Forwards Insp Rept 50-397/86-21 on 860601-0712 & Notice of Violation.Concern Expressed Re Plant Mgt & Health Physicist Visiting RHR Cubicle During Valve Repair.Requests Plans to Heighten Mgt & Worker Procedural Compliance
ML17278A960
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/25/1986
From: Chaffee A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A962 List:
References
NUDOCS 8608130321
Download: ML17278A960 (4)


See also: IR 05000397/1986021

Text

Docket No.

50-397

Washington Public Power Supply System

P. 0. Box 968

Richland,

Washington

99352

Attention:

Mr.

G.

C. Sorensen

Manager of Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

R. T. Dodds

and R.

C. Barr

of this office during June

1 - July 12,

1986 of activities authorized by NRC

Operating License No. NPP-21,

and to the discussion of findings held by the

inspectors with Mr. C.

M. Powers at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed inspection

report.

Within these

areas,

the inspection consisted of selective

examination

of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities were not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

We are

particularly concerned that several,

members of your plant management staff,

including health physicists, visited the MR cubicle during the valve repair

and ignored the existing work area conditions.

In your response

to the Notice

of Violation please

advise

us of your plans to heighten

management

and worker

sensitivity to procedural

compliance.

Your response

to this Notice is to be submitted in accordance

with the

provision's of 10

CPR 2.201

as stated in Appendix A, Notice of Violation.

Xn accordance

with 10

CPR 2.790(a),

a copy of this letter, the enclosure,

and

your response will be placed in the

NRC Public Document

Room.

The responses

directed by this letter and the accompanying Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required by the Paperwork Reduction Act of 1980,

PI,96-511.

0

8608i30321

860725

i PDR

ADOCK 0500035'7

PDR

rEQ2 i

~I

g ~

i

I

lrl'

~ ~'s3<

y

t l

H

t

d

E

.1

i

!

N

t

JUI 25 l986

2

Should you have

any questions" concerning this inspection,

we vill be glad to

discuss

them with you.

Sincerely,

Reactor Projects

Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-397/86-21

cc w/enclosures:

C.

M. Powers,

WNP2 Plant Manager

P. L. Powell,

WNP2 licensing Manager

R. B. Glasscock,

WNP2 Director, Assurance

6 Licensing

N. S. Reynolds,

Bishop, Iiberman,

Cook, Purcell

S Reynolds

J.

D. Martin,

WPPSS

G. E. Doupe,

WPPSS

W.

G.

Conn,

Burns 6 Roe, Inc.

State of Washington

bcc v/enclosures:

RSB/Document Control Desk

(RIDS)

Project Inspector

Resident Inspector

G.

Cook

'B. Faulkenberry

J. Martin

bcc w/o enclosure

2:

LFMB

Re ion V

ds ~

r

7/8 /86

7/

86

0

AJo

son

7+$

6

7

/86

P

o

son

7~

6

AEChpffee

7/8 /86

kl

h

pt

A

tl