Forwards Listing of Fire Protection Open Items Per 810126 Request.Request for Extension of Completion Date of Items Listed in Group 1 Until 810630 Approved.Fr Notice Encl
ML17258A824
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/13/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Maier J
ROCHESTER GAS & ELECTRIC CORP.
Shared Package
ML17258A825 List:
References
LSO5-81-02-026, LSO5-81-2-26, NUDOCS 8102270689
Download: ML17258A824 (12)


Text

Docket No. 50-244 LS05-81-02-026 FEBRUARY g 3 188 188]

Mr. John E. Maier Vice President Electric and Steam Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Mr. Maier:

I CV r

~OI>

Me have completed our review of your letter dated January 26, 1981, in which you requested an extension of the completion dates for several items related to fire protection at the R.E. Ginna Nuclear Power Plant.

The incomplete items at Ginna, including those for which you requested extension.

can be divided into four groups, as follows:

I.

Items approved in the Fire Protection Safety Evaluation (FPSE) dated February 14, 1979, and for which you have requested extension of the completion dates.

3.1.1 Fire Detection Systems 3.1.2 Mater Suppression Systems,,and Equipment 3.1.3 Gas Suppression Systems and Equipment 3.1.5 Fire Doors 3.1.7 Mater Spray Shields 3.1.8 Fire Barriers 3.1.9 Fire Dampers 3.1.12 Fire Alarms 3.1.19 Diesel Room Mater Suppression System 3.1.37 Fire Dampers 3.1.39 Reactor Coolant Pump Lube Oil Collection System 3.1.42 Signaling Circuits Supervision 3.1.49 Kitchen Area 3.2.3 Relay Room Halon System Test II. Items approved by FPSE Supplement

1. dated December 17, 19BO.

3.1.11 3.1.21 3.1.48 3.2.6 Battery Room Ventilation Control Room Separation (Control room water curtain)

Hydrogen Piping Backflow Protection 7

81082VQgg~

P I

P tt

~

t'

~

I t.

P P

P'

~

mr. uun<<r.. rIalel

~e g a 0...-

6'-

PPBROARY 1 S 1981 III.

Items approved by FPSE Supplement 2, dated February.6, 1981.-

3.2.8 g

Ex osed Structura1 Steel (partially approved-additional work required ~<ill fall under rules.

of 10 CFR 50 Appendix R - See Group IV)

IV.

Items falling under 10 CFR 50, Appendix R requirements.,

3.2,1 3 2' 3.2.8 Shutdown Analysis (extensive modifications r equired-see Enclosure 2 to November 24, 1980 letter)

Cable Separation Exposed Structural Steel (See Group III and FPSE Supplement 2)

In support of your request for extension of the completion dates, you indicated that you had proceeded in accordance with the completion dates originally established in the FPSE of February 14, 1979, including the granting of overtime for both design and construction efforts.

-You also noted the schedule changes mandated by the recent revisions to 10 CFR 50, which would require) that all modifications already approved by NRC should have been completed within one year of such approval.

Further, you quoted from the NRC staff's February 14, 1979 FPSE that (emphasis yours):

"the o eration of the facilit endin resolution of the incom ete tems an t e m

ementat on of al ac 1 t modifications oes not resent an undue risk to the ealth an safet of the public base on our concurrence with the Browns Ferry Special Review Group's conclusions identified above, as well as the si nificant im rovements

.in fire rotection alread made at the facilit since the Browns Ferry fire.

These nclude esta shment of adminis-trative controls over combustible materials and use of ignition sources, training and staffing of a fire brigade, and issuance of technical specifications to provide limiting conditions for operation and surveillance requirements on fire protection systems."

Based on our review, we conclude that because you were working to a previous schedule that had been approved by the NRC staff and when you

learned, upon the publication of the proposed 10 CFR 50.48, that the schedule would have to be shortened, you expedited the design.

manu-facturing and installation activities to the extent possible.

there is good cause for extending the completion date for the Items listed in Group I above to June 30, 1981,,

and that the public health and safety is not adversely affected by such extension.

