Grants Relief from ASME Code Requirements Re Inservice Insp, Based on Util 821210 Submittal.Exam Requirements Determined to Be Impractical to Perform During 820301-920301 Insp Interval
ML17195A177
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/26/1984
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML17195A178 List:
References
LSO5-84-04-059, LSO5-84-4-59, NUDOCS 8404300155
Download: ML17195A177 (2)


Text

,,/.

  • )

- April 26, 1984 Docket No.

50-237/249 LS05-84-04-059 Mr. Dennis L. Farrar Director of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690.

Dear Mr. Farrar:

SUBJECT:

REQUESTS FOR RELIEF FROM JNSERVICE INSPECTION REQUIREMENTS Re:

Dresden Nuclear Power Station, Unit Nos. 2 and 3 By letter dated December 10, 1982, Commonwealth Edison submitted its inservice inspection program revisions and additional information related to

.request for relief from certain Code requirements determined to be impractical to perform on the Dresden Station Unit Nos. 2 and 3 during the inspection interval March 1, 1982 to March 1, 1992.

The aforementioned material was reviewed by our contractor, Battelle, Pacific Northwest Laboratories which prepared the attached Technical Evaluation Report

{TER) evaluating the requests for relief. The staff examined the conclusions presented in the TER and prepared the enclosed Safety Evaluation which has -

granted relief from the examinaMon requirements which we.have determined to be impractical to perform and,* by granting relief, would not compromise the safety of the facilities. This concludes our evaluation of your December 10, 1982 submittal.

-Sinc;ere ly,

.' Original signed by_ James Lombardo J: for

  • ,. ~-.

\\\\'". ~

/J

--.~'

{'

~"

Dennis 'M! Crutchfield, Chief Openating Reactors Branch #5 Division-of Licensing

.;r;,,

Enclosu~ei:

-: DtSTRIBUTION

1. Safety 'Evaluation

-.[Do_c.k.e.. t... tJ

2.

Technical<<Evaluatfon Report.*

NRC PDR

-. '-,... '. ;,. \\....

Loca 1 PDR cc w/enclos'Ure * * *

-,-ORB"#~. Reading See ne~t:'pcige *;;,_,__., *.. "

NS IC

,Dcrutc-hf i e 1 d

    • MShuttl eworth
  • -~ RG_i 1 bert _

ACRS EJordan_

SEPB OELD JTaylor DO~s #5 liTL-- M~~ttleworth:jc

.\\( 1 /~84 g~~~~~~~ (

41~~i~

(

~°' /,f"')

  • ~*

~*

j)

.. '\\/

Mr. Dennis L. Farrar cc Isham, Lincoln & Beale Counselors at Law Three First Matinnal Plaza, Suite 5200 Chicago, Illinois 50602 Mr. Doug Scott Plant Superintendent Dresden Nuclear Power Station Rural Route #1 Morris, Illinois 60450 U. S. Nuclear Regulatory Commfs*sion Resident Inspectors Offic~

Dresden Station Rura 1 Route #1 Morris, Illinois 60450 Chairman Board of Supervisors of Grundy County Grundy County Courthouse

Regional Radiation Representative 230 South Dearborn Street Chicago, Illinois 60604 James G. Keppler, Regional Admini.strator Nuclear Regulatory Commission, Region III 799 Roosevelt Street Glen Ellyn, Illinois 60137