UgHRC RF"-" I~.-
(y+I J PTA C
P..O. BOX 013100, MIAMI, FL 3310'I xVI//
9(c~i
<9:~S FLORIDAPOWER & LIGHTCOMPANY September 25, 1979 L-79-275 Hr. James P.. O'Reilly, Director, Region II
.Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 hlarietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Hr. O'Reilly:
Re:
RII:JPO 50-335 IE Bulletin 79-14 The attached information is provided to update our submittal of September 20, 1979 (L-79-264).
In order to meet our current outage
- schedule, we need a
reply by September 26, 1979 to our request for deferral of the inspection of the remaining normally inaccessible hangers/restraints until the 1980 refueling outage.
Very truly yours,
+ Robert E. Ubrig, Vice President Advanced Systems and Technology REU/TCG:eag Attachment CC:
Director, Office of Inspection and Enforcement Director, Division of Operating Reactors Harold F. Reis, Esquire OII'FICEhLCOpy ps'Q 8 0 ~ ~9 PEOPLE... SERVING PFOPI.F
NRC BULLETIN 79-14 STATUS AS OF SEPTEMBER 25, 1979 ATTACHMENT More than 1433 hangers/restraints have been inspected of approximate'ly 2200 hangers/restraints within the scope of the program.
Of those, 55Q have been reviewed and approved by Stress Engineering, 78 are pending approval by Ebasco's'New York Office, and 2 have been reported to the NRC as requiring modification.
Of those hangers/restraints which have been inspected, fewer than 10 deviations have been identified which may result in physical modifi-cations.
A summary of these follows:
REPORTED TO NRC RESTRAINT SI-6?6-429 SI-868-'6099 CC-1865-6199.
CC-1868-2220 CS-220-19-1A CS-220-19-1 CS-220-19-2 CS-220 YHP-72A CSH-33 LINE lSMBER 4"-S I-416 6"-SI-464 8"-CC-40 8"-CC-41 3"-FS-554 3"-FS-555 3"-FS-513 3"-CH-938 12"-CS-11 Note:
SI=Safety Injection System CC=Component Cooling System FS=Fuel Pool System CH=Chemical 8 Volume Control System The following represents an estimate (as of 9/25/79) o'f inspection status following the current outage, assuming NRC agreement with FPL's deferral request.
STATUS AFTER CURRENT OUTAGE ESTIMATED 1.
Piping Configuration Inspection:
A.
Insulated - 100" completed B.'ninsulated - 98Ã completed
~
Note:
Containment Spray Lines will be about 50K inspected.
ll.
Restraint/Hanger Inspection A.
Insulated - 50K complete (Greater than'lOX required by Supplement 2
B.
Uninsulated - 100K complete To date no piping discrepancies have been iden ified.