Monthly Operating Repts for Jan 1980
ML17174A438
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/01/1980
From: Cieszkiewicz S
COMMONWEALTH EDISON CO.
To:
Shared Package
ML17174A437 List:
References
NUDOCS 8002120653
Download: ML17174A438 (19)


Text

!

AVERAGE DI\\ IL Y UtllT PO\\-l[R LE'JEL DOCKET NO. 050-010 UlllT Dresden I DATE February 1, 1980 COMPLETED BY S. A. Cieszkiewicz TELEPHmJE (815) 942-2920 MOIHH JANUARY 2 1980 DAY AVERAGE DA"I LY PO\\-iER LEVEL DAY AVERAGE DAI LY PO\\./ER LEVEL (H\\Je-Ne t)

(M\\-/e-Net) 0 17 0

2 0

. 18 0

3 0

  • 19
  • O 4

0 20 0

5 0

21 0

6 0

22 0

7

0 23 0

8 0

24

-0 9

0 25 0

10

. 0 26 0

11.

0 27 0

12 0

23 0

13 0

.29 0

14 0

30 0

15 0

31 0

16 0

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0.050-237 Ull I TDresden II DATEFebruary 1, 1980 COMPLETED BYS. A. Cieszkiewicz TELEPHONE(815) 942-2920 MOIHH JANUARY, 1980 DAY AVERAGE DAILY POWER LEVEL DAY*

AVERAGE DA IL Y P0\\4ER LEVEL (MWe-Net)

(MHe-Net) 753 17 744 2

756 18 653 3

759 19 425 4

779 20 602 5

735 21 723 6

561 22 736.

7 705

. 23 737 8

755 24 743 9

25 10 750 26 752 11 746 27 663 12 738 28 659 13 693 29

. 691 14 757 30 331 15

. 747 31 454 16 749 *.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 Utl IT Dresden III DATE February l, 1980 COMPLEIED SY S. A. Cieszkiewicz TELEPHONE (815) 942-2920 MO!HH JANUARY, 1980 DAY AVE?.AGE DAI LY PO\\-iER LEVEL DAY AVERAGE DA IL Y PO\\*/ER LEVEL (M\\./e-:-Net).

(M\\-/e-Net) 512 17 521 2

521

. 18 519 3

5.22

  • 19
  • 518 4

537 20 519 5-

-509-21 520 6

524 22

- 518 7

,521 23 520 8

526 24 520 9

520

--- 25 518 10

- 521 26 517 11 521 27 518 12 23 51 13 518 29 514 14 518 JO 511

- 15 519 31 509 16 522

No.

8' F: s:

Date 781031 Forced.

Scheduled cu

0.
s.

2 L

0 c-N*

0 Ol'-'

0 Ill

  • C c u 0

"C *-

l1J

µ

J Ill 0

µ QI 111 0 ra

.r:. uo:::

\\,, :J:

QI

.,., ::J

J-0:::

cu.r:. c 0

c VJ 3 0

0 UN IT SllUTDOWHS AND PO\\JER "E DUCT I ous*

. REPORT MONTH JANUARY,* 1980

µ c

Licensee c;.:r

. o*n QI QI c

cu Event

µ "C

0 "C Ill 0

a. 0 Report H

>-U Eu*

VJ.

0 u

U ()I.I :l I II r I. 0.

..::5~0~-..::::0..:::1..::::0 ____ _

Ull IT tffl/1[ Dresden I DATE: Februarv 1. 1980 COHPLETED UY S. A. Cieszkiewicz TELEPHOttE (815) 942-2920 Cause £ Corrective Act ion to Prevent Recurre~ce

  • 74.4 *.

c

)

. Re.fuel and chemical cleaning outage. *

i.

I.

Reason:

A-Equipment Failure (Explain)

. B-lfo I ntenance of Test C-Refuel ing 0-Regulatory Restriction E-Operator Training & Llce~se F-Admlnlstratlva 3

Examination G-Operatlonal F.rror H-Other (Explain)

Method:

  • .l -Manua 1.

2-llanual Scram 3-/\\uton1at le Scram

~-other (Expl~ln) 4 ExhlbLt G-ln~tructlon~. for Preparation of Data Entry Sheets. for Licensee Event Report (LER)Fllc(NUREG-0161)

(.

