|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20245D9851989-06-22022 June 1989 Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20246M7331989-03-15015 March 1989 Responds to NRC Info Notice 88-082, Torus Shells W/ Corrosion & Degraded Coatings in BWR Containments. Summary of Relevant Projects for Various Utils Successfully Employing Underwater Alternative to Draining Vessel Encl ML17342A7741987-07-13013 July 1987 Forwards Technical Evaluation of Rept, Retran Code: Transient Analysis Model Qualification, Dtd Jul 1985. Criteria for Use of Single & Two Loop Plant Models Listed. NRC Audit of Util QA Procedure Recommended ML20238E3011987-06-29029 June 1987 FOIA Request for All Documents Described in App,Including Listed LERs & Revs for Plants,W/Original Attachments & Encls ML17219A6851987-06-25025 June 1987 Forwards EGG-NTA-7657, Conformance to Generic Ltr 83-28, Item 2.2.2, 'Vendor Interface Programs for All Other Safety-Related ...,' Final Rept.Plant Does Not Conform to Item.Description of Contact W/Supplier & Vendors Requested ML20214R1361987-03-26026 March 1987 Forwards Conformance to Item 2.1 (Part 2) of Generic Ltr 83-28,Reactor Trip Sys Vendor Interface:Maine Yankee, St Lucie 1 &-2 & Waterford 3, Final Rept.Plants Conform to Generic Ltr ML17219A5631987-02-10010 February 1987 Forwards EGG-NTA-7477, Review of Tech Spec Changes Supporting NUREG-0737 Accident Instrumentation,St Lucie Plant Units 1 & 2, Informal Technical Evaluation Rept,For Review.Work Authorized by Task 5-4 Complete ML20211P2051986-11-24024 November 1986 FOIA Request for La Crosse & Big Rock Point Semiannual Effluent Repts & Turkey Point & St Lucie SALP Repts ML20214R8831986-11-0505 November 1986 FOIA Request for Encls to 860821 SALP Repts ML20210T4441986-03-27027 March 1986 FOIA Request for Initial (Cycle 1) Startup Test Repts & Suppls for Seven Plants & Original Monthly Operating Rept for June 1983 for Virgil C Summer Plant ML20132F5751985-08-13013 August 1985 FOIA Request for Power Plant Exam Results Summary Sheets for Listed Plants ML20126E1901984-12-28028 December 1984 FOIA Request for Info Re Initial Operator Written Exam Results on Number of post-TMI-2 Plants.Info Provided in Did Pertain to Initial Exam Results.Table Listing Dates of Initial Licensing Encl ML20108F4541984-12-19019 December 1984 Forwards Request for Info on Task Action Plan A-45 DHR, Including Plant Drawings Circled on Encl List & Copy of Emergency Operating Procedures for Hurricane,Tornado & External Flooding ML20107K6231984-11-0101 November 1984 FOIA Request for Four Categories of Documents Re Results of Written Operator Exams at Listed Facilities,Including Dates of Exams & Number of Candidates Taking Exams ML20125A8761984-10-25025 October 1984 FOIA Request for 1983 Annual Rept for Safety Relief Valve Challenges of Listed Plants & Annual Plant Mod,Tests & Experiments Rept for 1983 Per 10CFR50.59 ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML17214A3951983-07-13013 July 1983 Requests That Qualification Rept QR52600-515 Be Withheld from Public Disclosure (Ref 10CFR2.790),as Rept Is Proprietary ML17214A3911983-07-13013 July 1983 Requests That Info Provided in Qualification Rept QR52600-515 Re EA 180 Series Limit Switches Be Withheld (Ref 10CFR2.790) ML17213A9191982-12-22022 December 1982 Forwards Minutes of