ML17194A300
| ML17194A300 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 11/24/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML17194A301 | List: |
| References | |
| NUDOCS 8112080249 | |
| Download: ML17194A300 (2) | |
See also: IR 05000010/1981014
Text
-, ""'. ~
- .. V-- -
Docket No. 50-10
Docket No.IJ0-23~
Docket No. 50-249
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
NOV 2 4 1981*
!E HQ FILE co~
This refers to the routine safety inspection conducted by Messrs. T. M. Tongue
and M. J. Jordan of this office on September 5, through October 2, 1981, of
activities at Dresden Nuclear Power Station, Units 1, 2 and 3, authorized by
- NRC Operating Licenses No. DPR-02, No. DPR-19 and No. DPR-25 and to the dis-
cussion of our findings with Messrs. R. Ragan, D. Farrar, J. Eenigenburg and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, obser~ations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A.
A written response, submitted under oath or affirmation, is required.
During the inspection, a discrepancy in the tag-out system was identified
by your personnel on the nonsafety related-Unit 3 feed system (see para-
graph 2.d. of the inspection report).
During calendar year 1981, two
items of noncompliance have been identified by our inspectors for similar
occurrences.
This is a matter of safety concern since it indicates in-
sufficient management oversight has been devoted to the control of out-
ages (tag-outs) and could lead to more serious events.
Please advise us
in writing within 30 days of the date of this letter of the corrective
action you have taken or plan to take to improve management control of
the outage tag-out system.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
8112080249 811127
PDR ADOCK 05000010
Q
IEol
'*-'
,,
~-
\\~
Commonwealth Edison Company
- 2 -
November 24, 1981
in the NRC's Public Document Room.
If the letter or enclosures contain any
information that you or your contractors believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by
telephone within seven (7) days from the date of this letter of your intention
. to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
Section 2.790(b)(l) requires that any such appli-
cation must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This
section further requires the statement to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4).
The information sought to be
withheld shall be incorporated as far as possible into ~ separate part of
the affidavit.
If we do not hear from you in this regard within the speci-
fied periods noted above, a copy of this letter, the enclosures, and your
response to this letter will be placed in the Public Document Room.
We will gladly discuss any questions y~~;fiave concerning this inspection.
Enclosures:
1.
Appendix A, Notice
- of Violation
2.
Inspection Reports
No. 50-010/81-14, No.
50-237/81-28 and No.
50-249/81-21
cc w/encls:
Louis 0. DelGeorge
Director of Nuclear
Licensing
D. J. Scott,
Station Superintendent
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII*
,
_/,' .. /
.. :.///*,
R.e'imann/ jp
10/27/81
Sincerely,
"OrigTnal sJg~d by R.l.. Spessard"
R. L. Spessard, Director
Division of Resident and
Project Inspection