ACCELEBRATED 3)1 BUTION DEMONSTRA.'EON SYFI'EM
~
I
~
REGULATO INPORMATZON DISTRIBUTION/STEM (RIDE)
C6 1%
DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH.NAME AUTHOR AFFIL1ATION MCNAMARA,A.E.
Rochester Gas
& Electric Corp.
SNOW,B.A.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for June 1988 for Ginna Station.
W/880612 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR L ENCL I
SIRE:
TITLE: Monthly Operating. Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
05000244'ECIPIENT ID CODE/NAME PD1-3 LA STAHLEEC INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN1 EXTERNAL'G&G WILLIAMSI S NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NR PB 10 G FIL 01 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 D
R j
h'OTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
OPERATING DATA REPORT DOCKET NO.
50-244 DATE COMPLETED BY Andrew E.
McN ra' OPERATING STATUS TELEPHONE Ginna Station
- l. Unit Name:
R.E. 6INNA NUCLEAR POWER PLANT Notes
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Nct MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
1520 490 470 490 The reactor power level was maintained at 100K in the report period with two excep-tions, detailed on pages 3 and 4.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, IfAny (Net MWc):
- 10. Reasons For Restrictions, If Any:
This Month Yr. to-Date Cumulative 4 3 7.0 3 277.27 3 206.25 93 36 73.42K 89.13K
- 11. Hours In Reporting Period 720
- 12. Number of Hours Reactor Was Critical 648.07
- 13. Reactor Reserve Shutdown Hours 44SE
- 14. Hours Gcncrator On-Linc 641.75
'5.
Unit Reserve Shutdown Hours 4
- 17. Gross Electrical Energy Generated (MWH) 1 522 548
- 18. Nct Flectrical Energy Gcneratcd (hlWH) 1 455 655
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 22. Unit Capacity Factor (Using.DER Nct) 88.53K 70.43K 23 Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
127 295.74 124 884.63 8.5
- 57 605 133 54 656 939 76.61K 72.78K 6 57K 25 ~ If Shut Down At End Of Report.Period, Estimated Date of Startup:
- 26. Units ln Test Status (Prior to Commercial Operation):
4 INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
- Cummulative Total Commencing January 1,
1975 PDR ADDCIr 050 44 PN~U~
Forecast Achieved SEE.EIE ESSE
$ $li
'I 1
l l'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE J
12 1988 COMPLETED BY Andrew E.
McNamara MONTH June 1988 TELEPHONE 1
315 524-4446 Ext.
301 at Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net)'AY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~
- 480 17 ~
483 2 ~
3 ~
4 ~
5 ~
6.
- 158 330 18.
19.
20
'1
~
22.
483 483 480 482 483 7 ~
8 ~
9 ~
10'86 487 487 487 487 23
'4
'5
'6.
27'81 481 482 481 481 12
'3
'4
'5.
16
'85 486 486 484 483 28.
29.
30 ~
31.
484 484 484
- Online net - unit offline 9 1930, see page 4 of report.
unit online 9 0145, see page 4 of report.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT hfONTH JUNE 1988 DOCKET NO.
SO 244 UNl'l NAME R.E. GINNA NUCLEAR POWER PLANT DATE 8.
COMPLETED BY Andrew E.
McNa ra 1 I LEPHONE
-3 Ginna Station No.
Date 0I 0
00 00 CL 0
c 00 OV)
C 0
Cl Licensee Event Report iI Ew 0
0 IA 00 Io c
0 0
E 0
O Cause gI Corrective Action to Prevent Recurrence 88-4 6-1-88 78.25 A
3 88-005 CH INSTRU Reactor trip "B.". Steam Generator Lo Feed Flow Lo Level, due to feed flow instrument failure.
1 F: Forced S:
Scheduled Rtv. 4/85 49.89 Reason:
A-EIluipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hfcthod:
1-Manual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhtbtt G Instructtons for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Jul 12 1988 COMPLETED BY Andrew E.
McNamara TELEPHONE 1
315 524-4446 EXT. 301 at Ginna MONTH June 1988 The reactor power level was maintained at 1004 for the majority of the report period, with the following two exceptions:
On 6/1/88 a reactor trip followed by turbine trip occurred caused by "B" Steam Generator low feed flow low level, due to instrument failure.
The unit was returned to service on 6/5 and reached 100% reactor power level on 6/6/88.
On 6/20/88 the reactor power level was reduced to 984 for a short period to perform PT-16, a Periodic Test on the Auxiliary Feedwater System.
The power level remained at 1004 for the remainder of the report period.
e GINNA STATION MAINTENANCE REPORT
SUMMARY
- JUNE, 1988 During the month of June, routine maintenance and inspections were completed.
Major safety related work included:
a ~
"B" Containment Spray Pump Corrective Maintenance b.
c ~
d.
e.
MOV 3601A, and MOV 3602A - MOVATS Snubber Inspection per M-40 Reactor Coolant Drain Tank Pump clean strainers Charging Pump Drain Line - weld repair
N
'P r
p
I
//////////////
/IIIIIIIIIII/
EII// III lilÃl/II!II
/IIIIIII/
StZW>I/
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLCPHOHC ARKA cooc 7ld 546.2700 GINNA STATION June 12, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for June, 1988 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1988.
Very truly yours, Bruce A. Snow Superintendent Nuclear Production BAS/eeh Attachments cc:
Mr. William T. Russell NRC (1)