Knighton, Chief Licensing Branch No.

3 Division of Licens',ing DL:LBP

~ ~ ~ ~ ~ eoooooo ~ oe ~ ~ ~ oo7e ~ ~

1//g/83

~ ~ ~ ~ ~ ofteeo ~ oo ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

OFFICE/

SURNAME/

DATEP NRC FORM 318 (1040) NRCM 0240 DL:LB03

~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

GlJKnighton

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ o ~

1/

/83

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~

'E(6 'r.on.'-,"-

"l7pf/83-"""

OFFICIAL RECORD COPY USGPO: 1981~e980

i' C

o O

Palo Verde Mr. E.

E.

Van Brunt, Jr.

. Vice President - Nuclear Projects Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036 CC:.

Arthur C. Gehr, Esq.

Snell 8 Wilmer

'100 Valley Center Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 West Washington

.Phoenix, Arizona 85007 Regional Adminstrator-Region V

U. S. Nuclear Regulatory Commission 1450 maria Lane Suite 210 Walnut Creek, Cali fornia 94596 Charles R. Kocher, Esq., Assistant Counsel James A. Boeletto, Esq.

Southern California Edison Company P. 0. Box 800

Rosemead, California 91770 Ms. Marqaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Bui lding Santa Fe, Hew Mexico 87503 Resident Inspector Palo Verde/HPS U;. S. Nuclear Regulatory Commission P.

0.

Box 21324 Phoenix, Arizona 85001 Ms. Patri'cia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Lynne A. Bernabei, Esq.

Harmon 4 Weiss 1725-I Street, -N.- W.

-~

Suite 506 Washington, D; C.

20006