Docket Nc<:50-23f
Do_cket No. 50-249
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL
60690
AUG 2 4 1981
This refers to the special safety inspection conducted by Mr. I. T. Yin of
this office on July 6-7, 1981, at Nuclear Technology, Inc., San Jose,
California, and on Jrily 8-9, 1981, at EDS Nuclear Inc., San Francisco,
California, of activities at Dresden Station, Units 2 and 3, authorized by
NRC Operating Licenses No. DPR-19 and No. DPR-25, and of activities at the
Quad-Cities Station, Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-29 and No. D:i?R-30 and to the discussion of our findings with
Mr. M. Strait of your staff prior to the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and :representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in nori~
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath or affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the en~losures, and your response to this letter will be
placed in the NRC's Public Document Room.
If the enclosures contain any
information that you or your contractors believe to be exempt .from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this
office by telephone within seven (7) days from the date of this letter of
your intention to file a request for withholding; and (b) submit within
- n
._;, .
Commonwealth Edison Company
- 2 .,.
AUG 2 4 1981
twenty-five (25) days from the date of this letter a written applitation
to this office to withhold such information.
Section 2.790(b)(l) requires
that any such application must be accompanied by an affidavit executed by
the owner of the information which identifies the document or part sought
to be withheld, and which contains a full statement of the reasons which
are the bases for the claim that the information should be withheld from
public disclosure.
This section further requires the statement to address
with specificity the considerations listed in 10 CFR 2.790(b)(4).
The
information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit. If we do not hear from you in this
regard within the specified periods rioted above, a copy of this letter,
the enclosures, and your response to this letter will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Enclosures:
1.
Appendix A, Notice
of Violation
2.
tE Inspection.Report
No. 50-237/81-21; No.
50-249/81-15; No.
50~254/81-16 and No.
50-265/81-16
Sincerely,
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
( * cc w/~ncls:
Louis 0. DelGeorge
Director of Nuclear
Licensing
D. J. Scott
Station Superintendent
N. Kalivianakis,
Plant Superintendent
DMB/Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorriey General
Yin/jp
8/20/81
RIII
D~n
&;~Jn
RIII
~s