Letter Sequence Other |
|---|
CAC:MF9930, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARML17188A2652016-12-31031 December 2016 Enclosure 10 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1123NP, Bounding Uncertainty Analysis for Thermal Power Determination at Hope Creek, Unit 1 Nuclear Generating Station Using the LEFM System, Revision 2 (Non-Proprietary Versi Project stage: Other ML17188A2672017-03-31031 March 2017 Enclosure 12 to LR-N17-0044 and LAR H17-03 - Cameron Document ER-1132NP, Meter Factor Calculation and Accuracy Assessment for Hope Creek Nuclear Generating Station, Revision 2, (Non-Proprietary Version) Project stage: Other ML17188A2602017-07-0707 July 2017 License Amendment Request for Measurement Uncertainty Recapture (MUR) Power Uprate Project stage: Request LR-N17-0044, Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings2017-07-0707 July 2017 Enclosure 15 to LR-N17-0044 and LAR H17-03 - LEFM Flow Meter Installation Location Drawings Project stage: Other 05000354/LER-1917-001, Regarding Secondary Containment Door Not Latched in Closed Position2017-07-0707 July 2017 Regarding Secondary Containment Door Not Latched in Closed Position Project stage: Request ML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review ML17235B1202017-08-28028 August 2017 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station Project stage: Withholding Request Acceptance LR-N17-0141, Transmittal of 2017 Annual 10 CFR 50.46 Report2017-09-27027 September 2017 Transmittal of 2017 Annual 10 CFR 50.46 Report Project stage: Request ML17290B0132017-10-17017 October 2017 NRR E-mail Capture - Hope Creek MUR Request for Additional Information for Apla and Snpb Project stage: RAI LR-N17-0161, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-0101 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML17324A0522017-11-0909 November 2017 NRR E-mail Capture - Draft Request for Additional Information - Hope Creek MUR Chemical, Corrosion, and Steam Generator Project stage: Draft RAI ML17324A2602017-11-17017 November 2017 NRR E-mail Capture - Final Request for Additional Information - Hope Creek MUR Electrical Instrumentation and Controls Project stage: RAI LR-N17-0170, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-11-27027 November 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0176, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate2017-12-14014 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Uprate Project stage: Response to RAI LR-N17-0186, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0181, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0187, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0175, Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-19019 December 2017 Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI LR-N17-0189, Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2017-12-22022 December 2017 Transmittal of Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HCH-2017-049, Discharge Monitoring Report for November 20172017-12-22022 December 2017 Discharge Monitoring Report for November 2017 Project stage: Request ML18011A0352018-01-11011 January 2018 Request for Withholding Information from Public Disclosure for Hope Creek Generating Station (CAC No. MF9930; EPID L-2017-LLA-0426) Project stage: Withholding Request Acceptance LR-N18-0009, Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate2018-01-22022 January 2018 Supplemental Information for the Response to Request for Additional Information Regarding License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Supplement ML18096A5422018-04-24024 April 2018 Issuance of Amendment Measurement Uncertainty Recapture Power Uprate (CAC MF9930; EPID L-2017-LLS-0002) Project stage: Approval 2017-12-22
[Table View] |
Text
{{#Wiki_filter:LR-N17-0044 LAR H17-03 5
LEFM Flow Meter Installation Location Drawings
TAB!,E I* RISEI CWIP WCS (4)
.... -I,.J LUO 1'00'01'.:..-
OIIIPrTATIOOIOf
--3/4
-IINO.
EU:Y.. TICIII
-ClNTtiiiL...
1.5* MAX
.SPAINCIM.... GU ANCHOI'I I--{ R.ESTAAINT-Ifl *""'"
rHon..... oiD!NnmoTH***v*"'""""""
"'""'""-"'4TI2co*ro*3'"""..,."'"'1""'"
fOIII...,.sr*oac.o*cu"'Tl""
C!- 1q01 RPE***,1/2r C*l9tl Q. ¹"£:º>>25 C
¶WE-I.:
C
i'"E-'1/47;
- r. irr
"" -;;&:'"V]'.Jo.:%.....
µn CLOSJRE PIECES ADDITIONAL 4" END.
)n$ffJ"AL 4*
ENDS.
- k. # u..... lo-n_., e-K....-"- ;o<:.&;¸.:.....<.-*c.-r*J..!
l':cu.Je:"'"-*"-">
AS-BUILT I
o-
<(
fTl I
0
r-------------------------------------------------------------------------------------------------------------------------------------------------------------
1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
6 El.
s'-8" EL. 154'-6#
dl (;I
1 1
-v.ur 162'-6" (
-*---1
\\
S'-23,"
CREF.)
11 '-6" l
J 31 '-2"
t...'"?:
e
;:
013-DBD-18" 13'-6" I
013-DB0-30"
/ j, LEFM
/
1--
7'-0" 9'-103-'/
CREF. l 20'-8" I
I L
1 013-DBD-18"
\\_
" _I I I
1--
1--
1-P-AE-013-H25 3'-B" I
I I ELEVATION LOOKING WEST 30x16 RED.
TEE I 6 16'-11 u 1 '-10" 32'-8" J
30"X18"
- OEQ, C*
2'-0u 2'-3" I
80116312RO SUP02RO LEFM I
I rt EL.
I' Pipe 00 18 20 22 5ch.
120 120 120 120 158'-7 1/2" WaiiThk.
1.375 1.5 1.625 L812 1.323 I E-*
LOCATION Pi e iD 15.25 17 18.75 20.376 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
----------------------------------------------}}