OCT 2 '7 1992 MEMORANDUM FOR:
John A. Zwolinski, Assistant Director
- for Region Ill Reactors Division of Reactor Projects - 111/IV/V Office of Nuclear Reactor Regulation FROM:
Hubert *J. Miller, Director
- Division of Reactor Safety, Region III
SUBJECT:
REQUEST FOR TECHNICAL ASSISTANCE INTERPRETATION AND RESOLUTION OF REGULATORY GUIDE (RG) 1.97 INSPECTION FINDINGS (AITS # 92-0635 THROUGH 92-0641)
This memorandum transmits seven requests for NRR technical assistance, which are necessary to determine if the items identified in the attached enclosures comply with the appropriate revisi6ns to RG *1.97.
The table, Attachment' l, i~
a summary of the known remainfog items that require further review to complete our inspection of RG 1.97.
The ~nclosures and associated attathme~ts*provide specific information *about the conditions o~ licensee position ~nco~ntered during our inspections.
Based upon the gene~ic nature of the items, we have concluded that these items should be reviewed and resplved by NRR.
Alr of -the.*.--
items were discussed with NRR/SICB during the time of and subsequent to our inspections.. The items needing review fall into five areas:
- 1.
Review and acceptance of isolator type (e.g., use of resistors-as isolators, maximum credible fault isolator test report data),
- 2..
Review and.acceptance of alternate methods (not within the RG requirement) used for the unique identification of control room instrumentation,
- 3.
Resolution of the BWR neutr.on* flux monitoring issue,
. 4.
Redundancy of instrumentation, and
- 5.
Reclassification of a Category 1, Type A variable.*
We request that NRR review and determine the acceptability of licensee positions on the enclosed RG 1.97 compliance issues.
Please note that a number of these issues were identified in inspections many months ago, but we do not view them to be of immediate safety concern; therefore, at NRR request, they were held to the end of the inspection program in order to allow for consistent, generic treatment.
~
/fe,.pp,-~
7 b 921027 92110300 05000237 PDR ADOCK
- PDR p
-:-.*~--,..
-~~--
_*:*-~-:--_-: -=*--*-*
.. r; J. A. Zwolinski 2
OCT 2 7 1992.
Direct any questions concerning this subject to either George Hausman at (708) 790-5523 or Frank Jablonski at (708} 790-5555.
We corisider this to be a Priority 2 item with a completion date of January 16, 1993.
Attachment:
Region III RG 1.91 TIA Req~est
Enclosures:
- 1.
D~vis-Besse TIA Request
- 2.
Dresden TIA Request
- 3.
Fermi TIA Request
- 4.
LaSalle TIA Request
- 5.
Palisades TIA Request..
.
- 6. *. Point Beach. TIA Request *
- 7.
Quad Cities TIA Request See Attached Distribution Riii Riii Riii
~.
Hausman *
. ~ ;1.f<#
Jab~onski LH'asse 10/if, /92 10/-z_t,J92 10/'Zh /92
..., '~I '* * * *' ~...
.,_;; :.~
- I...:.~)
iJ i *.i ; ~* ~--...:.. \\ l
....... - (.., __. ~
Hubert J. Miller, Director Division of Reactor Safety.
Riii
,~*
Ring
- 10~/92 :/(
{Jto/~92 Riii
J. A. Zwolinski cc w/Attachment only:
R. J. Barrett, NRR M. W. Hodges, RI A. F. Gibson, RII S. J. Collins, RIV K. E. Perkins, RV TSS/RI II cc w/Attachment and Enclosure as Listed:
J. B. Hopkins, NRR *{Enc. 1)
B. L. Siegel, NRR {Encs. 2 & 4)
T. G. Colburn, NRR {Enc. 3)
A. S. Masciantonio, NRR {Enc. 5)
R. B. Samworth, NRR {Enc. 6)
L. N. Olshan, NRR {Enc. 7)
A. G. Hansen, NRR {Encs.
1~7)
B. S. Marcus, NRR {Encs. 1-7)
S. F. Newberry, NRR {Encs. 1-7)
DCD/DCB {RIDS) {Encs. 1-7).
3 OCT 2 7 1992
ATTACHMENT Page 1 of 2
\\.
REGION I I I REGULATORY GUIDE 1.97 TIA REQUEST Inspection RG 1.97 Slits Plant Report lud>ers Inspection Dates lnspector(s)
Rev. lo.
Status
~resolved ltem(s)
Davis-346/88038(DRS) 12/12/88-2/1/89 M.
~:~:n, 3
Op*n.
'346/88038-02(DRSll:
Th* lfc*n***'* plant d*sfgn dfd not fnclud* r*dundant R*port fssu*d 2/14/89 A.
EG&.G nstrument chann* s from sensor to display for steam generator pressure.
Besse Bas*d upon dfscussfon wfth NRR/SICB durfng fnsp*ctfon 90021, thfs ft... r.mafns op*n p*ndfnJ NRR r*vf*w and acc*ptanc* of th* lfc*ns** submittal dat*d 3/19/90 346/90021(DRS) 10/15/90-11/5/90 M. Kopp (Enclosur*
).
R*port fssu*d 11/21/90 G. Hausman
~346/88038-04(DRSll:
Th* lfc*ns** us*d non-Class lE pr*ssur* swftch*s fn th*
ategory i, fyp*
{licensee designated) variable, control room normal v*ntf latfon status.
Bas*d upon dfscussfon wfth NRR/SICB durfng fns~*ctfon 90021, this ftem remains open pending NRR review and acceptance of fcen***
submittal dat*d 3/15/91 to downgrad* th* varfabl* to Cat*gory 2, Typ* D (Enclosur* 1).
