Forwards Final Schedule for Independent Design Review Meetings,Per 810122 Meeting
ML17296B307
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/23/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8103310438
Download: ML17296B307 (12)


Text

MAR 2 3 1981 Docket Nos.:

STN 50-528/529/530 Nr. E.

E.

Van Brunt, Jr.

Vice President - Construction Projects Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036

",off[(fg~,

3 hlllAzrl98i~

o.$. Nvamt amuurcrg COMMI$$ OH Dear ter.

Van Brunt:

SUBJECT:

SCHEDULE FOR INDEPENDENT DESIGN REVIEW (IDR) NEFTQGS During a meeting with you and members of your staff on January 22, 1981, we discussed a tentative schedule for future IDR meetings.

Based upon your comments and comments received from the NRC staff, a final schedule was formulated as shown in Attachment 1.

The schedule for additional CESSAR IDR meetings is cu} rently being developed.

Although every attempt will be made to follow this target schedule, there may be a need to modify the dates of some of the meetings in'order to accommodate higher priority work.

If you have any additional questions an. this matter, please contact the project manager, Janis Kerrigan, at (30T) 492-7272.

Sincerely, Mjtnal efgned by Robert L. Tedosoo Robert L. Tedesco, Assistant Director for Licensing Division of Licensing cc:

See next page.

SEE PREVIOUS CONCURRENCE.

l~

l yrJ b;ngte

'ta ',qM noe. b>7.3 Nod,",~f

Docket Nos.:

STN 50-528/529/530 Mr. E.

E.

Van Brunt, Jr.

Vice President - Construction Projects Arizona Pu5lij Service Company P. 0.

Box gld66 Phoenix, Arizona 85036

Dear Mr. Van Brunt:

/

SUBJECT:

SCHEDULE FOR INDEPENDENT DESIGN VIEW (IDR) MEETINGS During a meeting with you and members oj your staff on January 22, 1981, we discussed a tentative schedule for future IDR meetings.

Based upon your comments and coments received rom the NRC staff, a final schedule was formulated as shown in Attachment 1

The schedule for additional CESSAR IDR meetings is currently being de, eloped.

Although every attempt will be made to follow this target schedule, there may be a need to modify the dates of some of the meetings in~order to accommodate higher priority work.

If you have any additional qu stions on this matter.

please contact the project manager, Janis Kerri an. at (301) 492-7272.

Sincerely, cc:

See next pa e.

ag'1.@~LA.TNsenhggsb~eeceor tr""~e Division of Licensing Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File 0-528/529/530 LPDR PDR NSIC TERA DEIsenh RPurple RTedesc FMirag i,a JKerrjgan JLee Jul le r CGrimes OFFICEI SURNAME/

0ATEP DL:LB¹3 J

r an:j

....3/../81...

DL'

~

.....3/../.

AD/L lia e esco

~ ~ ~ ~

~ I ~ ~

~

~

~

DL:

enhut

~

~ ~ ~

~ ~ ~ ~

~

~

g /

~ll ~ ~ ~ ~

/81 3

/81

~ol/ o r/t

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 3i8 (10/80) NRCM 0240 OFFICIAL RE ORD COPY o USGFO: 1980-329.824

~

4 L

+ u I

0 I

il U

I'

~pip

)

(,4~P,R RE00

~4

~o 0o I

ri

+n ++**+

~

~

UNITED STATES

.NUCLEAR R EGULATORY COMMISSION, WASHINGTON, D. C. 20555 MAR 2 3 1981 Docket Nos.:

STN 50-528/529/530 Mr.

E.

E.

Van Brunt, Jl.

Vice President - Construction Projects Arizona Public Service Company P.

0.

Box 21666 Phoenix, Arizona 85036

Dear Mr. Van Brunt:

SUBJECT:

SCHEDULE FOR INDEPENDENT DESIGN REVIEW (IDR) MEETINGS During a meeting with you and members of your staff on January 22,

1981, we discussed a tentative schedule for future IDR meetings.

