~g8 REoy
~+
0 jP j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 9,
1990 Docket Nos. 50-387/388 Mr. Harold W. Keiser Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsy 1 vani a 18101
Dear Mr. Keiser:
SUBJECT:
REVIEW OF 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUALPLANT EXAMINATIONS (IPE)
(TAC NOS. 74478/74479)
RE:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder:
(1) identify the approach and method selected for performing the IPE, (2) describe the method to be used, and (3) identify the schedule for performing the IPE and submitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of Supplement 1 of the generic letter.
We have reviewed your letter dated October 26, 1989, submitted in response to the reporting requirements of the generic letter.
We conclude that your IPE approach and schedule are acceptable.
The staff currently is reviewing your proposed evaluation
- method, since you have classified it as an "other systematic evaluation method."
We will complete our review and inform you of our results as soon as possible.
We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement
- Program, will not have any adverse effect on your schedule.
However, if your schedule should
- change, please notify the NRC of the proposed
'change and the reason for
'he change.
900ii20049 900i09 DR ADOCK 05000387 PDC 0
Mr. Harold W. Keiser
~ennsylvania Power
& Light Company Susquehanna Steam flectric Station Units 1
& 2 CC:
Jay Silberg, fsq.
Shaw, Pittman, Potts
& Trowbridge
~
7 300.N Street N.W.
ashington, O.C.
20037 Bryan A. Snapo, Esq.
Assistant Corporate Counsel Pennsvlvania Power
& Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Nr. J.
N. Kenny Licensing Group Supervisor Pennsylvania Power
& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Nr. Scott Barber Senior Resident Inspector U. S. Nuclear Regulatory Commission P,O.
Box 35 Berwick, Pennsylvania 18603-0035 Mr e Thomas M. Gerusky, Director Bureau of Radiation Protection Resources Commonwealth of Pennsylvania P. 0.
Box 2063 Harr isbur g, Pennsylvania 17120 Nr.
lesse C. Tilton, III Allegheny Flee.
Cooperative, Inc.
212 Locust Street P.O.
Box 1266 Harrisburg, Pennsylvania 1?108-1266 Nr. S.
R. Ungerer Joint Generation Prjects
)apartment At antic ectric P.O.
Box 1500 1199 Black Horse Pike Pleasantville, Ncw Jersey 08232 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King nf Prussia, Pennsylvania 19406 Nr.
R.
G. Byram Superintendent of Plant Susquehanna Steam Electric Station Pennsylvania Power and Light Company 2 North Ninth Street Al 1 entown, Pennsyl vani a 18101 Mr. Herbert D. Woodeshick Special Office of the President Pennsylvania Power and Light Companv 1009 Fowles Avenue Berwick, Pennsylvania 18603
E Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Hoyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
S incere ly, cc:
See next page
/S/
Mohan C. Thadani, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
, DISTRIBUTION:
10~
NO'B i PDI-2 Reading EJordan MThadani/JStone NRC PDR/LPDR ACRS (10)
M. Boyle OGC SVarga/BBoger WButler BGrimes J. Flack fHWK1
/90 P I-2/PM HTha ani:tr
/ I leo PD I-2/D WButler i/ /o
4 e
- r. 1