I AVERAGE DAILY UNIT POWER LEVEL MONTH OCTOBER, 1979 DAY 2
5*
6 7
a*
9 10 11 12 13 14 15 16 AIJERAGE DAI LY PO\\/ER LEVEL DAY (HWe-:-Net) a 17 0
. 18 0
- 19 0
20 0
. 21 0
22
,o 23 0
24 0
25 0
26 0
27 0
23 0
29 0
30 0
31 DOCKET NO~ 050-010 Ull IT Dresden* I DATE November 3, 1979 COMPLETED BY S. !\\.. Cieszkiewicz TELEPHO~E (815) 942-2920 AVERAGE DAI LY PO\\./ER LEIJEL (MHe-Ne t) 0 0
- O 0
0 0
0 0
0 0
0 0
0 0
0 7911190 30?
I
- I DA'(
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 AVERAGE DAILY UHIT POWER LEVEL DOCKET NO. 050-237 Ull IT Dresden II DATE November 3, 1979 COMPLETED BYS. A. Cieszkiewicz
- TELEPHO~E (815) 942-2920
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-249 Ufl IT Dresden III DATE November 3, 1979 COMPLETED 8Y S. A. Cieszkiewicz TELEPHONE (815) 942-2920 MOtHH OCTOBER, 1979 DAY
- AVERAGE DAILY PO\\.iER LEVEL DAY AVERAGE DAI LY PO\\./ER LEVEL (M\\fo'."'Net)
(MHe-Net) 523 17 526 2
525
. 18 526 3
523
- 19 528 4
526 20 523 5
527 21 525 6
521 22 525 7
528-23 526 8
469 24 527 9
511 25 522 10
- 522 26 152 11 514 27 378 12 508 23 438*
13 528 29 497 14 513 30 525 15 519 31 16 526
- Time change - add l* br.* __ *-
("*
c-.
OPERATING DATA REPORT OPE RAT I f*JG STATUS Unit Narne: Dresden I Reporting Period:.,,....,.o~c~t~o~b~e~r~._.,..1~9~7~9----------~
Licensed The rma 1 Power (HWt) : 700 Nameplate Rating (Gross MWe) :_2_0_9 _________ _
Design Electrical Rating (Net M\\.Je): 20.Q Maxi mum Dependable Capacity (Gross -M""'\\./""'e..,f-: _2_0_5 ____ _
~-"'-------
DOCKET NO. 050-010 DATE November 3, 1979 COMPLETED BY S. Cies_zkiewicz TELEPHONE (815) 942-2920 NOTES
- l.
- 2.
- 3.
- 4.
- s.
- 6.
].
- 8.
Maximum Dependable Capacity (Net M\\.Je): 197 If Changes Occur in Capac"ity Ratings..,.(-=1""'te..:..m-s ___ 3_...,.T..,..h_r_o_ug_h_ 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to\\./hichRestricted, If Any (NetMWe):
NA
~
- 10.
Reasons For Restrictions, If Any:
NA
--""=------------------------
This Month Yr-to-Date Cumulati.'lC.
- 11.
Hours in Reporting Period 745 7226 171. 336
- 12.
Number of Hours Reactor Was Critical 0
0 113, 153. 75
- 13.
Reactor Reserve Shutdown Ho~rs 0
0 0
- 14.
Hour.s Generator On-Line 0
0 111.196.15
- 15.
Unit Reserve Shutdown-Hours 0
0 0
- 16.
Gross Thermal Energy Generated (MWH) 0 0
56,014.747.15
- 17.
Gross Electrical Energy Generated (M\\m) 0
- 1. 20 16,799.254.19
- 18.
Net Electrical Energy Generated (MWH)
-11 145. 1
-111 705. J 151811.168.62
- 19.
Unit Se.rvice *Factor 0
0 65.2
- 20.
Unit Availability Factor 0
0 65.2 2 I.
Unit Capacity Factor (Using. MDC Net) 47 1
- 22.
Unit Capacity Factor (Using DER Net) 0 0
46,J
- 23.
Unit Forced Outage Rate 0
0
- 11. J
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
NA
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup: __
N_A _____ _
~........ _ *.