Engineering Verification Program Review Committee 821215 Final Meeting in Bethesda,Md.Task Force Disbanded as of 821217 ML17213A9171982-12-22022 December 1982 Forwards Minutes of 821209 Meeting W/Util & C-E Task Force Managers in New York,Ny Re Engineering Verification Program. Results of Onsite Verification Phases of Program Discussed ML17213A9161982-12-21021 December 1982 Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 821213-17 ML17213A9041982-12-0909 December 1982 Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Status Summary for 2-wk Period, 821122-1204 ML17213A7571982-11-23023 November 1982 Notifies of Engineering Verification Program Review Committee 821202 Meeting on Hutchinson Island,Fl to Followup 821117-19 Meetings Re Open Items from Design Review Phase. Site Verification Scheduled for 821129-30 ML17213A7591982-11-22022 November 1982 Forwards Joint Ebasco & C-E Engineering Task Force Engineering Verification Program Weekly Status Summary for 821115-19 ML17213A7411982-11-15015 November 1982 Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 821108-13 ML17213A7051982-11-11011 November 1982 Forwards Minutes of Fl Power & Light Co,Ebasco & C-E Task Force Managers 821103 Meeting in Windsor,Ct Re Engineering Verificaton Program ML17213A6871982-11-0505 November 1982 Forwards Joint Ebasco & C-E Engineering Verification Program Weekly Status Summary for 821101-06 ML17213A6371982-10-29029 October 1982 Submits Joint Ebasco & C-E Engineering Verification Program Weekly Status Summary for Wk of 821025-30 ML17213A6061982-10-28028 October 1982 Forwards Minutes of Engineering Verification Program Task Force Managers 821021 Meeting W/Util & C-E in New York,Ny ML17213A5821982-10-20020 October 1982 Forwards Minutes of 821006-07 Meeting W/Util,Ebasco & C-E Task Force Managers Re Engineering Verification Program ML17213A5831982-10-15015 October 1982 Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 821011-15 ML17213A5581982-10-0808 October 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Verification Program for 821004-08 ML17213A5291982-09-29029 September 1982 Forwards Minutes of 820923 Meeting W/Util & C-E Task Force Managers in Windsor,Ct Re Engineering Verification Program ML17213A4851982-09-24024 September 1982 Forwards Minutes of Engineering Verification Review Committee 820916 Meeting at Plant Site ML17213A5271982-09-24024 September 1982 Forwards Joint Ebasco & C-E Task Force Program Weekly Status Summary for 820920-25 ML17213A4751982-09-20020 September 1982 Forwards Joint Ebasco & C-E Task Force Engineering Verification Program Weekly Status Summary for 820913-18 ML17213A4741982-09-17017 September 1982 Forwards Minutes of 820908 Meeting w/util,C-E,FPL & Ebasco Engineering Verification Program Task Force Managers in New York City,Ny ML17213A4431982-09-10010 September 1982 Forwards Weekly Status Summary Rept of Joint Ebasco & C-E Engineering Task Force for 820906-11 ML17213A4051982-09-0303 September 1982 Forwards Joint Ebasco & C-E Task Force Weekly Status Summary for 820830-0903 ML17213A4011982-08-31031 August 1982 Submits Interim Rept Re Engineering Verification Program, in Response to 820817 Request.Program Independence Preserved.Ebasco & C-E Task Force Members Screened to Insure No Prior Involvement in Verification Matters ML17213A4021982-08-31031 