Forwards IE Insp Repts 50-528/79-08,50-530/79-08 & 50-530/79-04 on 791001-31.No Noncompliance Noted
ML17296A552
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/27/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17296A553 List:
References
NUDOCS 8001280473
Download: ML17296A552 (4)


See also: IR 05000528/1979008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94696

December

27,

1979

Docket Nos.

5 -52

50-5- 30

Arizona Public Service

Company

P. 0.

Box 21666

Phoenix, Arizona

85036

Attention:

Mr. E.

E.

Van Brunt Jr., Vice'President

Construction Projects

and ANPP,,Director

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and

3

This refers to the inspections

conducted

by Mr. L. E. Vorderbrueggen

of

this office during the period October 1-31,

1979 of activities authorized

by NRC Construction

Permit Nos.

CPPR-141,

-142,

and -143,

and to the

discussions

of his findings held with Mr. R. L. Hand and other members

of your staff on October

19

8 26,

1979.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspectors.

No items of noncompliance with NRC requirements

were identified within

the scope

of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you believe

to be proprietary, it is necessary

that you submit

a written application

to this office, within 20 days of the date of this letter, requesting

that such information be withheld from public disclosure.

The application

'I

E.

E.

Van Brunt Jr.

December

27,

1979

must include

a full statement

of the reasons

why it is claimed that

the information is proprietary.

The application should

be prepared

so

that any proprietary information identified is contained- in an enclosure

to the application, since the application without the enclosure will

also

be placed in the Public Document

Room.

If we do not hear

from you

in this regard within the specified period, the report will be placed

in the Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

Hos. 50-528/79-08

50-529/79-08

50-530/79-04

G. S. Spencer,

Chief

Reactor Construction

and

Engineering

Support

Branch