1 No..

1 F: s:

Date 800130 I

Forced Scheduled

-cu

0.

t-F I

2 UOLI :L I II 11.

0~5~0~-~2:.::::3~7 ____ _

UNIT s11uromms AND POHER "rnucT1ous

  • Ull IT 111\\11[ Dresden TT DATE February 1. 1980 COMPLETED UY S. A.

Cie~zkiewicz TELEPHO~E (815) 942-2920 REPORT MONTH JANUARY, *1980 M

L.

\\I-.

0 c-N 0

Ol µ 0

Ill

  • C c u licensee L.

0

'U *-

ro

µ

J Ill 0

µ cu Event ro 0

.IQ

.r::.

µ 0:

µ L. :c cu

J Report
J-a::

cu.r::. c 0

2:: V1 3 0

0 14.*32 G

'1

\\

i I

Reason:

A-Equipment.Failure (Explnln)

B-Hnintenance of Test C-Refuel Ing H

c""° cu cu

µ

'U Ill 0

>-U V1.

D-Regulatary Restriction E-Opcrator Training & license F-Admlnlstratlve Exam I nat Ion.

3 I

µ c

. QI/\\

Cause &. Corn~ct ive c cu 0"0 Act ion

0. 0 to E u Prevent Recurrence 0

u The unit was inadvertently manually scrammed upon receiving a half-scram signal on Reactor Protection System Ch~nnel B.

  • I G-Opcratlonal

~rror H.:.Other (Explain)

Method:

I '"t1anua I 2-llanua 1 Sc rain 3-Auio~atlc Scram I

  • 4-other (Explain)

Exhibit G,..lnstructlons. for Preparation of Oa~a Entry Sheets for Licensee Event Report (LE~)File(NUREG~

.0161)

(

No.

Date

  • ~..

. 1 F:

Forced S~

Scheduled

. ~.. '

(

1 QJ a.

t-2 UN IT SllUTOO\\.ll~S ANO PO\\JER RE DUCT I OllS

. REPORT MONTH JANUARY, *1980 c-N 0

Ill c

0

... ::J Ill 111 0

ID

.... x QJ

J -

0::

0

~.

0 0

OI µ c u "O *-

ID 0... QJ

.c... 0::

... :I Ill.c c 2: Vl 3

.\\

0 0

Licensee Event

_Report H Reason:

A-Equipment Failure (Explnln)'

B-lfolntenance of Test C-Refuel Ing 0-Rcgula~dry Rcstrlctl6n c;.:r.

QJ Cll

... "O Ill 0

>-U Vl.

£-Operator Training & Llcehse Examlnat1on.

F-Admlnlstratlve 3

  • c QJJ"\\

c QJ 0 "O

a. 0 eu 0

u G-Opcratlonal Error H-Other (Explain)

Method:

1-Manua I 2-llanual Scram J-Auio~atlc Scram lJ ()I.I: l I 11 I)

  • 0:.:5:..:0:....-...::2:...;4:.;;.9 ____ _

Ull IT WI/IE Dresden III D/\\TE February 1. 1980 COMPLETED IJY $. A. Cieszkiewicz TELEPHO~E (81~) 942-2920 Cause & Cor~ectl~e Act ion to Prevent Recurrence.

4-other (Explain)

Exhibit G-lnstructlons. for Preparation of Data Entry Sheets for Licensee Event Report (LE~)Filc(NUREG-,

016 I)

(

OPERATING DATA REPORT OPERATING STATUS I.

Unit Name: Dresden I

2.

Reporting Period: January, 1980

3.

Licensed Thermal -P-ow_e __

r--.-(M-W~t-)_: ____ 7

__ 0_0 _______________ ~

4.

Nameplate Rating.(Gross MWe): 209

5.

Design Electrical Rating (Net--M\\-.Je-).....-: -20_0 __________ _

6.

Maximum Dependable Capacity (Gross M\\.Je):~2-=o.. s ______ _

7.

Maximum Dependable Capacity (Net MWe): 197 DOCKET NO. 050-010 DATE February 1, 1980 COMPLETED BYS. A.

Cieszkiewic~

TELEPHONE (815) 942-2920 NOTES

8.

If Changes Occur. in Capacity Ratings...,.(-1-t-em_s_3 __ T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:

NA

9.

Power Level to \\.Jhich Restricted,* If Any (Net; MWe): NA


~

10.

Reasons For Restrictions, If Any:

NA This Month Yr-to-Date Cumulat.i.Ye.

11.

Hours in Reporting Period 744 744 173 2544

12.