/

~r u

~ I" t'

P

Mr. John E. Maier 3

w FEBRUARY ] 3 IIIBI Accordingly, pursuant to 10 CFR 50.48(d), the date for completion of the fourteen items in Group I above is hereby extended to June 30, 1981'.

The completion dates for Groups II, III, and IV are as determined by 10 CFR 50.48(d).

A copy of the related Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is provided as Enclosure 1.

Sincerely, Original Sig4@

E. G. Cae Harold R. Denton, Director ffice of Nuclear Reactor Regulation cc:

See next page DISTRIBUTION:

Docket NRC PDR Local PDR TERA NSIC DCrutchfield HSmith RSnaider TWambaclh'Diggs OELD OI@E (3)

TBarnhart (4)'CRS (16)

CMiles, OPA SECY SAgga JHeltemes Gray File Xtra Cy (6)

R chaf stall, KMC

  • ORB ¹5 RSnaider:dkn 2/10/81
  • OELD EKetchen 2'/ll /81
  • SEE PREVIOUS TISSUE FOR CONCURRENCES OFFICE)

'o SURNAME)

OAFED DL:

ORB ¹5*

Twambach g/10(81 b,....

DL:

ORB ¹X*

HSmith 2/10/81

.NRC FORM 318110 801NRCM 0240 1'L:

ORB ¹5*

DCrutchfield 2/10/81 DL:AD/SA*

GLainas 2/11/81 DL DGEi ut OFFICIAL R EGO R D COPY DD:

R ECa NR

~ ~ ~ ~ ~

~

~

~

H9 n

~ ~ ~

~ i 0

~ ~ ~ ~ ~ ~ ~ ~

~

o USGPO: 1980-828.824

Cr I p>q'

'~

e 4<

I

a v'

~

a Nr. John E. l1aier

~ Accordingly, pursuant to 10 CFR 50.48(d), the date for completion of the fourteen items in Group I above is hereby extended to June 30, 1981.

The completion dates for Groups II, III, and IV are as determined by

.10 CFR 50.48(d).

Sincerely, OriKinai Signe< 5 g G. Case roid R. Denton, Director fice of Nucleai Reactor Regulation cc:

See next page OFFICE)

SURNAME)

DATEP TWam+

2/ 1F/81 H

jth 2/J~/81

'DL RSnaider:dkn 2/PQ/81 ORB//5:DL 0

DL 2/I0 /81 2/li/81 C/

DL gA: DL DC field G Lainas D:DL DEisenhut 2/

/81 DD'NRR ECase

~ ~ ~ ~ ~

~ ~

~

2/

/81

- D:NRR HRDenton 2/

/81 NRC FORM 318110/801 NRCM 0240 OFF lClAL RECORD COPY aa USGPO.'980-329.824

Cfr ~ 4

~S RE00 P0 Cy I

O

+

0

++*++

Docket No. 50-244 LS05-81-02-026 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 13, 1981 Mr. John E. Maier Vice President Electric and Steam Production Rochester Gas and Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Mr. Maier:

We have completed our review of your letter dated January 26, 1981, in which you requested an extension of the completion dates for several items related to fire protection at the R.E. Ginna Nuclear Power Plant.

The incomplete items at Ginna, including those for which you requested extension, can be divided into four groups, as follows:

I.

Items approved in the Fire Protection Safety Evaluation (FPSE) dated February 14, 1979, and for which you have requested extension of the completion dates.

3.1.1 3.1.2 3.1.3 3.1.5 3.1.7 3.1.8 3.1.9 3.1.12 3.1.19 3.1.37 3.1.39 3.1.42 3.1.49 3.2.3 Fire Detection Systems Water Suppression Systems: and Equipment Gas Suppression Systems and Equipment Fire Doors Water Spray Shields Fire Barriers Fire Dampers Fire Alarms Diesel Room Water Suppression System Fire Dampers Reactor Coolant Pump Lube Oil Collection System Signaling Circuits Supervision Kitchen Area Relay Room Halon System Test II. Items approved by FPSE Supplement 1, dated December 17, 1980.

3.1.11 3.1. 21 3.1.48 3.2.6 Battery Room Ventilation Control Room Separation (Control room water curtain)

Hydrogen Piping Backflow Protection

Nr. John E. Maier III.

