ML17293A025

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Acceptance Review - Salem License Amendment to Relocate RCS Pressure Isolation Valve Table from the TSs to the TRM (L-2017-LLA-0313)
ML17293A025
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/19/2017
From: Carleen Parker
Plant Licensing Branch 1
To: Duke P, Bernard Thomas
Public Service Enterprise Group
References
L-2017-LLA-0313
Download: ML17293A025 (3)


Text

NRR-PMDAPEm Resource From: Parker, Carleen Sent: Thursday, October 19, 2017 2:49 PM To: Duke, Paul R.; Thomas, Brian J. (Brian.Thomas@pseg.com)

Cc: Danna, James; Grover, Ravinder; Hsu, Kaihwa

Subject:

Acceptance Review - Salem License Amendment to Relocate RCS Pressure Isolation Valve Table from the TSs to the TRM (L-2017-LLA-0313)

Paul and Brian, By letter dated September 27, 2017 (Agencywide Document Access and Management System (ADAMS)

Accession No. ML17270A076), PSEG Nuclear LLC (PSEG) submitted a license amendment request for Salem Generating Station (Salem), Unit Nos. 1 and 2, to relocate the Reactor Coolant System Pressure Isolation Valve Table from the Technical Specifications to the Technical Requirements Manual. The request would also remove references to the table and move all notes and leakage acceptance criteria from the table to the surveillance requirements.

The purpose of this email is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 150 hours6.25 days <br />0.893 weeks <br />0.205 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is October 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date (greater than a month) or significant changes in the forecasted hours (greater than 25%), the reasons for the changes, along with the new estimates will be communicated, during the routine interactions with the assigned project manager.

These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

1

Carleen Parker Project Manager -

Hope Creek and Salem Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)415-1603 carleen.parker@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 3787 Mail Envelope Properties (Carleen.Parker@nrc.gov20171019144800)

Subject:

Acceptance Review - Salem License Amendment to Relocate RCS Pressure Isolation Valve Table from the TSs to the TRM (L-2017-LLA-0313)

Sent Date: 10/19/2017 2:48:58 PM Received Date: 10/19/2017 2:48:00 PM From: Parker, Carleen Created By: Carleen.Parker@nrc.gov Recipients:

"Danna, James" <James.Danna@nrc.gov>

Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Hsu, Kaihwa" <Kaihwa.Hsu@nrc.gov>

Tracking Status: None "Duke, Paul R." <Paul.Duke@pseg.com>

Tracking Status: None "Thomas, Brian J. (Brian.Thomas@pseg.com)" <Brian.Thomas@pseg.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3841 10/19/2017 2:48:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: