ML17278A430

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/85-30 on 850803-31 & Notice of Violation
ML17278A430
Person / Time
Site: Columbia 
Issue date: 09/20/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17278A431 List:
References
NUDOCS 8510090355
Download: ML17278A430 (4)


See also: IR 05000397/1985030

Text

'l1

I~

F

jE'p 30 )985

Docket No.

50-397'ashington

Public Power Supply System

P.

O. Box 968

Richland, Washington

99352

Attention:

Mr.

G.

C. Sorensen

Manager of Regulatory Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

A. Toth and R. Waite of

this office during August 3-31,

1985, of activities authorized

by NRC

Operating License

No. NPF-21,

and to the discussion of findings held by the

inspectors with Mr. C. Powers at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that certain of your

activities was not conducted in full compliance with NRC requirements,

as set

forth in the Notice of Violation, enclosed

herewith as Appendix A.

Your response

to this Notice is to be submitted in accordance

with the

provisions of 10 CFR 2.201

as stated in Appendix A, Notice of Violation.

In accordance

with 10

CPR 2.790(a),

a copy of this letter, the enclosures,

and

your response will be placed in the

NRC Public Document Room.

The response

directed by this letter and the accompanying Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget as

required by the Paperwork Reduction Act of 1980,

PL 96-511.

8>>gP+03~~

0600@39

g50 PPO

>>R

PDOGH

pDR

8

1

'

44

41

WI

4 I

(

II

Washington Public Power Supply System

- 2-

PEP 20 f988

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

SR0ln81 stgie8

by,

D. Fg, .~gQ>

Acting Director

Division of Reactor Safety 8 Projects

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-397/85-30

f

'1

CC:

I

C.

M. Powers,

WNP-2 Plant Manager

P. I . Powell,

WNP-2 Licensing Manager

R. B. Glasscock,

WNP-2 Director, Assurance

6 Iicensing

State of Washington

N.

S. Reynolds,

Doupe','Bishop',

Liberman,

Cook, Purcell

Zc Reynolds

bcc:

RSB/Document Control D'esk

(RIDS)

Mr. Z. Martin

Mr. B. Faulkenberry

':

G.

Co'ok

'"esident Inspector

Ii

a

R

/

dc~

A

dh

~R

ite

P

n

AJoh son

AChaffee

DKirsch

9/ /g/85

9$ g/85

9/I Q/85

9/jf /85

9/lh /85

9/pg/85

l

1

t

I'I

I'

S

f

I

t

i

'U

~e" 1

I

'

st