Items approved by FPSE Supplement 2, dated February 6, 1981.

3.2.8 Exposed Structural Steel (partially approved-additional work required will fall under rules of 10 CFR 50 Appendix R - See Group IV)

IV.

Items falling under 10 CFR 50, Appendix R requirements.

3.2.1 3.2.2 3.2.8 Shutdown Analysis (extensive modifications required-see Enclosure 2 to November 24, 1980 letter)

Cable Separation Exposed Structural Steel (See Group III and FPSE Supplement 2)

In support of your request for extension of the completion dates, you indicated that you had proceeded in accordance with the completion dates originally established in the FPSE of February 14, 1979, including the granting of overtime for both design and construction efforts.

You also noted the schedule changes mandated by the recent revisions to 10 CFR 50, which would require that all modificatio'ns already aoorov'ed by NRC should have been completed within one year of such approval.

Further, you quoted from the NRC staff's February 14, 1979 FPSE that (emphasis yours):

"the o eration of the facilit,

endin resolution of the incom lete items and the im lementation of all facilit modifications does not resent an undue risk to the health and safet of the public based on our concurrence with the Browns Ferry Special Review Group's conclusions identified above, as well as the si nificant im rovements in fire rotection alread made at the facilit since the Browns Ferry fire.

These include establishment of adminis-trative controls over combustible materials and use of ignition sources, training and staffing of a fire brigade, and issuance of technical specifications to provide limiting conditions for operation and surveillance requirements on fire protection systems."

Based on our review, we conclude that because you were working to a previous schedule that had been approved by the NRC:staff and when you

learned, upon the publication of the proposed 10 CFR 50.48, that the schedule would have to be shortened, you expedited the design, manu-facturing and installation activities to the extent possible, ther e is good cause for extending the completion date for the Items listed in.

Group I above to June 30, 1981, and that the public health and safety is not adversely affected by such extension.

Mr. John E. Maier February 13, 1981 Accordingly, pursuant to 10 CFR 50.48(d), the date for completion of the fourteen items in Group I above is hereby extended to June 30, 1981.

The completion dates for Groups II, III, and IV are as determined by 10 CFR 50.48(d).

A copy of the related Notice of Extension, which is being forwarded to the Office of the Federal Register for publication, is provided as Enclosure l.

Sine rely, cc:

See next page Harold R. Denton, Director Office of Nuclear Reactor Regulation

Mr. John E. Maier

- 4 February 13, 1981 cc w/enclosur e:

Harry H. Voigt, Esquire

LeBoeuf, Lamb, Leiby and MacRae 1333 New Hampshire Avenue, N.

W.

Suite 1100 Washington, D. C.

20036 Mr. Michael Slade 12 Trailwood Circle Rochester, New York 14618 Rochester Comnittee for Sci ent ific Informat ion Robert E. Lee, Ph.D.

P. 0.

Box 5236 River Campus Station Rochester, New York 14627 Jeffrey Cohen New York State Energy Office Swan Street Building Core 1, Second Floor Empire State Plaza

Albany, New York 12223 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Rochester Public Library 115 South Avenue Rochester, New York 14604 Supervisor of the Town of Ontari o 107 Ridge Road West
Ontario, New York 14519 Resident Inspector R. E. Ginna Plant c/o U. S.

NRC 1503 Lake Road

Ontario, New York 14519 Ezra I. Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center, New York, New York 10047 r

Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)

U. S. Environmental Protection Agency Washington, D. C.

20460 U. S. Environmental Protection Agency Region II Office ATTN:

EIS COORD INATOR 26 Federal Plaza New York, New York 10007 Herbert Grossman, Esq.,

Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Comnission Washington, D. C.

20555 Dr. Richard F. Cole Atomic Safety and Licensing Board U. S. Nuclear Regulatory Coomission Washington, D. C.

20555 Dr.

Emmeth A. Luebke Atomic Safety and Licensing Board U. S. Nuclear Regulatory Cormission Washington, D. C.

20555 Mr. Thomas B. Cochran Natural Resources Defense Council, I~

1725 I Street, N.

W.

Suite 600 Washington, D. C.

20006