Safety Insp Rept 50-244/88-14 on 880726-29.Violation Noted. Major Areas Inspected:Emergency Preparedness Program, Emergency Response Facilities & Emergency Preparedness Training Program
ML17251A289
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/27/1988
From: Amato C, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17251A281 List:
References
50-244-88-14, NUDOCS 8810030121
Download: ML17251A289 (16)


See also: IR 05000244/1988014

Text

U.S. Nuclear Regulatory

Commission

Region I

Report No.

50-244/88-14

Docket No.

50-244

License

No.

DPR-18

Priority

Category

C

Licensee:

Rochester

Gas

and Electric Cor oration

89 East

Avenue

Rochester

New York

14649-0001

Faci'lity Name:

Robert

E. Ginna Nuclear

Power Plant

Inspection At: Ontario Townshi

Rochester

and Mebster

New York

Inspection

Conducted:

Jul

26-29

1988

Inspector:

C

.

G.

ato,

EPS

EP

FRSSB,

DR

date

Approved By:

~l

"d:

i,

d.

i

  • i

h

Emergency

Preparedness

Program,

Emergency

Response

Facilities

and

Emergency

Preparedness

Training Program.

s-M

M.

Lazgru

, Chief,

EPS,

FRSSB,

DRSS

.

date

Inspection

Summary:

Ins ection

on Jul

26-29,

1988

Ins ection

No. 50-244/88-14

Results:

One violation was identified.

There were

no deviations

and there

were three unresolved

items.

DETAILS

1.0 Persons

Contacted

The following personnel

attended

the exit meeting.

C.

R.

D.

W.

D.

E.

D.

L.

R.

C.

B.

R.

B. A.

S.

M.

Anderson,

Manager, guality Assurance

Burke, Corporate

Emergency

Planner

Eilion, Radiochemist

Filhins, Manager,

Health Physics

and Chemistry

Mecredy, Director, Engineering

Services

guinn, Corporate

Health Physicist

Snow, Superintendent,

Nuclear Production

Spector,

Superintendent,

R.

E. Ginna Nuclear Station

The inspector also observed

the actions of, or interviewed other personnel.

2.0

Emer ency Pre aredness

Or anization

2. 1

Emergency

Preparedness

(EP) is an activity at Rochester

Gas

and

Electric for which one individual, the Corporate

Emergency

Planner

(CEP), is responsible.

The

CEP is not located at the. Ginna site but

rather at the executive office in Rochester

some distance

from the

site.

The

CEP is one of seven individuals reporting to the Director,

Engineering

Services.

The

CEP does

not have full or part time

dedicated clerical or administrative

support.

Currently, the

CEP is

supported

by a contractor

employee

on about

a half time basis.

Additional support is provided by headquarters

and site

organizational

units.

2.2

The inspector identified at least

45 recurring activities the

CEP

must undertake

on an annual

basis to maintain

EP at Ginna

and the

Corporate offices.

Some of these activities involve interfaces with

the State

and County governments

and these

in addition to others

are not easily

scheduled.

One recommendation

of an internal audit

commissioned by'he licensee is to expand the

EP function to four

individuals with clerical support

and assigning

at least

one of the

four individuals to the site.

2.3 'he

CEP has.announced

his retirement plans;

he will retire in about

20 months.

The licensee's

management

has stated

a successor will be

assigned

to this position

so there is at least

a year's

overlap

before the incumbent

CEP leaves.

Although there is

a concern

regarding

the level of staffing, performance

has

been acceptable.

This area will be carefully evaluated

as

changes

occur over this next two years.

C

l

~

1

~

t

3.0

The

Emer enc

0 eration Facilit

Status

3.1

The Emergency Operations Facility (EOF) is located in the basement

of an Annex to the Corporate

Headquarters.

Two rooms

and

a

Communications

Bay extend

from the building line beneath

the sidewalk

to the curb line.

The Rochester

City Government,

in keeping with a

master plan, will rebuild streets

and side walks in center

Rochester

including the street

and side walk in front of the building housing

the

EOF.

This will result in the ceiling for the

rooms

and bay noted

above

being uncovered creating

a potential

safety hazard

and

rendering part of the

EOF inoperable.

3.2

The affected

area contains

the

EOF Manager's

Conference

room and

FEMA/NYS room.

Phone lines in the bay do not include the

NRC

Emergency Notification System

(ENS).

The licensee will relocate

phones without interrupting service

and also relocate

the two rooms.

A temporary wall will then

be built to seal off the impacted

area,

These

steps

should insure

EOF availability and maintenance

of the

1988 exercise

schedule.

The licensee

agreed

to advise

the

NRC in

writing as to the progress

of these

changes.

These

changes will be

evaluated

in the upcoming exercise.

4.0 Inde endent/Reviews

Audits

4.1

10 CFR 50.54(t) requires

power reactor

licensees

in the area of

emergency

preparedness

to:

perform

a review/audit at least every

12

months, with a part of this audit including determination of the

adequacy of the State

and local government interface

and

make

available

the results of the interface determination

to the State

and

local governments.

