ML17278A430
| ML17278A430 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/20/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17278A431 | List: |
| References | |
| NUDOCS 8510090355 | |
| Download: ML17278A430 (4) | |
See also: IR 05000397/1985030
Text
'l1
I~
F
jE'p 30 )985
Docket No.
50-397'ashington
Public Power Supply System
P.
O. Box 968
Richland, Washington
99352
Attention:
Mr.
G.
C. Sorensen
Manager of Regulatory Programs
Gentlemen:
Subject:
NRC Inspection
This refers to the inspection
conducted
by Messrs.
A. Toth and R. Waite of
this office during August 3-31,
1985, of activities authorized
by NRC
Operating License
No. NPF-21,
and to the discussion of findings held by the
inspectors with Mr. C. Powers at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed inspection
report.
Within these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that certain of your
activities was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your response
to this Notice is to be submitted in accordance
with the
provisions of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10
CPR 2.790(a),
a copy of this letter, the enclosures,
and
your response will be placed in the
NRC Public Document Room.
The response
directed by this letter and the accompanying Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget as
required by the Paperwork Reduction Act of 1980,
PL 96-511.
8>>gP+03~~
0600@39
g50 PPO
>>R
PDOGH
pDR
8
1
'
44
41
WI
4 I
(
II
Washington Public Power Supply System
- 2-
PEP 20 f988
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
SR0ln81 stgie8
by,
D. Fg, .~gQ>
Acting Director
Division of Reactor Safety 8 Projects
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-397/85-30
f
'1
CC:
I
C.
M. Powers,
WNP-2 Plant Manager
P. I . Powell,
WNP-2 Licensing Manager
R. B. Glasscock,
WNP-2 Director, Assurance
6 Iicensing
State of Washington
N.
S. Reynolds,
Doupe','Bishop',
Liberman,
Cook, Purcell
Zc Reynolds
bcc:
RSB/Document Control D'esk
(RIDS)
Mr. Z. Martin
Mr. B. Faulkenberry
':
G.
Co'ok
'"esident Inspector
Ii
a
R
/
dc~
A
- dh
~R
ite
P
n
AJoh son
AChaffee
DKirsch
9/ /g/85
9$ g/85
9/I Q/85
9/jf /85
9/lh /85
9/pg/85
l
1
t
I'I
I'
S
f
I
t
i
'U
~e" 1
I
'
st