---*---~-**
' \\
c OPERATING DATA REPORT DOCKET NO. 050-237
__,.------~
DATE November 3, 1979 COMPLETED BYS. Cieszkiewicz TELEPHONE (815) 942-2920 OPERAT lr~G STATUS t~OTES
- 1.
Unit Name: Dresden II
__,.--------.,....,,..----------~
- 2.
Reporting Period: October, 1979
- 3.
Licensed Therma 1..,,..P_o_w_e_r-,-(H-W-=-t-.)..-: -2,,........,,5"'"'2"""7,,.._--------
4, Nameplate Rating (Gross M\\.Je):
828
--.----------~
- 5.
Design Electrical Rating (Net M\\ve): 794 6.* Maximum Dependable Capacity (Gross~M~\\v~e~)-:-8_1_2----~
- 7.
Maxi mum Depend ab 1 e Capacity (Net M\\~e) :............. 7.... 7... 2-----
- 8.
If Changes Occur *in Capadty Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to \\vhich Restricted, If Any (Net MWe):
NA
~
- 10.
Reasons For Rest*rictions, If Any:
.....J.:LC!.-----------------------~
This Month Yr-to-Date C umula t i. 'le.
- 11.
Hours in Reporting Period 745 7.296 82,99?
- 12.
Number of Hours Reactor Was Critical 566.2 5 863 63,308.2
- 13.
Reactor Reserve Shutdown Hou.rs O
O O
- 14.
Hours Generator On-Line 543.17 5, 750.1 59.867
- 15.
Unit Reserve Shutdown* Hours 0
O O
- 16.
Gross Thermal Energy Generated (MWH) 1,270.720 12.869.495 118,342,135
- 17.
Gross Electrical Energy Generated (MWH) 413.394 4.142,434 37,937,158
- 18.
Net Electrical Energy Generated (MWH) 391,522 3,920,480.853 35,868.962.426
- 19.
Unit S~rvice Factor 72.9 78.8 72.1
- 20.
Unit Availability Factor 72.9 78.8 72.1
- 21.
Unit Capacity Factor (Using MDC Net) 68.1 69.6 56
- 22.
Unit Capacity Factor (Using DER Net) 66.2 67.7 54.4
- 23.
Unit Forced Outage Rate
- 3. 3
- 3. 7
- 13. 8
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each None
- 25.
If Shut Down At End Of Report Period, Estimated-Date of Startup:......:..;.NA;.:._------
( __.
OPERATING DATA REPORT
\\
DOCKET NO. 050-249 DATE November 3, 1979 COMPLETED BYS. Cieszkiewiez TELEPHONE (815) 942-2920
,OPERATltJG STATUS NOTES
- 1.
Unit Name:
Dresden III
--=:-=-...-..-=--------------------~
- 2.
Reporting Period: October, 1979
- 3.
Li cens ed The rma 1 _P_o_w_e_r__,.(-HW..__t.--) -: 2_5_2_7 _________ _
- 4.
Nameplate Rating (Gross MWe):
828
--=-.=-------------
- 5.
Design Electrical Rating (Net M\\./e): 794
- 6.
Maximum Dependable Capacity (Gross -M~W~e~)-:-8--12----~
- 7.
Maximum Dependable Capacity (Net MWe):
773
- 8.
If Changes Occur in Capadty Ratings..,.(-1-tem_s_3_T_h_r_o_u_g_h 7) Since Last Report, Give Reasons:
NA
- 9.
Power Level to Which Restricted, If Any (Net MWe):
550 MWe
- 10.
Reasons For Restrictions, If,.Any: Administrative derating for air ejector activity lL
- 12.
- 13.
- 14.
- 15.
- 16.
