05000244/LER-1980-005-01, /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position

From kanterella
(Redirected from ML17261A204)
Jump to navigation Jump to search
/01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position
ML17261A204
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/16/1980
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17250A336 List:
References
LER-80-005-01T, LER-80-5-1T, NUDOCS 8006190478
Download: ML17261A204 (4)


LER-1980-005, /01T-0:on 800603,during Performance of Monthly Verification Procedure,Loop a Accumulator Injection Circuit Breaker Found in on Position.Cause Not Stated.Breaker Returned to Off Position
Event date:
Report date:
2441980005R01 - NRC Website

text

NRC FQRM 366

{7~77)

.'07 7

8 CON'T

~01

~LQB 0

5 0

0 0

2 4

4 Qj 0

6 0

3 8

0 QB 0

6 1

6 8

0 Qg 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES 10 During performance of monthly verification rocedure S-30.1, A loo accumulator 7

8 iniection MOV-855 circuit breaker was found in ON position.

(T.S. 3.3.l.l.g) 4 The accumulator was available to erform its intended function as MOV was in safe-U. S. NUCLEAR REGULATORY COMMISSION 0

ICENSEE EVENT REPORT CONTROL BLOCK:

Q1 (PLEASE PRINT OR TYPE ALLREQUIRED INFORMATION)

I 6

NYREG I,.Q300-00000-00Q341111Q~QR 9

LICENSEE CODE 14 15 LICENSE NUMBER 26 LICENSE TYPE 30 57 CAT 58

~Q6 guards position, open.

Redundant accumulator was also available with proper ower arrangement.

~08 7

8 9

80

~og 7

8 o

SYSTEII'I

CAUSE

CAUSE COMP.

VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE Q1 Q>>

~ZQ>>

O K

T B

R K

Q4

~Q70

~ZQ70 9

10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERiRQ EVENT YEAR REPORT NO.

CODE TYPE NO.

Q>>

017007

~80

+

~00 5

QW

~01

+T

QO 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATTACHMENT NPRDQ PRIME COMP.

CahIPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.

SUPPLIER hIANUFACTURER

~QQ70 ~ZQ70

~ZQ30

~ZQ>>

0 0

0 0

~Y Q33

~NQ34

~NQ30 W

1 2

1 Qto 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 Breaker was immediately returned to OFF.

All breakers in S-30 series were reverified as in correct position.

Review of records showed docuinentation of proper position at 3 different times on 5/21/80, date of heatup.

Frequency of breaker position checks 7

8 9

FACILITY

~3P METHO STATUS

% POWER OTHER STATUS ~

DISCO 5

~E Qos ~10 0

Qto NA

~B 7

8 9

10 12 13 44 45 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITYQ3 liE Mz Q33 z

Q34 NA 7

8 9

10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Ag 7 ~00 0

Q17 Z

Qos 7

8 9

11 12 13 PERSONNEL INJURIES NUMBER DESCRIPTIONQ41 0 ~00 0

Q4o NA 7

8 9

11 12 LOSS OF OR DAMAGETO FAGILITYQ TYPE

DESCRIPTION

z Q42 NA ISSUED DESCRIPTION Q46 8 006 1 9 0 g

y

~NQ NA 8

9 10 D OF VERY Q31 Performing 46 80 DISCOVERY DESCRIPTION

@32 verification procedure 80 LOCATIONOF RELEASE Q36 NA 80 45 80 80 80 NRC USE ONLY 40 1

80 4s 0ft 68 69 PHDNE.

3 15/524-4446 Carl H. Peck NAME OF PREPARER 4

has been increased per change to procedure 0-9.1 Shift Relief Turnover-Aux.Operator.

4 1

I 1,

Attachment to LER 80-005/01T-0 Rochester Gas and Electric Corporation R. E. Ginna Nuclear Power Plant, Unit No.

1 Docket No. 50-244 During monthly performance of procedure S-30.1 Safety Injection Valve Position Verification on June 3, 1980 at 0645 hours0.00747 days <br />0.179 hours <br />0.00107 weeks <br />2.454225e-4 months <br /> it was discovered that the circuit breaker for the A Loop Accumulator injection MOV-865 was in the ON position.

This is contrary to Technical Specification section 3.3.1.1.g which calls for removal of A.C. power for certain valves in the open position.

The valve position was verified as proper and the breaker was immediately returned to the required position.

Allbreakers listed in

'he S-30 series of verification procedures were reverified as in the correct position.

A review of the records shows that the breaker was placed in the correct position on May 21, 1980 per procedure 0-1.1, Plant Heatup from Cold Shutdown to Hot Shutdown.

This correct position was confirmed later the same day by Procedure 0-1.1C, Precritical Technical Specification Check Sheet.

The correct position was then verified later the same day by Procedure S-30.1, Safety Injection System Valve Position Verification.

The frequency of circuit breaker checks 'has been increased by amending procedure 0-9.1 Shift Relief Turnover-Auxiliary Operator to include checks by each shift.