Forwards IE Insp Repts 50-010/81-12,50-237/81-24 & 50-249/81-18 on 810801-0904 & Notice of Violation
ML17194A239
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/15/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML17194A240 List:
References
NUDOCS 8110290429
Download: ML17194A239 (2)


See also: IR 05000010/1981012

Text

4.- r .. :... ..

Docket No. 50-10

Docket No.<:::i[-2ti

Docket No. 50-2

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL

60690

Gentlemen:

OCT 1 i 1987

.. **

,** ..

This refers to the routine safety inspection conducted by Messrs. T. M. Tongue

and M. J. Jordan of this office on August 1 through September 4, 1981, of

activities at Dresden Nuclear Power Station, Units 1, 2, and 3, authorized by

NRC Operating Licenses No. DPR-02, No. DPR-19, and No. DPR-25 and to the dis-

cussion of our findings with Messrs. Ragan, Farrar, Eenigenburg and others of

your staff at the conclusion of the inspection.

The enclosed copy o~ our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in enclosed Appendix A.

A

written response, submitted under oath or affirmation, is required.

In accordance with 10 CFR 2.790 of the .Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If the enclosures contain any information

that you or your contractors believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone

within seven (7) days from the date. of this letter of your intention to file a

request for withholding; and (b) submit within twenty-five (25) days from the

date of this letter a written application to this office to withhold such

information.

Section 2.790(b)(l) requires that any such application must be

accompani*ed by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains a

full statement of the reasons which are the bases for the claim that the

8110290429 811015

PDR ADOCK osoooo10

G

PDR

..

Commonwealth Edison Company

- 2 -

OCT 1 s 1981

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit. If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter, the enclosures, and your response to this letter will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-10/81-12,

No. 50-237/81-24, and

No. 50-249/81-18

cc w/encls:

Louis 0. DelGeorge

Director of Nuclear

Licensing

D. J. Scott,

Station Superintendent

DMB/Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Sincerely,

/~~ J

.

\\_ .:f\\ ;;< . ./J<-'vYf~~ R. L. Spes4ard, Director Division of Resident and Project Inspection RJi' -~~

  1. .t.: J;
irtt'

~ Rw

  • ~

~ r klJ) on ue/so Spes~a/d ~~rr.ll'--k .. ' l;\\c *YI WI\\ 10/14/81 /0 -1>"-~/ n;\\\\~

o;/J

I, }}