Number of Hours Reactor Was Critical 0

0 1132153. 75

13.

Reactor Reserve Shutdown. Hours 0

0 0

14.

Hours Generator On-Line 0

0 111,196.15

15.

Unit. Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH)

  • 0 0

56 2014 1747.15

17.

Gross Electrical Energy Generated (MWH) 0 0

16.722.259:.l2

18.

Net Electrical Energy Generated (MWH)

-874.8

-874.8 15.8o8.25l.12

19.

Unit Service Factor 0

0 64.1

20.

Unit Ava i 1 ab i I i ty Factor 0

0

. 64.1

21.

Unit Capacity Factor (Using MDC Net) 0 0

46.2

22.

Unit Capacity Factor (Using DER Net) 0 0

45.5 2 3.

Unit Forced Outage Rate

o.
0.

11.2

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each NA

25.

If Shut Down At End Of Report Per.iod, Est-i mated Date of Sta rt up : ___

N.._A.... __....,... ______ _

OPERATING DATA REPORT DOCKET NO. 050-237

....=..;;_~----.....,---

DATE February 1,. 1980 COMPLETED BYS. A. Cieszkiewicz TELEPHONE (815) 942-2920 OPERATING STATUS NOTES

1.

Unit Name: Dresden II

~------------------------

2.

Reporting Period:_J_a_n_u_ar~y._._,_1_9_8_0 __________ __

3.

Licensed Thermal Power (MWt) : 252 7

-="""""....._ ________ __

4.

Nameplate Rating (Gross MWe):

828

5.

Design Electrical Rating (Net-M\\--~e--),.__: _7_9_4 ______ _

6.

Maximum Dependable Capacity (Gross MWe): 812


"'"T 7,

Maximum Dependable Capacity (Net MWe):

772

8.

If Changes Occur in Capacity Ratings _(_l_t-em_s_3_T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:

NA

9.

Power Level to \\~hich Restricted, If Any (Net MWe).:

NA ________ __,_ ________ __

10.

Reasons For Restrictions, If Any:

NA

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

Hours in Reporting Period Number of Hours React6r Was Critical Reactor Reserve Shutdown Hours Hours.Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated* (MWH)

Gro~s Electrical Energy Generated (MWH)

Net Electrical Energy tenerated (MWH)

U~it Servi~e Factor Unit Availability Factor Unit Capacity Factor (Using MDC.Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate Shutdowns Scheduled Over Next 6 Months NA This Month Yr-to-Date 744 744 734. 6 7 734.67 0

0 729 ~ 68 729. 68 0

0 1,669,987 1,669,987 537,321 537,321 511,320.4 511. 320. 4 98.1*

98.1

98. 1:

9B.1 89.0 89.0 86.6 86.6 1.9 1.9 (Type, Date, and Duration of Each c.urnula ti ye.

85,200 65,471.1 0

61.922.22 123, 311,819 39,543,940 37,399,431.617

. 72. 7

72. 7 56.9 55.3 13.4
25.

If Shut Down At End Of Report Period, Estimated Date of Startup:_N_A ______ _

I OPERATING DATA REPORT DOCKET NO. 050-249 I

DATE February 1. 1980

. COMPLETED BYS. A. Cieszkiewicz TELEPHONE (81~) 942-2920 OPERATING STATUS NOTES

l.

Unit Name:

Dresden III

--'--.0................__.........._ ____________________________ _

2.

Reporting Period: January, 1980

3.

Licensed Thermal _P_o_w_e_r-....(-MW __

t_)_: __

2_5_2_7 __________________ _

4.

Nameplate Rating (Gross MWe):

828

5.

Design Electrical Ratirig (Net MWe): 794

6.

Maximum Dependable Capacity (Gross -M\\~-le~)-:_8_1_2----,..------

7.

Maximum Dependable Capacity (Net MWe):

773

8.

If Changes Occur in Capacity Ratings _(_l.....

te"""m-..s __ 3 __ T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:

NA 9,

Power Level to \\-lhich Restricted, If Any (Net MWe):

550 MWe

--~~--~--------------------------

10.

Reasons For Restrict ions, If Any: Administrative derating for air ejector activity

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

2 3,

24.

evaluation.

