ML17263A521
| ML17263A521 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 01/11/1994 |
| From: | Mecredy R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Andrea Johnson NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17263A522 | List: |
| References | |
| TAC-M84004, TAC-M84044, TAC-M86225, NUDOCS 9401250041 | |
| Download: ML17263A521 (7) | |
Text
ACCELERATED DI TRJBUTION DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9401250041 DOC.DATE: 94/01/11 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas 6 Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
Project Directorate I-3
SUBJECT:
Forwards revised "ISI Program for 1990-1999 Interval," in response to WB Butler 930908 ltr.Revised ISI program incorporates listed major changes.
DISTRIBUTION CODE:
A047D COPIES RECEIVED LTR ENCL SIZE TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DOCKET 05000244
+ oe S
05000244 /
RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DSP/ROAB NRR/EMCB OC/LFDCB EG~FILE 01 EXTERNAL EGGG BROWN I B NRC PDR COPIES LTTR ENCL 1
0 2
2 1
1 1
1 1
0 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD NRR/DE/EMEB NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EGGG RANSOME,C NSIC COPIES LTTR ENCL 1
1' 1
1 1
1 0
1 1
1 1
1 1
D D
NOTE TO ALL"RIDS" RECIPIENTS D
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LIS13 FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 13
0 0
C
azure zrnnizl
'& z uuuzz Iuzuzz ROCHESTER GAS AND ELECTRIC CORPORATION o
Mte baal OPIA*
89 EAST AVENUE, ROCHESTER N.K f4649-0001 ROBERT C MECREDY Vice President Cinna Nuclear Production January 11, 1994 TELEPHONE anEA COOERS le 546-2700 U.S. Nuclear Regulatory Commission Document Control Desk Attn:
Allen R. Johnson Project Directorate I-3 Washington, D.C.
20555
Subject:
Submittal of Quality Assurance
- Manual, Appendix B (Inservice Inspection)
Program Revision for the 1990-1999 Interval R.E.
Ginna Nuclear Power Plant Docket No. 50-244 Ref.(a):
Letter from W. R. Butler (NRC) to R.
C. Mecredy (RG&E),
Subject:
Third 10-Year Interval Inservice Inspection Program Plan and Associated Relief Requests (TAC Nos.
M84044 and M86225), dated September 8,
1993 (b):
Letter from W. R. Butler (NRC) to R.
C. Mecredy (RG&E),
Subject:
Relief Request 23 and 24 (TAC No. 84004), dated June 29, 1993 (c):
Letter from A. R. Johnson (NRC), to R. C. Mecredy (RG&E),
Subject:
Issuance of Amendment No.
53 to Facility Operating License DPR-18, dated August 30, 1993
Dear Mr. Johnson:
The revised Inservice Inspection (ISI) Program for the 1990-1999 Third 10-Year interval for the R.
E. Ginna Nuclear Power Plant is hereby submitted.
Appendix B to the Quality Assurance Manual represents the ISI Program.
The revised ISI Program is submitted in response to Reference (a) and incorporates the following major changes:
approved Code Cases N-481 and N-491 in Section 1, paragraph 1.2.3.1; approved Relief Requests 19, 23 and 24 (per References a.
and b.) in Section 2;
incorporation of changes to Section 9, Snubber Program, pursuant to approved license Amendment No.
53 (Reference c) and Generic Letter 90-09; and Piping and Instrumentation Drawing (P&ID) revisions made since the previous ISI Program revision.
Changes to the Appendix B Program are annotated in the margins with change bars.
,9401250041 940111:
PDR-
'ADOCK 05000244, 8
PDR" (Oy'l ljl
f>iP
Paragraph 1.10.3.2 of Section 1
involved RG&Es proposed requirements for removal of insulation during VT-2 examination of bolted connections on systems containing borated water.
Section XI of the ASME Code requires the removal of insulation at bolted connections on all systems that contain borated water during the conduct of a
VT-2 visual examination.
The proposed paragraph, having been found unacceptable to the NRC staff in Reference (a),
has been deleted.
The NRC staff denied Requests for Relief Nos.
10 and 13 in the SER dated August 5, 1990.
NRC letter Reference (a) notes that RG&Es January 25, 1993 submittal of the Appendix B
Program withdrew Relief Request No. 10, however, did not withdraw Relief Request No.
13.
This latter Relief Request dealt with Non-ISI classified
- systems, which do not carry radioactive gases or fluids, that contain a line penetrating primary containment.
RG&E acknowledges that the NRC staff found Relief Request No.
13 unacceptable, as reiterated in Reference (a).
Consequently, the Appendix B Program, Section 2, Relief Requests, has removed Relief Request No.
13.
Table 1 of Section 2 and the text in the section state that this Relief Request is under revision. It is our intent to resubmit a
revised Relief Request No.
13 under separate
- cover, based upon new information which has transpired in the ASME Boiler and Pressure Vessel Code Committee.
Finally, listed below are the individual sections of RG&Es Appendix B ISI Program and current revisions:
Revision Date Section 1 Inservice Inspection Program for the 1990-1999 Interval 3
12/31/93 Section 2 ISI Relief Requests Section 3 P&ID Boundary Drawings Section 4 Code Tables Section 5 Line List Section 6 Allocation Tables Section 7 Block Listing Section 8 High Energy Program Section 9 Snubber Program Section 10 Seismic Support Program 12/31/93 12/31/93 12/31/93 12/31/93 12/31/93 12/31/93 12/31/93 12/31/93 12/31/93
Revision Date Section 11 Additional Programs 12/31/93 Very truly yours, Robert C. Mecr dy GAHE319 Attachment xc:
Mr. Allen R. Johnson (Mail Stop 14Dl)
Project Directorate I-3 Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector
1L Pw