UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
I
~
I
SUITE 202, WALNUTCREEK PLAZA
1990 N. CALIFORNIA BOULEVARD
WALNUTCREEK, CALIFORNIA 94596
DEC 18
1978.
Docket Nos.
50-528
50-529
Arizona Public Service
Company
P. 0.
Box 21666
Phoenix, Arizona.
85036
Attention:
Mr. E.
E.
Van Brunt, Jr.
Vice President,
Construction
Projects
and
ANPP Director
Gentlemen:
Subject:
NRC Inspection at Palo Verde Units
1 and
2
This refers to the inspection
conducted
by Mr. M. G.
Areas
examined during this inspection are described in the enclosed
inspection report.
Llithin these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears that one of
your activities was not conducted in full compliance with the
NRC
requirements,
as set forth in the Notice of Violation, enclosed
herewith as Appendix A.
This item of noncompliance
has
been cate-
gorized into a level
as described
in our correspo'ndence
to all
NRC
licensees
dated
December
31, 1974.
This notice is sent to you pursuant to the provisions of Section
2.201
of the
NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal
Regulations.
Section
2.201 requires
you to submit to this office,
within thirty (30) days of your receipt of this notice,
a written
statement
or explanation in reply including:
(1) corrective steps
which have
been taken
by you and the results achieved;
(2) corrective
steps
which will be taken to avoid further violations; and (3) the
date
when full compliance will be achieved.
Albert of this
office on November 29-December
2 and
December
5-7, 1978, of activities
authorized
by
NRC Construction
Permit
Nos.
CPPR-154
and
155 and to
the discussion of our findings held by Mr. Albert with Mr. M. M. Petro
and other members of your staff at the conclusion of the inspection.
l
~
~
Arizona Public Service
Company
DEC 18
>378
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulytions,
a copy of this letter
and the enclosed
inspection report will be placed in the
NRC's Public
Document
Room. If this report contains
any information that you be-
lieve to be proprietary, it is necessary
that you submit
a written
application to. this office, within 30 days of the date of this letter,
requesting that such information be withheld from public disclosure.
The application must include
a full statement of the reasons
why it
is claimed that the information is proprietary.
The application
should
be prepared
so that any proprietary information identified is
contained in an enclosure to the application,
since the application
-without the enclosure will also
be placed in the Public Document
Room.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosures:
l.
Appendix A - Notice of Violation
2.
IE Inspection
Report
Nos.
50-528/78-08
50-529/78-08
G. S.
S encer,
Chief
Reactor Construction
and
Engineering
Support
Branch