August 1982 Forwards Minutes of 820826 Meeting W/Util & C-E in Juno Beach,Fl Re Engineering Verification Program.Next Meeting Tentatively Scheduled for 820908 ML17213A3761982-08-27027 August 1982 Forwards Joint Ebasco Svcs Inc & C-E Task Force Engineering Verification Program Weekly Status Summary for 820823-27 ML17213A3651982-08-20020 August 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force Engineering Verification Program for 820816-20 ML17213A3511982-08-16016 August 1982 Forwards Minutes of Engineering Verification Program 820812 Meeting in Windsor,Ct ML17213A3411982-08-13013 August 1982 Forwards Revision 1 to Procedure EVP-001/SL-2, Engineering Verification Program, Dtd 820730 ML17213A3481982-08-13013 August 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820809-13.Remaining Design Input Received.Revision 1 to Program Procedure EVP-001/SL-2 Issued ML17213A3261982-08-0606 August 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820802-06 ML17212B7731982-07-30030 July 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Task Force for 820726-30 ML17212B7741982-07-28028 July 1982 Forwards Weekly Status Summary of Joint Ebasco & C-E Engineering Verification Task Force for 820719-23 ML17212B6221982-05-24024 May 1982 Forwards 820507,18 & 21 Ltrs Re Environ Qualification Status,Tone Maps & Status Checklist Repts 1989-06-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
REGULATO INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR! 81 050402 l7 DOC ~ DATE! 81/04/29 blOTAR IZED NO DOCKET FACIL'f50-389 St. Lucie Planti Unit 2i Florida Power 8 Ligh t Coo 05000389 AUTH ~ NAME AUTHOR AFFILIATION TSAKIRISiL. Ebasco Ser vices< Inc ~ (subs, of Enser ch C orp,)
RECIP ~ NAME'ECIPIENT AFFILIATION NERSESiVs NRC No Detailegl Affiliation Given
SUBJECT:
- Forwards index of figuresidiagramsiconduit" cable. lists L
'ketchesgper util requests DISTRISUTION CODE: SOS IS COPIES RECEIVED:LTR +ENCL TITlE: PSAR/FSAR AMDTS and,Related Correspondence NOTES!
RECIPIENT COPIES RECIPIENT COPIES ID CODE/blAME LTTR ENCL ID CODE/NAME LTTR ENCL' ACTION: A/D LXCENSNG 1 0 LIC BR P3 BC LIC BR P3 LA 1 0 NERSESEV ~ 04, 1 1 BR'7 INTERNAL: ACCID EVAL BR26" CHEM ENG- BR CORE PERF BR 08 10.
1 1
1 1
1 AUX SYS CONT SYS BR EFF TR SYS 09 1,1 1
1 1
1.
BR12'QUIP EMERG PREP 1 0 QUAL BR13 3 3 IENCES 4 HUM FACT ENG BR
?2'EOSC 1 1 1 1 HYD/GEO BR 15 2 2 ILC SYS'R 1 1.
f 16'IC IS,E 06 3 GUID BR 1 LIC QUAL BR ~
1 1 MATL ENG BR 17 1 1 ~
MECH ENG BR 18 1 1 MPA 1 0 NRC PDR 02" 1 1 OFLD 1 0 OP LIC BR 1 1 POWER SYS BR 19 1 PROC/TST REV 20 1 1 QA BR 21 f BR22 1 1 REAC SYS BR 23 1 1 G F ILE 01 1 1 SIT'NAL'R 24 1 1 NG BR25 1 1 EXTERNAL: ACRS 27 16 16 LPDR 03 1 1 NSIC 05 1 1 pe 0 5 198'l TOTAL NUMBER OF COPIES REQUIRED! LTTR 56 ENCL 50
. O.
4 I.
fi Aj 4
I
~ ~
t, f 4
41 Hr,
'l k ~ I
~
j4 If I 'I,'I p1 4
'I '401 ID
\
iH HI DI
'l II 2
tT ij lt Df l fl Cl k I' I
I c Y 1
fif W
ff Dl f" II ID
'l H
4 II 4
4 I
EBASCO SERVICES INCORPORATED Og'~O Two World Trade Center, New York, N.Y. 10048 April 29, 1981 SL-2-81-345 Mr Victor Nerses p / r United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20014
Dear Mr Nerses:
Re: ,FL'ORIDA .POWER' LIGHT COMPANY ST LUCIE UNIT 2 DOCKET 50-389 TRANSMITTAL OF FIGURES Per the request of Mr John E Sheetz (FPL), we are supplying you with the figures listed in the .attachment.
