ML17278A408
| ML17278A408 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/26/1985 |
| From: | Novak T Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| TAC-59750, NUDOCS 8509300581 | |
| Download: ML17278A408 (5) | |
Text
Docket No. 50-397 SEP 2 6 1985 Mr. G. C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
This confirms our telephone authorization given on September 26, 1985, for the changes in the Technical Specifications for the Washington Public Power Supply System Unit 2, as requested in your September 26, 1985 letter.
Facility Operating License NPF-21 is hereby amended by changing the Technical Specifi-cations exactly as requested in your September 26, 1985 letter.
Copies of the license amendment and safety evaluation for these Technical Specification changes will be sent to you when completed.
Sincerely, cc:
See next page Thomas M. Novak, Assistant Director for Licensing Division of Licensing DISTRIBUTION See next page L g2 DL LB82/DL/BC
/
L JBradfute:lb WButler TMNovak 09/gp/85 09/
(A(85 09/$ /85
kb
~ '~Q RECII P
~4 0
Cy 0O
/p (X
Cp
++*++
Docket No. 50-397 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SEP 26 1985 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
This confirms our telephone authorization given on September 26, 1985, for the changes in the Technical Specifications for the Washington Public Power Supply System Unit 2, as requested in your September 26, 1985 letter.
Facility Operating License NPF-21 is hereby amended by changing the Technical Specifi-cations exactly as requested in your September 26, 1985 letter.
Copies of the license amendment and safety evaluation for these Technical Specification changes will be sent to you when completed.
Sincerely, cc:
See next page Thomas M. Novak, Assistant Director for Licensing Division of Licensing
Mr. G.
C. Sorensen, Manager Washington Public Power Supply System WPPSS Nuclear Project No.
2 (WNP-2)
CC:
Nicholas Reynold, Esquire
- Bishop, Cook, Liberman, Purcell 5 Reynolds 1200 Seventeenth
- Street, N.
W.
Washington, D.
C.
20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way Richland, Washington 99532 Mr. Curtis Eschels, Chairman Energy Facility Site Evaluation Council Hail Stop PY-ll Olympia, Washington 98504 P. L. Powell, Licensing Manager Washington Public Power Supply System P. 0. Box 968, HD 956B Richland, Washington 99352 Mr. W. G.
Conn Burns and Roe, Incorporated c/o Washington Public Power Supply System P. 0.
Box 968, HD 994E Richland, Washington 99352 R. B. Glasscock, Director Licensing and Assurance Washington Public Power Supply System P. 0. Box 968, MD 280 Richland, Washington 99352 Mr. C.
Vi. Powers WNP-2 Plant Manager Washington Public Power Supply System P. 0. Box ViD 927M Richland, Washington 99352 Regional Administrator, Region V
U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
DISTRIBUTION (ALOOF~
HRC PDR Local PDR PRC System NSIC LBfi2 Reading EHylton ABeurrrre ~ ~<~+~e-TNovak JSaltzman, SAB OELD, Meedheed ft400 Ctiiles HDenton JRutberg AToalston
- l1Nil1er, LF!1B JPartlow BGrimes EJordan LHarmon
- EButcher, SSPB TBarnhart (4)
Inez Bailey