Forwards Insp Repts 50-387/97-03 & 50-388/97-03 on 970408-0519 & Nov.Shift Supervisor Made Conservative & Technically Correct Decisions When Faced W/Conflicting Procedural Emergency Plan Guidance
ML17158C188
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/23/1997
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Byram R
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17158C189 List:
References
50-387-97-03, 50-387-97-3, 50-388-97-03, 50-388-97-3, NUDOCS 9706300230
Download: ML17158C188 (7)


See also: IR 05000387/1997003

Text

r

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSiON NBR:9706300230

DOC.DATE: 97/06/23

NOTARIZED:

NO

DOCKET ¹

FACIL:50-387 Susquehanna

Steam Electric Station, Unit 1, Pennsylva

05000387

50-388

Susquehanna

Steam Electric Station, Unit 2, Pennsylva

05000388

ArJTH NAME

AUTHOR AFFILIATION

KEIMIG,R.R.

Region

1 (Post

820201)

RECIP.NAME

'ECIPIENT AFFILIATION

BYRAM,R.G.

Pennsylvania

Power

& Light Co.

SUBJEC.:

Forwards insp repts

50-387/97-03

& 50-388/97-03

on

970408-0519

& NOV.Shift Supervisor

made conservative

&

technically correct decisions

when faced, w/conflicting

procedural

emergency

plan guidance.

DISTRIBUTION CODE:

IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

05000387

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

LE CE TER

RR"

R

HH

NRR/DRPM/PERB

OE DIR

RGN1

FILE

01

EXTERNAL: LITCO BRYCE,J

H

NRC PDR

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNYiC

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

NUDOCS FULLTEXT

COPIES

LTTR ENCL

1

.1

1

1

1

1

1

1

1

1

1

1

1

1

1

'1

1

1

0

D

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

21

ENCL

21

June

23,

1997

P~O

Mr. Robert G. Byram

Senior Vice President - Nuclear

Pennsylvania

Power 5 Light Company

2 North Ninth Street

Allentown, Pennsylvania

18101

SUBJECT:

NRC INSPECTION REPORT 50-387/97-03, 50-388/97-03 AND

NOTICE OF VIOLATION

Dear Mr. Byram:

On May 19, 1997, the NRC completed

an inspection at the Susquehanna

Steam Electric

Station (SSES) facility. The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection, the conduct of activities at the SSES

facility was characterized

by safe operation and conservative

decision making.

In one

instance,

a Shift Supervisor made conservative

and technically correct decisions when

faced with conflicting procedural emergency

plan guidance.

We noted that operations

department management

involvement in this later issue was aggressive,

conservative,

and

considered

a strength.

Efforts by your staff to investigate and resolve issues with 4kV

breaker trip mechanisms,

a main steam isolation valve component problem, and a spent

fuel pool foreign material issue were also considered

strengths.

However, based on the results of this inspection the NRC has also determined that three

violations of NRC requirements

occurred.

The violations concern:

(1) two examples of

inadequate

procedural guidance;

(2) the failure of operators to properly perform an as-

found test of the core spray system; and (3) four examples of failure to perform a safety

evaluation prior to a design change.

These violations are cited in the enclosed

Notice of

Violation (Notice), and the circumstances

surrounding the violations are described

in detail

in the enclosed report.

Please note that you are required to respond to this letter and

should follow the instructions specified in the enclosed

Notice when preparing your re-

sponse.

The NRC will use your response,

in part, to determine whether further

enforcement action is necessary to ensure compliance with regulatory requirements.

Also of concern during this period were two separate

maintenance

related activities that

could have resulted in serious personnel

injury. One activity was identified by the Resident

Inspector and the other activity revealed itself when a load was dropped from a hoist.

Even though there were no violations of NRC requirements,

each of these activities could

have had significant consequences

and are further examples of the concern expressed

in

the previous NRC resident inspection report.

It was noted that Susquehanna

plant

management

responded

well to each activity from a corrective action and investigation

standpoint.

gyral

'F706300230

'F70623

PDR

ADOCK 05000387

8

PDR

llllll!Itjllcal!

Ili!l~ll~

Mr. Robert G. Byram

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures

will be placed in the NRC Public Document Room.

The responses

directed by this letter and the enclosed

Notice are not subject to the clearance procedures

of the Office of Management

and Budget as required by the Paperwork Reduction Act of

1980, Public Law No. 96.511.

Sincerely,

ORIGINAL SIGNED

BY

Richard R. Keimig, Chief

Reactor Projects Branch No. 4

Division of Reactor Projects

Docket Nos.:

50-387;50-388

License Nos:

NPF-14, NPF-22

Enclosures:

1. Inspection Report 50-387/97-03, 50-388/97-03

2. Notice of Violation

Mr. Robert G. Byram

cc w/encl:

G. T. Jones, Vice President - Nuclear Operations

G. Kuczynski, Plant Manager

J. M. Kenny, Supervisor,

Nuclear Licensing

G. D. Miller, Manager - Nuclear Engineering

R. R. Wehry, Nuclear Licensing

M. M.,Urioste, Nuclear Services Manager, General Electric

C. D. Lopes, Manager - Nuclear Security

W. Burchill, Manager, Nuclear Safety Assessment

H. D. Woodeshick, Special Office of the President

J. C. Tilton, III,'Allegheny Electric Cooperative,

Inc.

Commonwealth of Pennsylvania

Mr. Robert G. Byram

Distribution w/encl:

Region

I Docket Room (with concurrences)

Nuclear Safety information Center (NSIC).

W. Axelson, DRA (IRs)

K. Gallagher,

DRP

D, Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

W. Dean, OEDO

C. Poslusny,

Project Manager,

NRR

J. Stolz, PDI-2, NRR

'Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

F. Talbot, NRR

DOCDESK

DOCUMENT NAME: g:hbranch4$ 9703rev.sus

To receive a copy of this document, Indicate in the box:

C

Copy without attachment/enclosure

E

~ Copy with attachment/enclosure

N

~ No copy

OFFICE

NAME

DATE

RI/DRP

RKeimig

6Q/97

RI/DRS

G Meyer

ection

M3.1)

6/Zo/97 '

FICIAL RECORD COP

r 8/