If you should have any questions on John Sheetz at (305) 552-3458.
this package, please contact Very truly yours, L Tsakiris Project Manager LT:RW:dr Attachment cc: W H Rogers, Jr W B Derrickson C S Kent E W Dotson B J Escue (2)
C M Wethy M S Altman K N Harris G E Crowell G Boissy N T Weems L Tsakiris R C Lehrer H F Taylor K N Flanagan E 2 Zuctunan (w/att) IgP~
G Krauss C B Mobus
>>o504OAIV
~,
~ ~
~ ~
April 29, 1981 ATTACHMENT INDEX OF FIGURES g DIAGRAMSf CONDUIT CABLE LISTS AND SKETCHES SUPPLIED IN THIS TRANSMITTAL J
0 v~
~ ~
II
SCHEMATIC DIAGRAMS DRAWING NO. SH.// REV DATE TITLE B 326 103S R1 12/5/80 OIL LIFT PUMPS FOR REACTOR COOLANT PUMP P-2A1 (2Bl, 2A2 2B2-TYP.)
139 S R2 (0) 4/27/81 PRESSURIZER LEVEL CH-L-1110 159 RO 8/28/80 VALVES V-2505, V2510, V2511
& V-2524 163S R2(0) 4/27/81 VALVES FCV-2210X, FCV-2210Y
& V-2512 1748 R1 12/5/80 BORIC ACID MAKE-UP PUMP 2A 175S R1 12/5/80 BORIC ACID MAKE-UP PUMP 2B 1778 R1 12/5/80 CHARGING PUMP 2A 1788 R1 12/5/80 CHARGING PUMP 2B
'179S Rl 12/5/80 CHARGING PUMP 2C 18 7S Rl 12/5/80 CHARGING PUMPS SEAL LUBRI-CATIOiN SYSTEM VALVES V 262 7i V-2628, V-2629 201S Rl 12/5/80 COMPONENT COOLIiNG WATER PUMP 2A 203S Rl 12/5/80 COMPONENT COOLIiNG 'WATER SUCTION HDR VALVE MV-14-3 (MV-14-1, 14-2 & 14-4-TYP.)
205S Rl 12/5/80 COMPONENT COOLING WATER PUMP 2B 209S Rl 12/5/80 COMPONENT COOLING WATER PUMP 2C 23 7S Rl 12/5/80 HP SAFETY INJECTION PIPiiP 2A 238S Rl 12/5/80 HP SAFETY INJECTIOiN PUMP 28 249S Rl 12/5/80 SHUTDOWN COOLING ISOLATION VALVE V-3480 (V-3481, V-3651, V-3652-TYP.)
251S Rl 12/11/80 LP SAFETY INJECTION PUMP 2A 252S Rl 12/ll/80 LP SAFETY INJECTION PUMP 23
~
g
SCHEMATIC DIAGRAifS (Coat'd)
DRAWING NO. SH// REV DATE TITLE B 326 25 7S Rl 12/5/80 LP SAFETY INJECTION FLOW CONT VALVES (HCV-3615, 3626, 3637, 3625, 3616, 361 7, 3635, 3636, 363 7~ 3645 ~ 3646 ~ 364 7 TYP )
269S Rl ,12/11/80 SAFETY INJECTION TANK 2A1 TSOL VALVE V-3624 (3614, 3634, 3644-TYP.)
285S Rl 12/11/80 CONTAINiENT FAN COOLER 2-HVS-1A (-1B,-lC,-1D-TYP.)
28 7S R1 12/5/80 CONTAINiKNT SPRAY PUMP 2A 289S Rl 12/5/80 SPRAY VALVES I'ONTAIAKNT FCV-07-lA 6 FCV-07-1B 290S Rl 12/5/80 CONTAINMENT SPRAY PUMP 2B 29 75 RO 11/15/78 REFUELING WATER TANK VALVE MV-07-1A (07-1B-TYP.)