1 7.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
This Month Hours in Reporting Period 745 Number of Hours Reactor Was Criticat 736.1 Reactor Reserve Shutdown Ho~rs O
Hours Generator On-Line 731.75 Unit Reserve Shutd.own* Hours 0
~ross Thermal Energy ~enerated (MWH) 1.244.451 Gross Electrical Energy Generated (MWH) 391.784 Net E 1 ectr i ca 1 Energy Generated (MWH) 371. 311 Unit S~rvice *Factor 98.2 Unit Availability Factor 98.2 Unit Capacity Factor (Using MDC N~t) 64.5 Unit Capacity Factor (Using DER Net) 62.8 Unit Forced Outage Rate 1.8 Shutdowns Scheduled Over Next 6 Months (Type, Date, Refuel, March 17, 1980, approximately 10 weeks Yr-to-Date 7.296 4.673.97 0
4.580.43 0
9,303,053 2.974.357
- 2. 809 0 391. 14 z 62.8 62.8 49.8 Curnulat i.'l~.
72, 577 54~382.68 0
51.971.17 0
100,061,820
- 32.725.517.25 31.026.868. 76
- 71. 6
- 71. 6 55.3
______ 4..... 8......... 5_
s 1. 8 3._6"'-'. __ 6_
- 16. 8 and Duration of Each):
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:_.;.;.NA=-------
(~..
- Error discovered on August and September reports for Gross Generation.*
Cumulative total should be 32, 725, 517.* 25.
........ ~.:...
No.
- I 8
I F:
S:
Date 781031 Forced Scheduled
(
QJ
- 0.
s 2
c......
N 0
Ill
. c L
0
µ
- J VI 111 0
IU
~ ~
0 UNIT SllUTDOWHS AND PO\\*JER REDUCTIOUS
. REPORT MONTH OCTOBER,* 1979 Licensee Event Report H Ci.:t QJ QJ
.... "'O Ill 0
>-U I/).
.µ c
. GJ/\\
c Q) 0 "O
.0. 0 EU 0 u lJIJ (, l:l I I I I I. 0...:.5...:.0_-_0_10 ___ _
Ull IT Ill\\/ I[ Dresden I DATE November 3, 1979*
- COMPLETED UY S. A. Cieszkiewicz TELEPHONE (815) 942-2920 Cause & Corrective Action to Prevent Recurrence 745 c
3 Refuel and chemical outage i
Reason:
A-Equipment Failure (Explnln)
B-11aintenance of Test C-Refuel Ing 0-Regulatory Restriction E-Operator Training & License F-Admlnlstratlve 3
Exam Ina t I on G-Operatlonal F.rror H-Other (Explain)
Method:
l -11anua I 2-11anua I Scram 3-Auio~atlc ~cram
~-other (Explain)
Exhibit G-lnstr~ctlons. for Prep~ratlon of Data Entry Sheets for Licensee.
Event Report (LER)Filc(NUREG-0161)
( *-
No.
.11 12 F:
. s:
Date 791013
-:/91020.
Forced Scheduled
-QJ a.
t-s F
2 vu 1. l:l 1 1111
- o.;;.s...::.o_-=-2=-3.:....7 ~---*--"
UNIT SllUTDOWNS ANO PO\\JER REOUCTIOUS Ull IT 11/\\/IE Dresden II DATE November 3, 1979*
- COMPLETED UY S. A. Cieszkiewicz TELEPHONE (815) 942-2920
. REPORT MONTH OCTOBER,' 1979 M....
0 c-N 0
111µ 0
Ill c
c u Licensee 0
"O *-
IU
µ
- I Ill 0
µ Q)
Event.
111 0 111
.£:
4..1 a:
.... x Q)
- J Report
- 1-a:
cu..c c 0
x: V) :?
0 0
183.2 F
1
- .*I 18.6 A
3 I
\\
Reason:
A-Equipment Failure (Explnln)
B-11alntenance of Test C-Refuel Ing I I II
~
cu Cl.I
µ "O
Ill 0
)-..U V1 D-Rcgulatory Restriction E-Opcrator Training & Llce~se F-Admlnlstratlve Exam I nat Ion.
I
µ c
. OJ/\\
Cause & Correct Ive c
Q) 0 "O Act ion to
- a. 0 E u Prevent Recurrence 0
u Shutdo'wn for hanger and anchor bolt inspe~tion
~ scram (moisture separator. drain,
.Hi_Hi level)
G-Operatlonal Error H-Other (Explain)
I
~-other (Explain) tank Exhibit G-lnstructlons. for 3 Method:
Preparation of Data I-Manual
. 2-llanua I Scram 3-Auio~atlc Scram Entry Sheets for Licensee Event Report (LER)Fllc(NUREG-0161)
\\
(.