'346/88038-08~DRS~l:
Th* lfc*ns** has a numb*r of RG 1.97 control room nstruments t atave not been fdentf ffed with a unique fdentf ffcatfon as r*qufr*d by RG 1.97.
Thfs ftem remains open pending NRR review and acceptance of th* lfcens**'* method of control room fnstrumentatfon fdentfffcatfon (Enc'l osur* 1 l.
1 Dresden 237/90016!DRSl 5/21/90-6/21/90 M. Kopp 2
Op*n (237/90016-03(DRSli249/90015-03~DRS)l: Thfs ftam ramafns op*n p*ndfn~ NRR 249/90015 DRS R*port fssu*d 7/13/90 G. Hausman review and resolu on of the BW neu ron flux monitoring instrumentat on issue (Enclosur* 2).
(237/90016-04(DRSl;249/90015-04(DRSl);
Thfs ft*m ramafns op*n pandfng NRR review ana acceo£ance of £ne Roore solator test reoort data (Enclosure 2).
Fermi-2 341/91014(DRS) 6/24/91~6/28/91 M. Kopp 2
Op*n (341/91014-01,DRSll:
Thfs ft*m r... afns op*n pendfng NRR r*vfaw and acc*ptanc*
R*port f11u*d 7/16/91 G. Hausman of no unique den fication of control room instruments, which was identified A. Holan, EG&.G in the licensee's submittal but n*fther approvad or dfsapprovad fn th* SER (Enclosur* 31.
LaSalle 373/88027!DRSl 10/17 - 24/88 A. Gautam 2
CloHd (3i3/88027-0l(DRSl*374/88026-0l(DRSll:
Thf s f tam r*maf ns opan p*ndf ng NRR 374/88026 DRS R*port fssu*d 12/5/88 M. Kopp rev1ew and re101ut1on of "t.n* DWK neutron flux monitoring instrumentation issue M. Trojovsky, EG&G (Enclosur* 4).
373/90022!DRSl 9/17-21/90 M. Kopp (373/88027-05(DRS);374/88026-05(DRSl):
Thfs ftem remafns open pandfn' NRR 374/90023 DRS Raport fssu.*d 10/11/90 G. Hausman review and acceptance of £ne Roches er isolator test report data (Enc osure 4).
(373/90022-0llDRS\\ *374/90023-0llDRSll:
Thfs ftem ramafns open pandfng NRR rev1ew encs acceptance OT the use of resistors used as isolators between the reactor vessel level instrumentation & the Startrec system.
submitted test reoort* data IEnclosur* 41.
Licensee Pal 1sades 255/92004(DRS) 1/13-17/92, G. Hausman 3
Op*n (255l92004-03(DRSll:
Thfs ftem ramafns open pendfng NRR revf*w and acceptance 2/12-14/92, & 3/16,92
- w. Scott of t e use of res stars used as an isolation interface 1n two casesi Licensee R*port f ssued 5/1/ 2 A. Udy,EG&G to provide test raport data to NRR by 12/31/92 (Enclosure 5).
(255/92004-04!DRS)l; Thfs ft*m conc*rns the use of a non-tested, hance, non-approvedsola ion device used to isolate a non-Class lE recorder from the variable containment hydrogen monitor; to NRA bv 12/31/92 (Enclosure 5).
Licensee to provide test report data
ATTACHMENT Page 2 of 2.,_
REGION II I REGULATORY GUIDE 1.97 STATUS Inspection RG 1.97 Sitts Plant Report lud:>ers Inspection Dates lnspector(s)
Rev. lo.
Status
~resolved ltell(s)
Point 266/91010~DRSl 5/13-17/91 M. Kopp 2
Open (266,91010-0lfDRS}j301l91010-0l(DRSll; This Item concerns the lack of 301/91010 DRS Report Issued 6/4/91
- c.
~!7t{G&.G qual f1ad 1so at1on for foxboro H-L na fnstrurn9ntatfon at computar and control Beach A.
loops.
This Item remains open pendln~ NRR review and acceptance of th*
license*'* submittal dated July 5, 19 1 (Enclosure 6).
(266l91010-03,DRS}j301,91010-03(DRS}l; The licensee had a number of RG 1.97 control room nstrumen s that had no bean fdantfffad with unfqua Identification as required by RG 1.97.
This item remains open pending NRR review and acceptance of the license*'* submittal* dated July 5, 1991, and t~!~t~~lc!~~~~ ~~~~~~=~~: ~~~ method of control room Instrumentation Quad 254/88027~DRSl l 1/ 14/88-12/ 13{88 A. Gautam 2
Open (254/88027-0l(DRSl*265/88028-0l(DRSll; This item remains open pending NRR 265/88028 DRS Report issued 2/13/88 A. Nolan, EG&.G raviaw ana raso1u't1on OT 'tn* ow" nau'tron flux monftorfng fnstrumantatfon fssua Cities R. McConnlck, EG&.G (Enclosure 7).
(254l88027-03(DRS}j265l88028-03£DRS; This item remains open pending NRR 254/91002~DRSl 1/7-11/91 M. Kopp rav1aw and acceptance of the ad 1t1ona1 fnstrumentatfon/analysf s fdantf ffad fn 265/91002 DRS Report I uu*d 2/27/91 G. Hausman the licensee's submittal dated December 9, 1991. This item concerns the analysis of reactor level Instruments 263-73A and 738 Indication failing high when the recirculation pumps are running (Enclosure 7). (254l88027~05(DRS}j265l88028-05(DRSl}; This Item remains open pending NRR review and acceptance of the Moore solator test report data (Enclosure 7). (254l88027-06(DRS}j265l88028-06(DRSl}; This item remains open pending NRR review and acceg£ance of the Moore solator test raoort data (Enclosure 7l. ~*.}}