Text
.~.
. ~L. *...:::;.
.Docket Nos *. 50-237 and 50-249 Mr. L. D. Butterfield, Jr.
Nuclear Licensing Manager Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Butterfield:
August 31, 1987 Distribution:
Docket Fi 1 e ;J NRC -& L-oca l PDRs PDIII-2 r/f GHolahan LLuther MGrotenhuis OGC-Beth.
EJordan J. Partlow ACRS (10)
PDIII-2 Plant File 3",:Jb,ce..
SUBJECT:
EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97, REVISION 2 (TAC NOS. 51085/6)
Re:
Dresden Nuclear Power Station, Unit Nos. 2 and 3 The enclosed interim report (EG&G-NTA-7762) was prepared by Idaho National Engineering Laboratory (INEL) under a technical assistance program for the review of licensee and applicant responses on conformance to R.G. 1.97.
We have reviewed References 1, 2, 3 and 4, which you have submitted in response to reference 5 and conclude that.CECo. has provided an explicit commitment on conformance to R.G. 1.97, with the exception of those items which CECo identified.
Further, it is concluded that the CEC0 1s justification for exceptions to R.G. 1.97 for some items is acceptable.
However, there are some items for
. which INEL could not conclude that adequate justification was provided and has identified those as unjustified exceptions.
It is requested that CECo provide, a response to the open items in the enclosed interim report within 60 days of the date of this letter.
CECo should also provide other comments if the enclosed report includes any incorrect assumptions-or reflects a commitment which is beyond the intent of the responses.
Enclosures:
- 1.
References
- 2. Technical Evaluation Report tc: See next page Daniel~. MulleT Marshall Grotenhuis, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, V and Special Projects
Mr. L. D. Butterfield, Jr.
Co111110nwealth Edison Company
' cc:
Mr. Michael I. Miller Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr. J. Ee~igenburg Plant Superintendent Dresden Nuclear Power Station Rural Route #1
- Morris, Illinois* 60450 U. S. Nuclear* Regulatory ColTITiission Resident Inspectors Office Dresden Station Rural Route #1 Morris, Illinois 60450 Chai nnan Board of Supervisors of
- Grundy County Grundy County Courthouse Morris, Illinois 60450 Regional Administrator Nuclear Regulatory Conrnission, Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Michael E. Parker, Chief Division of Engineering Illinois Department of Nuclear Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Dresden Nuclear Power Station Units 2 and 3
9'1cl osure 1.
References:
- 1) Letter, Commonwealth Edison Company (J. R. Wojnorowski) to NRC (D. B. Vassallo), "Compliance with Regulatory Guide 1.97,
11 August 1, 1985
- 2)
Letter, Co1TUT1onwealth Edison Company (J. R. Wojnorowski) to NRC (H. T<. Denton), "Implementation Schedule for Regulatory Guide 1.97 Modifications, 11 January 31, 1986
- 3)
Letter, ColT1Tlonwealth Edison Company (J. R. Wojnorowski) to NRC *
(H. R. Denton), "Revised Implementation Schedule for Regulatory Guide 1.97 Modifications, Dresden Station Unit 3, 11 July 1, 1986
- 4)
Letter, Commonwealth Edison Company (J. R. Wojnorowski) to NRC (H. R. Denton), "Emergency Response Facility Regulatory Guide 1.97 Review," November 4, 1985
- 5)
NRC Generic Letter No. 82-33 (Supplement No. 1 to NUREG-0737, Requirements for Emergency Response Capability), December 17, 1982