No.
R F: s:
Date 791025
.1*
Forced Scheduled
(
l
-Ill
- 0.
F 2
UULl:l I 1111.
0:.::5:.::0_-.=2...:..4.:;_9 ___ _
UN IT SllUTDOWl~S ANO POHER "EDU CT I OllS UlllT N/\\/IE Dresden III
. REPORT MONTH OCTOBER,' 1979 DATE Noyember 3, 1979*
- COMPLETED UY s, A. Cieszkiewicz TELEPHONE (815) 942-2920 L
0
- c-N 0
C)µ 0
Ill c
c u Licensee L
0 "U *-
ftJ
.... :J Ill 0....
..c.... a:
Event L :c Cll
.... :J u:
Cll..c c Report 0
x: V1 l 0
c 13.3 G
3 I
\\
- i.
Reason:
A-Equipment Failure (Explain)
B-Halntenance of Test C-Refuellng
'f c;.;r Ill (IJ
.... "U 11'1 0
)o-U V1.
D-Rcgulatory Restriction E-Operator Training & License F-Admlnistratlve Examlnat Ion*
I 3
.... c
. Qlf\\
Cause & Correct Ive c Ill 0 "U Act ion to
- a. 0 E u Prevent Recurrence 0
u Group I Isolation - Operational Error Foreina-n slammed cabinet and
\\
G-Opcratlonal Error H-Other (Explain)
Method:
l-11anual 2-11anua l Scram 3-Auio~atlc lcram AC &
door on ESS MG set relay
~
DC relay tripped*
I I
~-other (Explain)
Exhibit G-lnstr~ctlons. for Preparation of Data Entry Sheets for Licensee Event Report (LE~}Fllc(NUREG-0161)
\\
(
DRESDEN UNIT I SAFETY RELATED MAINTENANCE -
OCTOBER, 1979 NATURE OF LER 'OR OUTAGE MALFUNCTION*
EQUIPMENT MAI llTENANCE NUMBER CAUSE RESULT CORRECTIVr~ACTION Refueling Grappl Preventive W.R. /11817 Outage 111-8 NA NA Machined new pulley &
installed Refueling Grappl*
Preventive W.R. 111818 Outage 111-8 NA NA Machined stops* from seconcf stage mast e
Refueling Grappl*
Preventive W.R. 112332 Outage 111-8 NA NA Adjusted slack cable switch
~-
~.
e
1 Clean Up Valve i 2-1299-004 HPCI Valve 2-2301-35
, Refueling Pla~
, form i
I i Reactor Bldg.
'. Equipment Drain
\\ 2001-3 NATURE OF MAINTENANCE Preventive W.R. #2214 Preventive W.R. #2 360 Preventive W.R. //2217 Preventive W.R. 111937 Preventive W.R. 112 390
, Drywell Equip-Preventive W.R. #1902
~ ment Hatch Core Spray Line Preventive W.R. #2392 Hanger 140 3-M-10:
)Diesel Generator Preventive W.R. #2128 M.O. Valve Corrective W.R. /11061
- 2-0202-.5A
!A.O. Valve Preventive W.R. #2296 2-160.1'-;22 i
2_!_1501-26A
,Valve Preventive W.R. 111059 l& 26B DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE OCTOBER, 1979_ _
LER OR OUTAGE MALFUNCTION UUMBER CAUSE LER #79-56/03L-0 NA Outage, 112-10 Outage #2-12 NA Outage #2-10 NA Outage 112-10 NA Outage #2-11 I
NA Outage #2-11 NA Outage 112-11 NA LER #79-52/03L-0
- NA Outage #2-10 Outage 112-11 Packing Out of Adjustment Outage #2-11 NA Outage #2-11 NA i
(
RESULT CO~RECTIVE ACTION NA Replaced indicating light socket I
i I
NA Repacked valve e
NA Cleaned out wa'ter &
c;le.aned t?rque,. switch NA*
- rnstalled*new air piston NA Tightened: nut NA Opened hatch NA Tightened' lock nut on hanger rod NA Meggered ~11 control~
wiring foi grounds, cleaned buildup on SBR relay contact, dried out cabinet, & meggered diese l vent fan motor*
Leakage Adjusted packing NA Installed new valve NA Adjusted packing
EQUIPMENT NATURE OF MAINTENANCE Refueling Grap-Preventive W.R. #2485
- ple
- Torus Vent Preventive W.R. #2208
- Valve 2-1601-6(1
- Hange
- r i : Standby Liquid Control
? Hanger Preventive W.R. #2498 Preventive* w. R. 1124 72 Preventive W.R. #2520 Core Spray Pipe Prevent! ve W.. R. 112519 Support Valve 2~1402-6A & 6B MO Valve 2-0202 SB
- Valve.