Hours in Reporting Period Number of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Gene~ator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (Using MOC Net)

UnJt Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 744 744 0

744 0

1,275,133 407,966 384,540.6 100 100 66.9 65.1 0

Yr-to-Date 744 744 0

744 0

1, 275, 133 407 z 966 384,540.6 100 100 66.9 65.1 0

Shutdowns Scheduled Over Next 6 Months (Type,* Date, and Duration of Each Refuel, March 17, 1980; approximately 10 weeks Cumulat ilte.

74 785 56,509.32 0

54,068.53 0

103,546,800 33,837,640.25 32, 077. 831. 569

72. 3
72. 3 55.5

. 54.0 16.3

.25.

If Shut Down At End.Of Report.Period, Estimated Date of Startup:

NA

DRESDEN UN IT 1 SAFETY RELATED MAINTENANCE"".' JANUARY, 1980.

NATURE OF LER OR OUTAGE MALFUNCTION-EQUIPMENT

-MA I llTENAl~CE NUMBER CAUSE RESULT CORRECJIV£~AtTION Control Rod Preventive WR #8142 Outage llF8 NA NA

_ Re_built control rod drive Ive SN 1313 Preventive wR 118129 Control Rod Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1242 Control Rod Preventive WR 118136 Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1238 Control Rod Preventive WR i/8148 Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1269 Control Rod Preventive WR 112414

Drive-SN 1252 Control Rod Preventive WR 112411 Outage 111-8 NA

_NA Rebuilt control rod drive Drive SN 1250

.trol Rod Preventive.WR 112412 Outage 111-8 NA NA Rebu;l.lt control rod drive ve SN 1233 Control Rod Preventive WR 112410 Outage //1-8 NA NA Rebuilt control rod drive Drive SN 1266 Control Rod Preventive WR 112407 Outage 111-8 --

NA NA Rebuilt control rod drive Drive SN 1260 Control Rod Preventive WR 112395 Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1293 Control Rod. -

Preventive WR //2405 Outage //1-8 NA NA Rebuilt control rod drive Drive SN 1272

'Control Rod Preventive WR //2398 Outage //1-8 NA NA Rebuilt control rod drive Drive SN 1282

DRESDEN UNIT l SAFETY RELATED MANTENANC~ -

JA'NUARY, 1980 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPHEIH MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE i~TION Control Rod Preventive WR /12409 Outage 111-8 NA NA Rebuilt control rod drive

.ve SN 1268 Control Rod Preventive WR 112396

.. Outage 111-8 NA.

NA Rebuilt control rod drive.

Drive SN 1281 Control Rod.

Preventive WR /18()97 Outage 111-8 NA NA Rebuilt control rod drive Drive SN 1249 I

l I

/

e

EQUIPMENT AO Valve 1601-5t e

Torus Vent Valves Rod Movement Control LPCI & Core Spray Hangers.

1539-1, 1405-2

& 3 Main Turbine #3 Control Valve.LPRM 32-49C e

Core Spray Dis-charge Hanger LPCI_Heat Ex-*

changer Intake Hanger NATURE OF MA I NTEl4ANCE Corrective WR #3497 Preventive WR #3740 Preventive WR #3860 Preventive WR #3621 Preventive WR #4008 Preventive WR* #3761 Preventive WR #3622 Preventive WR #3623 Condensate Deroin Preventive WR #3624 Hangers LPRM 16-4lQ__ _

Preventive WR #3695 Control Rod Drive SN 599 Preventive WR #7796 DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - JANUARY, 1980 MALFUNCTION LER OR OUTAGE llUMBER CAUSE RESULT Outage #2-14 Outage #2:-14 LER /180-l/03L-0 Bad piston cups

& wiper.

NA NA NA NA NA NA NA NA NA NA Leakage NA NA NA NA NA NA NA NA NA NA CORRECT I Vr>: ACT I ON Installed new piston cups

&. wiper Redrilled plugs & replaced Re.placed switch Installed missingspacer &

tightened nuts & b6lts Replaced micro switch Checked LP~ -

found no problem Installed new bolt spacer Installed new bolt Tight~ned all loose nuts &

repositioned as required Checked LPRM & found no problems Rebuilt control rod drive

EQUIPMENT Control Rod Ve SN 7801 Control Rod Drive SN 1079 Control Rod Drive SN 53 Control Rod Drive SN 28 Control Rod Drive-SN 490C Versa Valve 1601-22

' " 24/48 Volt tery Charger 125V Battery Charger Reactor Bldg~ to Turbine Bldg.

