Responds to NRC Re Violations Noted in IE Insp Rept 50-389/79-20.Corrective Actions:Qualified Person Assigned to Maintain Daily Log When Environ Control Engineer Not on Site
ML17207A687
Person / Time
Site: Saint Lucie 
Issue date: 12/03/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17207A686 List:
References
NUDOCS 7912310072
Download: ML17207A687 (3)


Text

BOX 1117, JENSEN BEACH, FLA, 33457 pit,Q c

~

~ll: 0~

Mr. J.

P. O'Reilly, Director; 'Region II Office of Inspection

& Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Qd FLORIDA POWER & LIGHT COMPANY December 3,

1979

Dear Mr. O'Reilly:

Re:

RII:ALC 50-389/79-20 Florida Power 6 Light Company has reviewed the subject inspection report and our response is attached.

There is no proprietary information contained in the report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 6 Technology REU/MV/bc Attachment cc:

T. E. Burdette Harold F. Reis, Esquire

li'

RII:ALC 50-389/79-20 This NRC Inspection resulted in one finding as described below:

(as partial implementation of the environmental control program defined in Section 30(2) of the Construction Permit), the licensee is committed to maintain a daily log of site surveillance, findings and environmental protection activities to assure that all construction activities conform to the environmental conditions defined in the Construction Permit.

Contrary to the above, the licensee failed to maintain the daily log during the period October 15-17, 1979 and October 25, 1979.

I

Response

Florida Power and Light has evaluated this finding and submits the following response:

The daily log that is required to be maintained was not maintained on the referenced dates because the site environmental control engineer was not on site on those days.

For days that he is absent, the environmental engineer has been directed to assign a qualified person to maintain the daily log and perform the necessary site surveillance required by the site procedure.

Full compliance with this audit was achieved on November 5, 1979.