Pressure Sup-pression Lin,e 1605 Drywell Equip-ment' :Hatch Preventive W.R. 111060 Corrective W.R. 111062 Corrective W.R. 111063 Preventive W;R. 112304 Preventive W.R. #1901 "A" LPCI Heat Preventive W.R. 112432 Exchanger Outlet DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE-OCTOBER, 1979 MALFUNCTION LER OR OUTAGE UUMBER CAUSE RESULT Outage 112-12 LER ll79-55/03L-0 Outage 112-10 Outage 112-12 Outage 112-12
. ! I Outage l/2-121 LER ll79-59/03L-0 Outage 112-12 Outage 112-12 oi:itage 112-12 Outage 112-12 Outage 1/2-11 Outage.112-11 Outage 112-11 NA NA NA
- NA NA NA NA Packing Out of Adj us'tmen t Bad Gasket NA NA NA NA NA NA NA.
NA NA*
NA Leakage Leakage NA NA NA I
j
- ---i---
CORRECTIVE ACTION Repaired cable & installed newmicroJwitch.
i I
Installedinewsolenoid
- i valve e.;
Se.t hange~ & tightened lock nut.i I '
Tightenedihang~r rod r*. i I
Welded rod to ring,*in-stalled rod & tighte.i:°ied, *.,'
I
& cut handrail Tightened!packing Adjusted packing I.
j Replaced ~askets & tighti*
ened piloq flange Adjusted rods, added lock nuts, & tightened clamp nµts Closed ha~ch Tightened packing
EQUIPMENT i Target Rock Re-
' lief Valve NATURE OF MAINTENANCE Preventive W.R. #2333 Drywell Recircu~ Preventive W.R. #2473 I
4 lating Piping I
- MSIV Pilot
! Sol!i!noid Assem-
- bly. 2-203-2B Feedwater Line 3204A Reactor Feed-water Hanger 3201-1411 Preventive W.R. #2495 Preventive W.R~ #2447 Preventive W.R. #2481
. Main St~am Line Preventive W.R. 112444 3001B
! Main Steam Line l 3001B & C HPCI Hanger 2305-M-234 Preventive* W.),l. 112471 Preventive W.R. 112500
- HPCI Kangers Preventive W.R. 112499
- 2105-\\.'1106 & THO Pressure Sup-press ion Line
.2-1605 Preventive W.R. 112204 FeedJater Inter Preventive W.R. 1110526 lock t~ RadwastE Monitor i
I I
DRESDEN UN IT 2
-~ ---- __ *_ *- ---**--- -!- -- -
SAFETY RELATED MAINTENANCE OCTOBER, 1979 LER OR OUTAGE UUMBER
. Outage #2..., 11 Outage 112-12 Outage 112-12 Outage #2..:.11
~ I I
Outage 112-11 Outage /12-11 Outage 112:....12 Outage #2-12 Outage //2-11 LER #79-54/03L-0 Outage //2-10 Outage /12-11 MALFUNCTION CAUSE RESULT NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA I
CORRECTIVE ACTION I
Installedjblanket ins~lp-tion i
Straightened rod & pus.i,.a.ck in place ;
i Installed,new solenoid valve ass~mbli~s i
' i Bracened out weld tacks Welded washers to plate Replaced qut. & tightened:
I I
Replaced ~issing nut tightened!lock nuts
. i
. j Tightenediloose bolts I
I Tightened :spring tension Tightened lower clamp bolt
&. turnbuckle lock nut.