299S Rl 12/5/80 REACTOR SUMP VALVE MV-07-2A (07-2B-TYP) 311S Rl 12/5/80 MAIN STEAM ISOLATION BYPASS VALVE MV-08-lA (08-l13-TYP) 312S R2(0) 4/24/81 MAIN STEAM ISOL VALVE HCV-08-1A OPENING, CLOSING 6 SOL TEST 315 S R1 12/11/80 MAIN STEAM ISOL VALVE HCV-08-iB OPENING, CLOSING 6 SOL TEST 411 S Rl 12/5/80 REACTOR TRIP BKR. TCB-1 482 S RO 8/28/80 REACTOR CONTAINMENT & SHLD BLDG DIFF PRESS 490S R1 12/5/80 CONTROL ROOM EMERG FILTRATION FAN 2HVE-13A (13B-TYP) 492S Rl 12/11/80 CONTROL ROOM AIR COND UNIT 2-HVA/ACC-3A(-3B,-3C TYP)
SH 1
SCHEMATIC DZAGP "iMS (Gyring'd)
DRAWING 'NO. SH. 8 REV DATE TITLE 493 S R1 12/11/80 CONTROL ROOM AIR COND UNIT 2-HVA/ACC-3A(-3B,-3C TYP)
SH 2 503S Rl 12/11/80 ~
REACTOR AUX BLDG EMERG EXHAUST FAN 2HVE-9A (9B-TYP) 505S Rl 11/12/80 REACTOR AUX BLDG SUPPLY FAN 2HVS-4A (4B-TYP) 507S RO 6/30/80 CEDM COOLING FAN 2HVE-2lA 508S RO 6/30/80 CEDM COOLING FAN 2HVE-2lB 509 S R'L 12/5/80 REACTOR CONTAINMENT PURGE EXHAUST FAN 2HVE-8A 510S Rl 12/5/80 REACTOR CONTAINMENT PURGE EXHAUST FAN 2HVE-88 I
511S . R2 (0) 4/24/81 REACTOR CONTAIRKNT PURGE ISOLATION VALVES - SH ~ 1 512S R2(O) 4/24/81 REACTOR CONTAINMENT PURGE ISOLATION VALVES SH. 2
- 513S Rl 12/11/80 SHIELD BLDG VENT EXHAUST FAN 2HVE-6A 516S Rl 12/ll/80 SHIELD BLDG VENT EXHAUST FAN 2HVE-6B 629S Rl 12/ll/80 AUX FEEDWATER PUMP 2A 631)S Rl 12/5/80 AUX FEEDWATER PUMP 2B 631S R2(0) 4/24/81 AUX FEEDWATER PUMP 2C TURBINE AID STM VLV iMV-08-3 711 Rl 12/5/80 EMERG TURBINE TRIP 6 TURBINE ALAR)$
SCHEMATIC DIAGRAMS (Cont d)
DRAWING NO. SH8 REV DATE TITLE B 326 832S Rl 12/11/80 INTAKE COOLING WATER PUMP 2A 833S Rl 12/11/80 INTAKE COOLING,WATER PUMP 2B 834S Rl 12/ll/80 ZiNTAKE COOLING WATER PUMP 2C 835S Rl 12/5/80 INTAKE COOLING WATER NON-EHERG HDR A ISOL VALVE MV-21-3 (MV-21-2-TYP) 934S Rl 12/11/80 4160V SWGR 2A2 FDR TO BUS 2A3 (2B2 FDR TO BUS 2B3"TYP) 9368 Rl 12/11/80 4160V SWGR 2A3 INCOMING FEEDER FROM BUS 2A2 (2B3 FDR FROM BUS 2B2-TYP) 938 S Rl 12/11/80 4160V SWGR 2A3 FDR TO BUS 2AB (2B3 FDR TO BUS 2AB-TYP) 940S Rl 12/11/80 4160V SWGR 2AB INCOMING FEEDER FROM BUS 2A3 (2AB FDR FROM BUS 2B3-TYP) 949 S R1 .1 2/11/80 4160V SWGR 2A3 LOAD SHEDDING RELAYS 950S Rl 12/5/80 4160V SWGR 2B3 LOAD SHEDDING RELAYS 951S RO 6/30/80 4160V SWGR 2AB LOAD SHEDDING RELAYS 953S Rl 12/5/80 DIESEL GENERATOR 2A BREAKER 956S R1 12/11/80 DIESEL GENERATOR 2A LOCKOUT RELAY 957S R1 12/11/80 DIESEL GENERATOR 2A START CKTS SH 1 959S R1 12/5/80 DIESEL GENERATOR 2A START SOLENOIDS
