Forwards Safety Evaluation Re Util Response to Generic Ltr 82-33 Concerning Emergency Response Capability Conformance to Reg Guide 1.97,Rev 2.Response Acceptable Provided That Neutron Monitoring Instrumentation Concern Addressed
ML17201J418
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/01/1988
From: Muller D
Office of Nuclear Reactor Regulation
To: Bliss H
COMMONWEALTH EDISON CO.
Shared Package
ML17201J419 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 GL-82-33, TAC-51085, TAC-51086, NUDOCS 8809080225
Download: ML17201J418 (3)


Text

...

Docket 50-237 an~ 50-249 Mr. Henry E. Bliss Nuclear Licensing Manager Commonwealth Edison Company Post Office Box 767

  • B 1 i s s September 1, 1988 DISTRIBUTION

. (Docket fll e. -:

NRC'-&.'Loca 1 PD Rs PDIII-2 r/f GHolahan LLut~er BSiegel BG rimes PDII I-2 Pl an.t *fife DCrutchfield ACRS {10)

EJordan.

OGC-Rockvi lle

-BMareus

SUBJECT:

EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97 REVISION 2, DRESDEN UNIT NOS. 2 AND 3 (TAC NOS. 51085 AND 51086)

.*.)

The st.aff has completed its evaluation*of the Commonwealth Edison *Company (CE Co) responses to Generic Letter 82-33 which requested ~that CE Co provide a* -:

report describing how the post-accident monitoring instrumentation* at Dresden

. meets the guidelines of Regulato.ry Guide 1.97 as* applied to emergency response facilities.

The staff's Safety Evaluation, which includes.the EG&G Idaho Inc.

  • Technical Evaluation Report, is ~nclosed. The staff has determined that the
  • instrumentation provided by CECo for satisfying-the recommendations of Regulatory Guide 1.97, Revision 2 is acc~ptable except for.the neutron flux monitoring instrumentation which does not* have environmentally and seismically qualified cables, detectors~ and detector drives insid~ the primary
  • containment.* It is the staff's position that CECo should evaluate 'the. recently developed systems and install neutron monitoring instrumentotio~ which satisfies the*'Regulatory Guide 1.97 c.riteria *.
  • It is requested which within 60 days of receipt of, ~his letter,_ CECo provide a response -and schedule with regard *to the actions to be taken to colTiJYlj'wtth--the* *

~taff's p,osition on the neutron flux.monitoring instrumentation.

PDIII~~

PDiLfV2 BS~ege~

D~~~.

-.1f /:Jr:> /88

  • -_.-. ~41 I-.,/J~8.*. c. *o~c-

",,._.,.,. ~ :.. *-~.-. -

"~--'.' - "'",:_-_._. -*-

-'*._... ~ - _ _.._._.,

Jc

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos.: 50-237 and 50-249 Mr. Henry E. Bliss Nuclear Licensing Manager Corrmonwealth Edison Company

  • Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Bliss:

September 1, )988

SUBJECT:

EMERGENCY RESPONSE CAPABILITY - CONFORMANCE TO REGULATORY GUIDE 1.97 REVISION 2, DRESDEN UNIT NOS. 2 AND 3*

(TAC NOS. 51085 AND 51086)

The staff has completed its evaluation of the Conunonwealth Edison Company (CE Co) responses to Generic Letter 82.... 33 which requested that CE Co* provide a report describing how the post-accipent monltoring instrumentation at Dresden meets the guidelines of Regulatory~Guide 1.97 as applied to emergency response facilities. The staff's Safety Evaluation, which includes the EG&G Idaho Inc.

Technical Evaluation Report, is enclosed. *The staff has determined that the instrumentation provided by CECo for satisfying the reconvnendations of Regulatory Guide 1.97, Revision 2 is acceptable except for the neutron flux monitoring instrumentation which does not have environmentally and seismically qualified cables, detectors, and detector drives inside the primary containment. It is the staff's position that CECo should evaluate the recently developed systems and install neutron monitoring instrumentation which satis.fies the Regulatory Guide 1.97 criteria.

It is requested which within 60 days of receipt of this letter, CECo provide a response and schedule with regard to the actions to be taken to comply with the staff's position on* the neutron flux monitorihg instrumentation.

"The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not-required under P.L.96-511."

Q J /.m

Enclosure:

As stated Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects III, IV, V and Special Projects

=:;..

Mr. Henry £. Bliss COlllnOnwealth Edison Company cc:

Michael I. Miller, Esq.

Sidley and Austin One First National Plaza Chicago, Illinois 60603 Mr. J. Eenigenburg Plant Superintendent Dresden Nuclear Power Station Rural Route 11 Morris, Illinois 60450 U. S. Nuclear Regulatory C011111ission Resident Inspectors Office Drtsden Station Rura 1 Route 11 Morrfs, Illinois 60450 Chainnan Board of Suparvisors of Grundy County Grundy County Courthouse.

Morris, Illinois* 60450.

. A.'

Regional Administrator Nuclear Regulatory Co11111issfon, Region I II 799 Roosevelt Road, Bldg. 14 Glen Ellyn, Illinois 60137 Mr. Michael E. Parker, Chfef Division of Engineering J111no1s Department of Nuclear Safety

  • 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 Dresden Nuclear Power Station Units 2 and 3

..