Cut rod & tightened hanger.
Calibrated top & bottom dials
DRESDEN UNIT 2
- i.
SAFETY RELATED MAINTENANCE - OCTOBER, 1979 MALFUNCTION NATURE OF LER OR OUTAGE EQUIPMENT MAINTENANCE UUMBER CAUSE RESULT CORRECTIV~ ACTION LPCI Line Hanger Preventive W.R. 112136 Outage 112-10 NA NA Replaced missing bolt on 1504-M-209 hanger I.
I HPCI Steam Sue-Preventive W.R. 112429 Outage 112-11
~A NA Replaced ~elding rod with ti on Support cotter pin e
HPCI Steam Sue-Preventive W.R. 112430 Outage 112-11 t-JA NA Replaced weldfog rod with tion Support cotter pin 2-2305-W-105 HPCI Pump Dis-*
Preventive W.R*. 112262 Outage 112-1°1 NA NA Replaced clamp bolt &
charge Line
'1 tightened loose nuts I
2-2304-M-22L1 Diesel Generator Preventive W.R. 112082 Outage 112-11 NA NA Performed: quarterly. in-spection Snubbers Preventive W.R. 11235 3 Outage 112-11 NA NA Filled sn\\lbb.ers with oil l
Recirc. Loop Dow1 Preventive W.R. 112431 Outage /12-11 NA NA Installed nuts &
Comer Support tightened; e
1122
/12351 Replaced. bottom SRM Preventive W.R.
Outage /12-11 N~
NA half of
(
switch assembly
' RPS MG Set Relayi Preventive W.R.. 112282 Outage /12-11 NA NA Blocked r7lays
- 24/4RV Battery Preventive W.R. 112123 Outage 112-11 NA NA Checked & adjusted floats Chargers RPS Relays Preventive W.R. 112283 Outage 112-11 NA NA Renioved blocks from re-lays Diesel*Generator Preventive W.R. 112099 Outage 112-11 NA NA Cleaned strainer & in-Cooling ;1.Ja ter spected bearing
.Pump
... --............ -r""*-~*-.** *..........,.~
I I
EQUIPMENT I
NATURE OF MAINTENANCE DRESDEN UN IT 3 SAFETY RELATED MANTENANC~ - OC'rOBER, 1979. *.
LER OR OUTAGE NUMBER MALFUNCTION CAUSE RESULT
- -S-RM-...;/1_2,;_l_H_i--H-i-.l--1'-r-e-ve.;..n_.*t-i_v_e.._W_.-R-. -/11_7_0_2_.J--.-L-ER_/,_17_9_...:._2_4_/_0_3L---. 0-.--+---;;.;...;NA-...;;...---t----N-A----+-I-n-s t_a_l_l_e_d_s_p_a-re-, _p_u_l_s_e-.--,.;
- Alarm Outage fl3-7
- height discriminator CORRECTIVE ACTION
' 'Diesel Generato~ Preyentive W.R. #1644
- 125V DC Grourid o*n Interlock Doors CCSW-3C Pump,
- Suctiop Or~in Line
.CR)) Accuinul,ator
- 02-31
- "A" Fuel Pool ARM C9rrective.W.R. 112231 Pr~vent'iv~ W;R.. 112355 Preventive W.R. 1122)6 Prev~ntive W.R. #21/n LPCI Heat Ex-Preventive w:. R. 112097 changer* 3.-1501-3A & B
!IRM 1117-KlO Re-Preve~tive W~R. #2202 lay LPCI Drywell Preventive W.R. 112230 Spray Line LPRM Meter Dis-Preventive W.R. 112076 play Air Ejector Preventive W.R. 111999 Suction Valve.
' i O~t:ag~*/13-6
<;:>utage l/'3-7.
Ou tag~ 113-7*
Outage 113-.7
<)utage 113-7 Outage 113-7
- Outage 113-7 I
. i LER 1179-28/031 Outage.113-'7 Out;;ige.#3:7 LER /179-26/03L.
