Text
PRIORIT'Y 2
tl
REGULATOR'5"CNRCRRKC@AMMhROTION SYSTEM (RIDS)
ACCESSION NBR:9509060242
DOC.DATE: 95/08/29
NOTARIZED: NO
DOCKET
ACIL:50-387 Susquehanna
Steam Electric Station, Unit 1, Pennsylva '5000387
50-388
Susquehanna
Steam Electric Station, Unit 2, Pennsylva
05000388
AUTH.NAME
AUTHOR AFFILIATION
ANDERSON,C.J.
Region
1 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
BYRAM,R.G.
Power
6 Light Co.
SUBJECT:
Forwards insp repts
50-387/95-17
& 50-388/95-17
on
950705.Violations
noted. Violations of concern
because
decision
made
by higher level personnel.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
05000387
RECIPIENT
ID CODE/NAME
PD1-2
INTERNAL: ACRS
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR'/DRCH/HHFB
OE DIR
RGN1
FILE
Ol
EXTERNAL: LITCO BRYCEiJ
H
NRC PDR
NOTES:
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNYiC
AEOD/DEIB*
FILE CENTER
0 AB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:.
PLEASE HELP US TO REDUCE WASTE! COiNTACTTHE DOCUMENTCONTROL
DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROII
DISTRIBI.;TIONLISTS FOR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
August 29,
1995
Nr. Robert
G.
Byram
Senior Vice President
Nuclear
Power
& Light Company
2 North Ninth Street
Allentown, Pennsylvania
18101
SUBJECT:
NRC COMBINED INSPECTION
REPORT
NOS. 50-387/95-17;
50-388/95-17
Dear Nr. Byram:
The enclosed
report documents
a resident
inspection
conducted
by Ns.
N.
Banerjee,
Nr. B. J.
NcDermott,
and others
from July 5,
1995 through
August 5,
1995, at the Susquehanna
Steam Electric Station
(SSES),
Salem
Township,
Areas relevant to the health
and safety of the public
examined during the inspection
are described
in the enclosed report.
At the
c'onclusion of the inspection,
the inspectors
summarized their preliminary
findings with Nr. H.
G. Stanley
and other members of your staff.
Throughout the inspection period, the plant was operated
in a safe manner.
Good emphasis
was provided
on timely correction of the Emergency
Plan tele-
notification system deficiencies identified during
a call-out drill.
You
stated that you plan to perform
a tele-notification system call-out with
physical
manning of the response facilities in the near futur e to further
demonstrate
your ability to respond during off-hour emergency situations.
Based
on the results of the inspection,
one of your activities appeared
to be
in violation of NRC requirements.
Specifically, it involved
a management
decision not to enter
a plant technical specification required action while
performing emergency diesel
generator
surveillance testing during the last
Unit
1 refueling outage.
The violation was identified by you, is of small
safety significance,
and
was reported to the
NRC as required.
However, the
violation is of concern to us because
the decision
was
made
by a higher level
management
personnel,
and you had previously identified,
as reflected in a
previous
Licensee
Event Report, the need to enter the particular technical
specification required action during the subject testing.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions taken
and any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether future
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter
and its enclosures will be placed in the
NRC Public Document
Room.
'3j'509060242 950829
ADQCK 05000387
8
'
~
~
Hr. Robert
G.
Byr am
2
The responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of management
and Budget
as required
by the Paperwork Reduction Act of 1980, Public law No. 96.511.
Your cooperation with us in this matter is appreciated.
Sincerely,
ORIGINAL SIGNED BY:
Clifford J. Anderson,
Chief
Reactor Projects
Section
2B
Division of Reactor Projects
Docket Nos.
50-387;50-388
Enclosures:
1.
2.
Combined
NRC Inspection
Report 50-387/95-17;
50-388/95-17
cc w/encls:
H.
G. Stanley,
Vice President
Nuclear Operations
J.
H. Kenny, Nuclear Licensing
G. T. Jones,
Vice President
Nuclear Engineering
N.
N. Urioste, Nuclear Services
Hanager,
C.
D. Lopes,
Nanager - Nuclear Security
W. Burchill, Nanager,
Assessment
Services
H. D. Moodeshick,
Special
Office of the President
R. Mehry, Nuclear Licensing
J.
C. Tilton, III, Allegheny Electric Cooperative,
Inc.
Nuclear Safety Information Center
(NSIC)
Commonwealth of Pennsylvania
Nr . Robert
G.
Byram
Distribution w/encls:
Region I Docket
Room (with concurrences)
K. Gallagher,
D. Screnci,
PAO (2)
NRC Resident
Inspector
PUBLIC
Distribution w/encls:
(Via E-Nail)
W. Dean,
OEDO
C. Poslusny,
Project Nanager,
J. Stolz,
PDI-2,
Inspection
Program Branch,
NRR (IPAS)
DOCUNENT NANE:
A:9517.SUS
To receive s copy of this document, Indlcste In the box:
C
~ Copy without sttschment/enclosure
"E
~ Copy with sttschment/enclosure
N
~ No copy
OFFICE
NAKE
DATE
RI/DRP
NBanerjee
meo
8/29/95
RI/D
P
NBlu
rg
RI/DRP
CAnd
son
S
OF ICIAL RECORD
CO