~V V~
~ ~
~ o CjjEtlATTC DTAGEAEE (Cont 'd)
~
DRAWING NO. SH// REV DATE B 326 963S R1 12/5/80 DIESEL GENERATOR 2B BREAKER 966S R1 12/ 1 1/80 DIESEL GENERATOR 2B LOCKOUT RELAY 9678 R1 12/11/80 DIESEL GENERATOR 2B START CKTS SH 1 9698 Rl 12/5/80 DIESEL GENERATOR 2B START SOLENOIDS 10008 R1 12/5/80 125V DC BUS TRANSFER CONTROL 11708 R1 12/5/80 CONTROL ROOM NORTH OUTSIDE AIR INSUL VA FCV-25-M 1176S R1 12/5/80 SHIELD BLDG VENT COOL AIR VA FCV-25-11 (FCV-25-12,TYP) 1501S R1 , 12/5/80 SHUTDOWN COOLING ISOL, HEAT EXCH, WARM-UP 6 CONTROL VALVES (V-3545, 3664, 3665, 3456, 3457, 3517, 3658, 3536, 3539; HCV-365 7, 2512, 3306, 3301) 1601S R1 12/5/80 DIESEL t'ENERATOR 2A START CKTS SH 2 1602S R2(0) 4/24/81 DIESEL GENERATOR 2A START CKTS 'SH 3 1603S R1 . 12/5/80 DIESEL GENERATOR 2A START CKTS SH 4 1604S 1605S 1611S
'l R1 R1 12/5/80 12/5/80 12/5/80 DIESEL GENERATOR 2A START CKTS SH 5 DIESEL GENERATOR 2A START CKTS SH 6 DIESEL GENERATOR 2B START CKTS SH 2 1612S '2(0) 4/24/81 DIESEL GENERATOR 2B START CKTS SH 3 1613S Rj 12/5/80 DIESEL GENERATOR 2B START CKTS SH 4 1614S R1 12/5/80 DIESEL GENERATOR 2B START CKTS SH 5 1615S Rj 12/5/80 DIESEL GENERATOR 2B START CKTS SH 6
SCHEMATIC DRAWINGS (Cont ')
DRAWING NO. sad DATE TITLE G-227 6/23/80 Control & Block Diagram Steam Generator Feedvater
& Condensate System G-278 11/21/79 Control & Block Diagram Containment Spray &
Recirculation System
~ y rc ~r 1
0 I
IL
.=LOW DLKGiV fS, PIPING A (D INSTRU.ENTATION DIAGRAMS DRAWING NO SHEET NO. REV DATE TITLE E-13172-310-166 04 8/03/79 RADIOACTIVE WASTE CON-2B P&ID E-13172-310-167 05 '8/07/80 RADIOACTIVE WASTE CON-CENTRATOR P& ID E-13172-310-168 6 04 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 6 E-1317 2-310-109 1 03 8/07/80 REACTOR COOLANT SYS P&I DIAGRAM SH 1 E-13172>>319>>'L22 3 03 8/07/80 CHEMICAL & VOLUME CONTROL SYS P&I DIAGRAM SH 3 CONDUIT CABLE LISTING See book A-1 and A-7 of this attachment for the index of the cable and conduits supplied;.