Outage 113-7 NA Pinched.Wire*
NA NA"..
NA NA
,NA. *.
NA
~
NA, NA NA
.'.*.Ground NA'
'NA
. NA**
I NA N:A
. NA NA
- 1,
"1 Perf~rmed qu~t~erly ins~~t tion
- i Insulate~: & moved wl~e 1
I i ~
Threaded nipple deeper suction 1 ine Replaced accumula,tor A
- i
':j in~r :.
- c Adj~sted cali~ra~ion
- l
.1
~.
- J Replaced pot* & set. Sl~d. i at minimum po*sition
- t
'.... : l
- '.)
~~
I
- 1 Replaced r~lay
.i
- ~
'i Replaced bent.studs &
checked hanger tensions
- ~ '
.'1. :~
R~placed.diodes
. ~*.. *,...
- . 7*
Replaced solenoid val~~
- .~...:.._
--r*
?:
.. "I*
I DRESDEN UNIT 3 SAFETY RE~ATED MANTENANCf: - OCTOBER, 1979 NATURE OF LER OR OUTAGE MALFUNCTION i
EQUIPMEtH MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Radwaste Monitor Preventive W.R. 1114 84 Outage 113..- 7 NA NA Repl;lced delay' line
~~ J HPCI Pump Dis-Preventive W.R. 111931 Outage 113-7 NA NA Installed bolt charge Piptng
'. ~
HPCI Pump Dis-Preventive W.R. 111929 -
Outage 113-7 NA NA Installed bolt e
charge Piping I
HPCI Pump Dis-Preventive W.R. 111930 Outage 113-7 NA NA Replaced bolt on pipe
>j charge Piping clamp i
I
<~
I
- ~
/
- i
- j i
e i
~ -..
~
i
~
~
\\
\\
i
EQUIPMENT
. Sn1,1bber NATURE OF MAINTENANCE Preventive W.R. #2024 I j "A" Standby Gas Preventive W.R. 112185
! Treatment Sy1:3tern
- Snubber.
18 11 Butterfly Valve Prev~ntive W.R. 112183 Preventive w~R. /12203
- Spare Accumulato Preventive W.R. 112343
- 112607
- Reactor Bldg.
j Crane Preventive W.R. /16964 DRESDEN UNIT 2/3 I
i SAFETY RELATEb MAINTENANCE - OCTOBER, 1979 MALFUNCTION LER OR OUTAGE IWMBER CAUSE RESULT NA NA LER /179-53/03L-0 NA NA NA NA NA NA NA NA NA NA CORRECTIVE ACTION j
Rebuilt ~nubber I
Reset flow switch Scrapped snubber i
Leak tested valve Overhauled accumulator Adjusted,load sensing de-vice & removed jump~rs I
e I
I
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE OCTOBER, 1979 10-1 to 10-31 Unit Orie was shutdown for entire month, continuing preparation for chemical cleaning and refueling.
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO.
10-1 to 10-13 OCTOBER, 1979 Unit Two started the month oper-ating at an average power level of 709 MWe.
On October 13, at 0440, Unit Two was taken off line for a hanger and anchor bolt in-spection per I.E.Bulletins 79-14 and 79-02, respectively.
10-20 to 10-21 The Unit was placed on the line at 1952 on October 20 but scrammed on moisture separation drain tank high level at 2210.
10-21 to 10-31 The Unit was again placed on the line at 1648 on October 21 and operated the remainder of the month at an average power level of 653 MWe, with a capacity factor of 66.2% for the entire month.
- 1.*
SUMMARY
OF OPERATING EXPERIENCE UNIT THREE 10-1 to 10-25 OCTOBER, 1979 Unit Three started the month operating at an average power level of 520 MWe.
On October 25 at 2347, the inadvertent jarring of a relay cabinet by a shift foreman during inspection re-sulted in a ESS MG set AC and DC feed trip and subsequent reactor scram.
10-26 to 10-31 The Unit was placed on the sys-tem at 1302 and operated contin-uously for the remainder of the month at an average load of 421 MWe with a capacity factor of 62.8% for. the entire month.
The Unit is limited to 550 MWe for investigation of high off-gas activity.