Based

on

a review of audit records

the licensee

failed to evaluate

the interface

adequacy for four of the

seven years

these

reviews/audits

were conducted

and, further, did not make

results available to

New York State

and the Counties of Monroe and

Wayne except for one year of the

seven

reviewed.

The

1988

review/audit

had been

completed prior to this inspection

and did not

address

the adequacy

of the interface

between

the state

and local

government

and the Licensee.

When this omission

was called to the

atten'tion of licensee

management,

the review/audit

was reopened

and

completed prior to the conclusion of this inspection.

Results

were

made available to the State

and Counties.

In response

to

NRC

initiatives, the

scope

and quality of this review/audit was

expanded

and improved.

This is identified as

a violation.

(50-244/88-14-01)

5.0

Emer ency

Res

onse Facilities

ERFs

5.1

Inspections

were performed of the

EOF, Technical

Support Center

(TSC), Operations

Support Center

(OSC)

Emergency

Survey Center

(ESC), Control

Room and the Media Center.

The inspector verified

'F

~

~

that plans

and procedures

were current,

equipment

and communi-

cations

systems

were checked for operability and equipment

was in

calibration.

No inadequacies

were identified.

5.2

Eighteen different sets of Plans

and Procedures

comprise the Nuclear

Emergency

Response

Plans

(NERP) for Ginna;

those relating to

EP are

designated

Station Contingency

(SC) procedures.

SC procedures

were

reviewed

and found to be current.

Monitoring equipment

was found to

be operable

and within the calibration window.

Field sampling

procedures

require collection of an air sample for ten minutes at

a

rate of 30 liters per minute.

The licensee

could not state

the basis

for this collection volume and rate

and agreed

to locate

and review

it to determine if volume and collection could be reduced for given

efficiencies

and statistical

performance

specifications.

This item

is unresolved.

(50-244/88-14-02)

5.3

The Media Center or Joint

News Center is

a dedicated facility located

in the basement

of Corporate

headquarters.

Five rooms are provided

for government

use including the

NRC.

The press briefing room will

seat

about

250;

12 press

phones

are provided.

Plant schematics,

maps

etc.

are wall mounted.

There is an Emergency

Broadcast

System

(EBS)

room and

an area dedicated

to rumor control which will accommodate

a

staff of seven.

Media procedurep

are reviewed annually,

a media

briefing packet is available

and the

1988 Media briefing meeting

has

been held.-

No inadequacies

were identified.

5.4

The

EOF is divided into seven

areas

and

rooms; there

are

68 phones

including NRC's

ENS and N.Y. State's

Radiological

Emergency

Communications

Systems

(REGS).

The dose

assessment

area is small

and

was crowded during the July drill.

Four dose projection

methodologies

are available:

hand calculations;

over-lays normalized

to unit release

for each stability category;

a

PC using software

called

Symphony;

and

a vendor

system

known as Meteorological Infor-

mation

Dose Assessment

System

(MIDAS).

The

PC software is based

on

a

straight line Gaussian

and is classified

as

an extended

Class

A

Model; the software is also capable of doing

a plume

segmented

calculation.

Midas is

a Class

B m'odel

a'nd

can

h'andle deposition

calculations.

Site data,

in this case,

may be imported at vendor's

remote terminal.

5.5

Severe Accident Analysis and Core

Damage

assessment

(CDA) will be

done at the

EOF.

Procedures

for CDA are available

and are

based

on

PASS data.-

A Protective Action Recommendation

Board

and

a

Classification

are wall mounted in the

EOF.

No inadequacies

were

identified.

'

%

~ 1

'

~

k

l

I

e

'I

t

~

5.6

EOF Operating

Procedures

are not subject to review by the Plant

Operating

review Committee or (}uality Assurance.

Rather,

they are

reviewed

by

a Milestone

Committee.

The Inspector could not locate

a basis for this committee in the License or Technical Specifica-

tions.

This item is unresolved.

(50-244/88-14-03)

6.0 Off-Si'te Activities

6. 1

Approximately, 34,000

emergency

information brochures,

in the form of

calendars

have

been distributed.

A full page insert appears

in the

NYNEX yellow pages for Rochester

and

Wayne County.

Transient

briefing material

has

been

prepared.

6.2

Ninety six sirens

are located

in the

16 Emergency

Response

Planning

Areas.

In addition,

47 Tone Alert Radios

have

been distributed.

Verification systems

are being installed

on

23 of the sirens.

During

1987,

siren availability was

97%.

All eight of the

Tone Alert Radios

which malfunctioned

have

been replaced.

Results

have

been

sent to

the

NYS Radiological

Emergency

Preparedness

Group

(REPG) for

re-transmittal

to

US Federal

Emergency

Management

Agency,

Region II.

6.3

Surface

water clearance

procedures

have

been developed

which are

implemented

by the U.S.

Coast

Guard

and

The County Sheriff.

Per

Letter of Agreement,

NYS will advise

the Gntario Provincial

Government of an incident at Ginna.

6.4

Evacuation

Time Estimates

were last updated

in 1986.

Road

capacities,

ETEs for residents

and transients

were developed

using

seven

scenarios

including peak

season

and winter snow conditions.

