ML17263A397
| ML17263A397 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/08/1993 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17263A398 | List: |
| References | |
| TAC-M84044, TAC-M86225, NUDOCS 9309150264 | |
| Download: ML17263A397 (5) | |
Text
gP,S REOIj 0
Op r~n ++*++
Docket No. 50-244 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. 2OSSSOOOi September 8,
1993 Dr. Robert C. Mecredy Vice President, Nuclear Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Dr. Mecredy:
SUBJECT:
R.
E.
GINNA NUCLEAR POWER PLANT - THIRD 10-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN AND ASSOCIATED REQUESTS FOR RELIEF (TAC NOS.
M84044 AND M86225)
By letter dated July 21,
- 1989, you submitted the R.
E. Ginna Nuclear Power Plant Third 10-Year Interval Inservice Inspection Program Plan.
The NRC concluded in its safety evaluation (SE) dated August 6, 1990, that the Program Plan, with the exception of Requests for Relief Nos.
10 and 13, was found to be acceptable and in compliance with the regulations.
Subsequent to the NRC's review above, you submitted two revisions of the Program Plan.
Revision 1 was submitted in a letter dated August 10,
- 1992, and Revision 2 was submitted by letter dated January 25, 1993.
The January 25, 1993, submittal of the Program Plan was reformatted for ease of use.
The
-reformatted program consisted of eleven independent
- sections, each carrying its own revision number.
In your letter dated January 5,
1993, you submitted Relief Request (RR) No.
19 and notified the NRC of the intent to incorporate Code Cases N-460 and N-498 into the Program Plan.
The NRC staff, with the assistance of its contractor, Idaho National Engineering Laboratory (INEL), reviewed and evaluated your submittal dated January 5,
- 1993, and concluded that pursuant to 10 CFR 55.55a(g)(6)(i), relief can be granted as requested for RR No. 19.
Regarding Revision 2 and the January 25, 1993, submittal of the Program Plan, the staff has concluded that your response regarding the removal of insulation during pressure testing at bolted connections in piping systems used for controlling boration is still considered unacceptable, and you should either
.withdraw Request for Relief No.
13 or acknowledge it as being unacceptable by
'the staff in the Program Plan.
Therefore, due to inadequate VT-2 visual examinations of the bolted connections in borated
- systems, and Request for Relief No.
13 not having been
'9'309150264,. 930908 PDR ADOCK"05000244 P
Robert C. Mecredy September 8,
1993 withdrawn, the staff concludes that the Revision 2 submittal of January 25, 1993, is not in compliance with 10 CFR 50.55a(g) and Technical Specification 4.2.1.5 and is therefore unacceptable.
The staff's evaluation and conclusions are contained in the attached SE.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Original signed. by Ron Eaton for:
Walter R. Butler, Director Project Directorate I-3 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
- See revious concurrence OFFICE LA I-3 tie PM: PDI-3.
AJohnson:mw
- OGC D:
DATE t
9 93 I
5 93 09 02 93 93 OFFICIAL RECORD COPY FILENAME: A:iGIM84044. REL
Robert C. Mecredy September 8,
1993 withdrawn, the staff concludes that the Revision 2 submittal of January 25, 1993, is not in compliance with 10 CFR 50.55a(g) and Technical Specification 4.2. 1.5 and is therefore unacceptable.
The staff's evaluation and conclusions are contained in the attached SE.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Walt R. Butler, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
DISTRIBUTION:
Docket File
~NRC Ik Local~PQRs PDI-3 Reading T. Hurley/F.Hiraglia J. Partlow E. Rossi J.
Lieberman S. Varga J.
Calvo W. Butler S. Little A. Johnson OGC E. Jordan G. Hill (2 copies)
ACRS (10)
OPA OC/LFDCB V. HcCree, EDO J. Linville, RI T. HcLellan M. Khanna
Dr. Robert C. Mecredy R.E. Ginna Nuclear Power Plant CC:
Thomas A. Moslak, Senior Resident Inspector R.E.
Ginna Plant U.S. Nuclear Regulatory Commission 1503 Lake Road
- Ontario, New York 14519 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Ms.
Donna Ross Division of Policy Analysis
& Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223 Charlie Donaldson, Esq.
Assistant Attorney General New York Department of Law 120 Broadway New York, New York 10271 Nicholas S. Reynolds Winston 8 Strawn 1400 L St.
N.W.
Washington, DC 20005-3502 Ms. Thelma Wideman
- Director, Wayne County Emergency Management Office Wayne County Emergency Operations Center 7370 Route 31
- Lyons, New York 14489 Ms. Mary Louise Meisenzahl Administrator, Monroe County Office of Emergency Preparedness ill West Fall
- Road, Room ll Rochester, New York 14620