LAYOUT SKETCH OF THE CONTROL ROOM SK-2998-G-076 01 4/23/81 Control Room
FLOW DIAG S. PIPING AND INSTRUMENTATION AGRAMS SAFETY RELATED DRAWING . NQ SHEET// 'EE 'DATE 'TITLE I E E
G 079801 1 R7 9/11/80 FLOW DIAG - MAIN, EXTRACTION
& AUXILIARY STEAM SYSTEMS G 079802 R7 9/11/80 FLOW DIAG - MAIN EXTRACTION &
AUXILIARY STEAM SYSTEMS G 080S01 R6 9/29/80 FLOW DIAG - FDWTR, CONDENSATE
& AIR EVACUATION SYSTEMS G 080S02 R6 9/29/80 FLOW DIAG - FDWTR, CONDENSATE
& AIR EVACUATION SYSTEMS G 081'S01 R6 10/1/80 FLOW DIAG - HEATER DRAIN &
VENT SYSTEMS G 081802 R6 10/1/80 FLOW DIAG - HEATER DRAIN &
VENT SYSTEMS G 082 R6 8/22/80 FLOW DIAG - CRLG & INTAKE COOLING WATER SYSTEMS G 083 R6 12/2/79 FLOW DIAG - COMPONENT COOLANT SYSTEM G 084 Rj 6/9/80 FLOW DIAG - FIRE, WATER.
DOMESTIC AND MAKEUP SYSTEMS G 085801 R8 6/26/80, FLOW DZAG - SERVICE AND INSTRUMENT AIR SYSTEMS G 085802 R6 ~
6/26/80 FLOW DIAGRAM - SERVICE AND INSTRUMENT AIR SYSTEMS G 086 R6 1/18/80 FLOW DIAG - MISCELLANEOUS SYSTEMS SH-1 G 087 R7 6/9/80 FLOW DIAG MISCELLANEOUS SYSTEMS SH-2 G 088 R6 6/9/80 FLOW DIAG - CONTAINMENT SPRAY
& REFUELING WATER SYSTEMS G 089 R6 6/26/80 FLOW DIAG TURBINE COOLZNG WATER SYSTEM G 090 R4 10/6/80 REACTOR COOLANG PRESSURE BOUNDARY DIAGRAM G 091 R4 6/12/80 FLOW DIAG MISC SYSTEMS G 092 R4 12/16/79 FLOW DIAG SAMPLING SYSTEMS G 862 R4 ll/6778 HVAC AIR FLOW DIAGRAM G 863 R3 5/20/80 HVAC - REFRIGERANT PIPING
OC 4>
~I
FLOW DIAGRAMS NG AND 1NSTRUMENTATION DIAGRAM ETY RELATED DRAWING,NO. SH8 RE V DATE TITLE r
E-13172-310-100 09 8/07/80 PIPING & INSTRUMENTATION DIAGRAM SYMBOLS E-13172-310-110 09 8/07/80 REACTOR COOLANT SYSTEM P&I DIAGRAM E-13172-310-111 09 8/07/80 REACTOR COOLANT PUMP P&I DIAGRAM E-13172-310-120 1 09 8/07/80 CHEMICAL & VOLUME CONTROL SYSTEM P&I DIAG SH 1 E-13172-310-121 2 09 8/07/80 CHEMICAL & VOLUME CONTROL SYSTEM P&I DIAG SH 2 E-13172-310-130 1 09 8/07/80 SAFETY INJECTION SYS P&I DIAGRAM SH 1 E-13172-310-131 2 09 8/07/80 SAFETY INJECTION SYS P&I DIAGiUW SH 2 E-1317 2-310-140 09 8/07/80 FUEL POOL SYS P&I DIAGRAM E-13172-310-150 09 8/07/80 SAMPLING SYSTEM P&I DIAGRAM E-13172-310-160 1 09 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 1 E-13172-310-161 2 09 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 2 E-13172-310-162 3 09 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 3 E-13172-310-163 4 09 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 4 E-13172-3.10-164 5 08 8/07/80 WASTE MANAGEMENT SYS P&I DIAGRAM SH 5 E-13172-310-105 07 8/07/80 AUXILIARY PUMPS P&I DIAGRAM E-13172-310>>165 05 8/07/80 BORIC ACID CONCENTRATOR 2A P&ID
~'9, ~