Rev 10 to EOP AP-CCW.2, Loss of CCW During Power Operation
ML17263A257
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/21/1993
From: Marlow T
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17263A255 List:
References
AP-CCW.2, NUDOCS 9305140017
Download: ML17263A257 (11)


Text

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV:

10 PAGE 1 of 8 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION ONTROLLED COPY NUMBER TECHNICAL REVIEW PORC REVIE DATE PLANT S RINTE DENT EFFECTIVE D TE CATEGORY 1.0 REVIEWED BY:

mO514O0<7 9SOSO5 PDR ADOCK 05000244 F

PDR

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV 10 PAGE 2 of 8

A.

PURPOSE This procedure provides the steps necessary to respond to a loss of CCW while the plant is at power.

B.

ENTRY CONDITIONS/SYMPTOMS 1.

ENTRY CONDITIONS This procedure may be entered from:

a.

AP-CCW.1, LEAKAGE INTO THE COMPONENT COOLING SYSTEM, when CCW surge tank level decrease indicated at power.

2.

SYMPTOMS The symptoms of LOSS OF CCW DURING POWER OPERATION are; a.

Annunciator A-13 COMP COOLING SURGE TANK LO LEVEL 41.2%, lit, or b.

Annunciator A-22 CCW PUMP DISCHARGE LO PRESS 60 PSI, lit, or c.

Annunciator A-17, MOTOR OFF RCP CCWP, lit, or d.

Annunciator A-9, RHR PUMP COOLING WATER OUTLET LO FLOW 15 GPM, lit or e.

Annunciator A-6, CONT SPRAY PUMP COOLING WATER OUT LOW FLOW 15 GPM, lit or f.

Annunciator A-14, SAFETY INJ PUMPS COOLING WATER OUT LO FLOW 25 GPM, lit or g.

Annunciator A-7 (A-15),

RCP A (B)

CCW RETURN HI TEMP OR LO FLOW 165 GPM 125'F, lit or h.

Annunciator A-24 (A-32),

RCP A (B) OIL LEVEL + 1.25, lit.

EOP:

AP-CCWs2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV 10 PAGE 3 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION o

IF CCW FLOW TO A RCP IS INTERRUPTED FOR GREATER THAN 2 MINUTES OR IF EITHER RCP MOTOR BEARING TEMPERATURE EXCEEDS 200'F, THEN TRIP THE AFFECTED RCP.

o IF CCW IS LOST, THEN SEAL INJECTION SHOULD BE MAINTAINED TO THE RCP(S)

UNTIL RCS TEMPERATURE IS LESS THAN 200'F, OR UNTIL CCW IS RESTORED.

NOTE: If leakage from the CCW system is indicated, then refer to SC-6, HAZARDOUS AND MIXED WASTE MANAGEMENT AND CONTROL, for guidance.

1 Check CCW Pump Status:

o Both CCW pump breaker white disagreement lights EXTINGUISHED o

Annunciator A-17, Motor Off RCP CCP - EXTINGUISHED Perform the following:

a.

gnsure standby CCW pump running.

b. IF annunciator A-22, CCW PUMP DISCHARGE LO PRESS 60 PSI, lit, THEN check closed CCW to RHR HXs (MOV-738A and MOV-738B).

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

10 PAGE 4 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

CCW surge tank level should be verified locally in the AUX BLDG, if possible.

2 Verify CCW Surge Tank Level APPROXIMATELY 504 AND STABLE Perform the following:

a.

Open RMW to CCW surge tank, MOV-823 Start RMW pump(s).

c. IF surge tank level stable or increasing, THEN go to Step 3.

IF. CCW surge tank level can NOT be maintained greater than 10%,

THEN perform the following:

1) Trip the reactor.
2) Trip the RCPs.
3) Place both CCW pumps in pull stops 4)

Go to E-O, REACTOR TRIP OR SAFETY INJECTIONS

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV 10 PAGE 5 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED CAUTION IF ANY RCP IS TRIPPED, THEN SHUTDOWN MARGIN REQUIREMENTS SHOULD BE VERIFIED (REFER TO 0-3.1, BORON CONCENTRATION FOR XENON FREE ALL RODS IN MOST REACTIVE ROD STUCK OUT SHUTDOWN MARGIN).

