ML17284A278

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - NRC Acceptance Review for Amendment Request Regarding ILRT Extension to 15 Years
ML17284A278
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/11/2017
From: Michael Orenak
Plant Licensing Branch II
To: Lowery K
Southern Nuclear Operating Co
References
EPID L-2017-LLA-0295, MG0240, MG0241
Download: ML17284A278 (3)


Text

1 NRR-PMDAPEm Resource From:

Orenak, Michael Sent:

Wednesday, October 11, 2017 1:36 PM To:

Lowery, Ken G.

Cc:

McElroy, G. Ken

Subject:

NRC Acceptance review for Amendment request regarding ILRT extension to 15 years

Ken, By letter dated September 12, 2017, Southern Nuclear Operating Company, Inc. (SNC) submitted a license amendment request for the Vogtle Electric Generating Plant (VEGP), Units 1 and 2, (ADAMS Accession No. ML17257A177; CAC Nos. MG0240 and MG0241; EPID L-2017-LLA-0295) to revise Technical Specification 5.5.7, Containment Leakage Rate Testing Program, to extend the Type A integrated leakage rate test to 15 years, extend type C testing to a 75-month frequency, adopt ANSI/ANS 56.8-2002; and extend the grace interval to 9 months for Type A, B, and C testing. The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> to complete. The NRC staff expects to complete this review in approximately 10 months, which is August 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Michael D. Orenak Vogtle Project Manager NRR - Division of Operating Reactor Licensing Phone: 301-415-3229 e-mail: Michael.Orenak@nrc.gov

2

Hearing Identifier:

NRR_PMDA Email Number:

3766 Mail Envelope Properties (Michael.Orenak@nrc.gov20171011133600)

Subject:

NRC Acceptance review for Amendment request regarding ILRT extension to 15 years Sent Date:

10/11/2017 1:36:21 PM Received Date:

10/11/2017 1:36:00 PM From:

Orenak, Michael Created By:

Michael.Orenak@nrc.gov Recipients:

"McElroy, G. Ken" <GKMCELRO@southernco.com>

Tracking Status: None "Lowery, Ken G." <KGLOWERY@southernco.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3140 10/11/2017 1:36:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: