ML17251A598

From kanterella
Jump to navigation Jump to search
Proposed Revised Corrected Tech Spec Page 3.5-22 Re Radiation Accident Monitoring Instrumentation
ML17251A598
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/07/1986
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17251A597 List:
References
NUDOCS 8603110371
Download: ML17251A598 (2)


Text

TABLE 3.5-7 Radiation Accident Monitorin Instrumentation Minimum Channels Instrument ~Oerab le Action

1. Containment Area (R-29 and R-30)
2. Noble Gas Effluent Monitors Plant Vent (R-14A)

A Main Steam Line (R-31)

B Main Steam Line (R-32) 1V. Containment Purge (R-12A)

V. Air Ejector (R-15A)

Action Statements Action 1 With the number of operable channels less than required by the Minimum Channels Operable requirements, either restore the inoperable channel(s) to operable status within 7 days of the event, or prepare and submit a Special Report to the Commission within 30 days following the event outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to operable status.

  • only when the shutdown purge system flanges are removed.

8603k 1 0371 860307 PDR ADOCK 05000244 ,

3.5 22 proposed PDR i

I II