3 Check CCW To Both RCPs:

o Annunciator A-7 (A-15),

RCP 1A (1B)

CCW return Hi temp or low flow 165 gpm 125'F alarm-EXTINGUISHED o

RCP motor bearings temperature (PPCS address GD-RCPS OR RCP temperature monitor RK-30A recorder)

< 200'F IF CCW lost to RCP(s),

THEN perform the following:

a. Trip the Rx.
b. Trip affected RCP(s).

c.

Go to E-O, REACTOR TRIP OR SAFETY INJECTION.

4 Check CCW Valve Alignment NORMAL (Refer to Attachment AT POWER CCW ALIGNMENT)

Align CCW valves as necessary.

EOP:

AP-CCW.2 TITLE:

LOSS OF CCW DURING POWER OPERATION REV:

10 PAGE 6 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED NOTE:

o An evaluation must be made to determine if operation may continue while investigating a

CCW leak in containment.

o Operation may continue with the reactor support coolers isolated.

If this occurs, notify higher supervision.

5 Check For CCW Leakage In CNMT:

a.

Check CNMT sump A level:

o Level STABLE o

Sump A pumps OFF

a. IF abnormal increase in CNMT sump level, THEN perform the following:

l) Direct HP Tech to sample sump A for chromates.

be RCP oil levels

- STABLE

2) Prepare to make CNMT entry to check for CCW leak.
b. IF any RCP oil level increasing uncontrollably, THEN perform the following:

l) Trip Reactor.

2) Trip affected RCP(s).

(

3) Close CCW supply and return for affected RCP(s).

~ RCP A, MOV-749A and MOV-759A

~ RCP B, MOV-749B and MOV-759B 4)

Go to E-O, REACTOR TRIP OR SAFETY INJECTION.

EOP:

AP-CCW.2 TITLE-LOSS OF CCW DURING POWER OPERATION REV:

10 PAGE 7 of 8 STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 6

Check for CCW Leakage In AUX BLDG o

Start frequency of AUX BLDG sump pump(s)

NORMAL (Refer to RCS daily leakage log) o Waste holdup tank level STABLE OR INCREASING AS EXPECTED Dispatch AO to investigate AUX BLDG for CCW leakage.

7 Verify CCW System Leak IDENTIFIED AND ISOLATED Perform the following:

a. Direct HP Tech to sample CCW HX SW outlet for chromates.
b. Return to Step 2.

8 Verify CCW Surge Tank Level APPROXIMATELY 504 AND STABLE Perform the following:

a.

Open RMW to CCW surge tank, MOV-823.

b. Start RMW pump(s).
c. Restore CCW surge tank level to 50%.
d. Stop RMW pump and close MOV-823.

9 Direct HP To Sample CCW System For Chromates

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV:

10 PAGE 8 of 8

STEP ACTION/EXPECTED RESPONSE

RESPONSE

NOT OBTAINED 10 Evaluate Plant Conditions:

a.

CCW system malfunction-IDENTIFIED AND CORRECTED

a. Return to Step l.

b.

CCW system status adequate for power operation (Refer to Tech Spec Section 3.3.3).

b. IF shutdown required, THEN refer to 0-2.1, NORMAL SHUTDOWN TO HOT SHUTDOWN.

NOTE:

Refer to 0-9.3, NRC IMMEDIATE NOTIFICATION, for reporting requirements.

11 Notify Higher Supervision 12 Return To Procedure Or Guidance In Effect

-END-

EOP:

AP-CCW.2 LOSS OF CCW DURING POWER OPERATION REV 10 PAGE 1 of 1 AP-CCW.2 APPENDIX LIST TITLE PAGES 1)

ATTACHMENT AT POWER CCW ALIGNMENT