Based upon your comments and comments received from the NRC staff, a final schedule was formulated as shown in Attachment 1.

The schedule for additional CESSAR IDR meeti ngs is currently being developed.

Although every attempt will be made to follow this target schedule, there may be a need to modify the dates of some of the meetings in order to accommodate higher priority work.

If you have any additional questions on this matter, please contact the project manager, Janis Kerrigan, at (301) 492-7272.

Si ncerely, cc:

See next page.

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing

)j,pM

Nr.

E.

E.

Van Brunt, Jr.

CC-'rthur C. Gehr, Esq.

Snell 8 Hilmer 3100 Valley Cente~

Phoenix, Arizona 85073 Charles S. Pierson Assistant Attorney General 200 State Capitol 1700 Hest Washington Phoenix, Arizona 85007 David N. Barry, Esq.,

Senior Counsel Charles R. Kocher, Esq., Assistant Counsel Southern California Edison Company

- P. 0. Box 800

Rosemead, California 91770 Dr. Stanley L. Dolins Assistant Director Energy Programs (OEPAD)

Office of the Governor 1700 Hest Washington Executive Tower - Room 507

Phoenix, Arizona 85007 William Primm Assistant Attorney General-Bataan Memorial Building Santa Fe, New mexico 87503 Resident Inspector Palo Verde/NPS U;S. Nuclear Regulatory Commission c/o TTL/LGX Luke Air Force Base, Arizona 85309 Hs. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040

'1 4.

)$ 4

Meek of 02/09/81 02/16/81 02/23/81 03/02/81 03/09/81 03/16/81 03/23/81 03/30/81 04/06/81 04/13/81 04/20/81 04/27/81 05/04/81 05/11/81 05/18/81 05/25/81 06/01/81 06/08/81 Attachment 1

Palo Verde meetin s in Arizona

(Conf. Call) - Complete Fire Protection - Complete

  • Preliminary I&C (Haryl and)
  • Chapter 14 Startup

& Test Program (Complete)

Auxiliary Systems (meetings 1 and 2)**

Containment Systems (tentative)

  • Seismology, Geology Control Room Design, Instrumentation and Control CESSAR meetin s in Connecticut
  • Preliminary I&C {HD)

Instrumentation

& Control 06/15/81 06/22/81 06/29/81 07/06/81 07/13/81 07/20/81 07/27/81 08/03/81 08/10/81 08/17/81 08/24/81 08/31/81 09/07/81 09/14/81 09/21/81 09/28/81 Mechani ca 1, Engi neeri ng Revi ew*

Radiation Protection

  • I&C Drawing Review Auxiliary Systems (meetings 3 and 5)**
  • I&C Drawing Review Auxiliary Systems (meeting 4)**
  • I&C site visit (dependent upon construction
  • I&C site visit status)

(Arizona)

Morking meeting only, no board required:

    • See next page.

S

Auxiliary Systems IDR Meetin 4'RP Section 9.1.1 9.1. 2 9.1. 3 9.1. 4 9.2.1 9.2.2 9.2.5 5.4.11 9.2.3

9. 2.4 9.2.6 9.3.1
10. 3 10.4. 7 10.4. 5 9.3. 3 3.6.1 3.5.11 3.5.2 3.4.1 9.4.1 9.4.2 9;4.3 9.4.4 9.4.5 Titie New Fuel Storage Spent Fuel Storage Spent Fuel Cooling Fuel Handling Service Water Component Cooling Water Ultimate Heat Sink Pressurizer Relief Valve Demineralized Water System Pohab)e and Sanitary Water System Condensate Storage Compressed Air Main Steam Condensate and Feed Water Circulating Water System Floor Drainage Protection Against High and Moderate Energy Line Breaks External Missiles

(,Inside Cont,)

External Missi les Flood Actuation Control Room Venti.lation Fuel Pool Area Ventilation Auxi 1 iary Radwaste Area Venti 1 ati on

, Turbine Area Ventilation ESF Area Ventilation

RAPw MAR 88 Igg~

J