Interlock Doors Torus Low Level Alarm NATURE OF MA I NTEIMNCE Preventive WR #7801 Preventive WR #7803 Preventive WR #1071 Preventive WR #7785 Preventive WR #7790 Corrective WR #4152 Preventive WR #4072 Preventive WR #4038 Preventive WR #4137 Preventive WR #4079 f>RESDEN.UN IT 2 SAFETY RELATED MAINTENANCE-JANUARY, 1980 MALFUNCTION LER OR OUTAGE llUMBER CAUSE RESULT NA NA NA NA NA NA NA NA NA NA Bad Valve Leakage NA NA NA NA

adjusted Freed up timer & lubri-cated Repaired door latch &

frame Recalibrated transmitter

& alarm unit*

EQUIPMElff CV 113 Fast Act-Solenoid 2C & 2G Main Steam Line H.igh Flow Switches HPCI Gland Pump Level Torus Vent Valve Isolation Con-denser Steam Line Isolation Valve*

-I Manual.

Valve HPCI Pump Dis-charge Valve Refueling Grapple Cont ro 1 Ro<l Drive SN 50-15 Torus Vent Valves NATURE OF HA I NTENANCE Preventive WR 113881 Preventive WR 113335 Preventive WR 113873 Corrective WR 113635 Corrective WR 113609 Corrective WR 113733 Corrective WR 113734 Preventive WR 113453 Preventive WR 114209 Preventive WR 113741 DRESDEN UN IT 3 SAFETY RELATED MANTENANC~ -

JANUARY,

  • 1980 LER O.. OUTAGE NUMBER MALFUNCT I orr LER /179-36/03L-0 Outage 113-12 Outage 113-12 CAUSE RESULT.

NA NA NA Bad Valve Packing Needs Adjustment Packing Needs Adjustment Packing Needs Adjustment NA NA NA NA NA NA Leakage Leakage Leakage.

Leakage NA NA NA

  • CORRECTIVE f~TION Replaced snap lock switch Repaired bind:i,ng on linkage Reinstalled mercury switch back in case & re-plac~d cover for high level
  • switch.

Rebuilt valve.

Adjusted packing - still leaks Tightened packing Tightened packing Performed mechanical &

electrical inspection Replaced accumulator Removed pipe plugs &.re-placed with 1/8" drilled hole. plugs

p I

s EQUIPHEtfT res sure Sup-ssion Hang en 1605

,RM

  1. 17/APRM 115 elector Switch.

NATURE OF

  • MAINTENANCE Preventive WR #3486 Preventive T-lR #36 75 DRESDEN.UN IT 3 SAFETY RELATED HANTENANC~ -

JANUARY, 1980 LER OR OUTAGE HALFUNCT I Otf NUMBER CAUSE RESULT CORRECTIVE i.~TIOH NA NA Repaired hangers NA NA Cleaned slidewire I '

I

/

DRESDEN UtHT 2/3 SAFETY RELATED* MANTENANC( -

JANUARY, 19RO NATURE OF LER Q,; OUTAGE MALFUNCTIOU EQUIPHEIH MA I NTENANCE NUMBER CAUSE RESULT CORRECTIVE i'!::T I ON Spare 1\\ecirc Seal* Preventive '*TR f.17932 NA NA Installed union halves*

.nr,e that mate to unions on recirc. pumps Spare IR~1 VoltagE Preventive WR #6675 NA NA Replaced capacitor_&

Pre-Amplifier teste.d pre-,amp Versa Valve Preventive HR If 3l1SO NA NA RehuHt valve

~

y

SUMMARY

OF OPERATING EXPERIENCE UNIT ONE 1-1 to 1-31 JANUARY, 1980 Unit One was shutdown for the entire month, continuing preparation for cheniical cleaning and refueling.

SUMMARY

OF OPERATING EXPERIENCE 1-1 to 1-30

. 1-31 UNIT TWO JANUARY, 19 80 Unit Two operated during the month at an avera*ge power level of 699 MWe.

On January 30 at 1045, the unit was

~nadvertently manually scrammed upon receiving a half-scram signal on RPS Channel B.

The unit was placed on line at 0104 on January 31 and operated for the re-mainder of the month, resulting in a capacity factor of 86.6% for the en-tire month.

SUMMARY

OF OPERATING EXPERIENCE UNIT THREE JANUARY, 1980 1-1 to 1-31 The unit operated continuously during the.entire rrionth at an aver-age power level of *

.. 519 MWe, with a capacity factor of 65.1%.