Traffic Control Points were identified, evacuation

routes outlined

and consideration

was given to migrant workers, hospitals,

parks

and

special

care facilities.

6.5

Emergency Action Level Classification

and Protective Action

Recommendations

were discussed

with off-site authorities.

6.6

Off-s'ite training is the responsibility of a

number of different

organizations.

A contractor provides training for support hospitals

and ambulance

crews,

Plant Safety trains fire-fighters,

and

NYS

REPG

is responsible

for the Sheriff's Deputies.

1988 training is on-going.

6.7

Letters of Agreement with off-site entities

were reviewed

and appear

current.

4'

I

hk

Based

on the above this portion of the licensee's

Emergency

Preparedness

Program is adequate.

7.0

Emer enc

0 eratin

Procedures

EOPs

Emer enc

Action Levels

EALs

and Protective Action Recommendations

PARs

7.1

EOP E-0 contains

a referral to Classification

and Notification

procedures;

referrals

appear

in Administrative Procedures.

EOPs

do not go to core melt conditions.

7.2

Classification is based

on events

and

symptoms;

EALs are placed in

one of 18 groups.

Guidance

in I&E Information Notice 83-28 is

followed.

7.3

PARs

may be based

on plant conditions

and comparison of projected

doses with EPA's Protective Action Guides.

Provision is made for a

PAR following discussion

between

the

EOF, site, off-site authorities,

NRC,

EOF, engineering

and dose projectionists.

PARs are

made

on

an

ERPA basis.

PARs are consistent with federal

guidance

and the

requirement of 10 CFR 50.47(b)(10) is met.

Based

on the above, this portion of the Licensee's

Emergency

Preparedness

Program is adequate.

8.0 ~inainin

8.1

8.2

Site Training encompasses ll programs at Ginna

and is divided into

three groups:

Ginna; Maintenance;

and Technical-Support-Management

(TSM).

EP training with the exception of EOF operations

is included

within this program.

Each

employee

each year

must develop

a Job

Plan,

one element of which requires

100% completion of all required

training.

Employees

are rated

by comparing

performance

against

the

Job Plan.

When

a training module is scheduled,

an alternate

date

is also selected.

Additional make-ups

were given to compensate

for

nonattendance

during scheduled

sessions.

Exams are given and records

are retained.

Last year,

the average

grade

was

97%.

There'are

38 Emergency

Response

Organization

(ERO) positions

and

19

associated

lesson

plans

and modules.

PAR training was given during

May 1988.

Maintenance

is

100% qualified and all but two TSMs are

qualified.

A lesson

plan exists for CDA; there is no lesson

plan for

severe

accident analysis.

Operators

receive

EP training including

classification

and notification.

Emergency

communication

equipment

is being installed

in the simulator for future training use.

There

are at least three qualified managers

for each

ERO key position.

F

\\

0

'A l

~

~

4

k

~

h

I

Based

on the above, this portion of the Licensee's

Emergency

Preparedness

Program is. adequate.

9.0

Unusual

Event Declaration

9. 1

On July 16, 1988, Substation

13A, the preferred

power source,

was

lost.

Procedures

were followed and

a

UE was correctly declared.

Timely notification was given to the State

and Counties plus the

NRC.

Security officers who heard

the noise of the substation

breaker

tripping, reported it to the Control

Room as

a possible

explosion

in

accordance

with Security procedures.

Response

to this event

was prompt and correct.

10. 1 The resident

inspector

and the

EP inspector

observed training drill

activities at the

TSC and

EOF.

The inspectors

concluded that the

drill was effective training and in identifying areas

for

improvement.

11.0 Meteorolo ical

MET

Tower Sensor

and Vent Monitor Calibration

11. 1 The primary and two back-up

MET towers were located

and sensor

calibration records

for wind velocity and temperature

sensors

were

reviewed

as were data for electronic calibration.

The most recent

calibration

was completed July,

1988.

Calibration for monitors which

may measure

accident

releases

were also checked.

The calibration for

1988

had

been

completed but the report

had not been

released.

Based

on the above, calibration procedures

are in place

and

a calibration

schedule

is being followed.

12.0 Default Values

12. 1 Under certain accident conditions,

data permitting determination

of an

I/NG ratio may not be 'immediately available.

A default value

of 0.0001 will be used for non-steam

releases

and 0.01 for steam

releases.

If release

duration cannot

be estimated,

a value of four

hours is to be used.

However,

some plant procedures

specify other

values.

The State

and Counties

have indicated they expect

co'nsi stency in these

areas

and will not accept

long time release

duration estimates.

This matter is unresolved

and will be subject to

a future inspection.

50-244/88-14-08

The inspectors

met with the licensee

personnel

listed in Section

1 of

this report at the conclusion of the inspection.

The license

was advised

one violation was identified, three unresolved

items were identified,

and

there were

no deviations.

The inspectors

also identified areas for

improvement.

The licensee

acknowledged

these findings and agreed to

evaluate

them, institute corrective actions

as necessary

and include

corrections

in the Plan

and Procedures.

At no time during the course of

the inspection did the inspectors

give the licensee written material.