Notice of Violation from Insp on 781129-1202 & 1205-07
ML17296A294
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/18/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML17195A455 List:
References
50-528-78-08, 50-528-78-8, 50-529-78-08, 50-529-78-8, NUDOCS 7902260037
Download: ML17296A294 (2)


Text

APPENDIXA Arizona Public Service Company P. 0.

Box 21666 Phoenix, Arizona 85036 Docket No. 50-529 Construction Permit No. CPPR-155 Qe Notice of Violation Based on the results of an NRC inspection conducted November 29-December 2

- and December 5-7, 1978, it appears that one of your activities was not conducted in full compliance with conditions of your NRC Construction Per-mit No. CPPR-155 as indicated below:

Appendix B of 10 CFR 50, Criterion IX, requires that special processes be "...accomplished by qualified personnel using qualified procedures...."

The PVNGS PSAR (Admendment 17, PP 17.1A-36) implements this criter ion and requires that:

"Special processess shall be performed...by qualified personnel in accordance with...procedures...."

Bechtel lJPP/gCI No. 56.0, "Cadweld Splicing of Reinforcing Steel, " Paragraph 5..5, states that, "Prior to assembling the Cadweld sleeve into position on rebar ends, the bar ends shall be marked...."

Contrary to the above requirements, on November 30, 1978, a

Cadweld sleeve was placed and pinned without prior marking of the rebar.

This horizontal Cadweld was being made on the West side of the Unit 2 primary shield wall.

Cadweld splicing per-sonnel stated that bar marking after sleeve placement has been used as an optional procedure for horizontal.rebars.

This item is an infraction.