ML17156B357

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-387/89-26 on 890807-08 & Notice of Violation.Insp Conducted to Determine Events & Reasons That That Led to Starting Up Plant W/Potentially Unacceptable Ultrasonic Indications in Reactor Vessel
ML17156B357
Person / Time
Site: Susquehanna 
Issue date: 09/15/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17156B358 List:
References
NUDOCS 8909260109
Download: ML17156B357 (3)


See also: IR 05000387/1989026

Text

gc CP~RA,TED

DlSTKBU'EON

DEMONSTRA,TION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8909260109

DOC.DATE: 89/09/15

NOTARIZED: NO

DOCKET

ACIL:50-387 Susquehanna

Steam 'Electric Station, Unit 1, Pennsylva

05000387

AUTH.NAME

AUTHOR AFFILIATION

DURR,J.P.

Region 1, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

KEISER,H.H.

Pennsylvania

Power

& Light Co.

SUBJECT:

Forwards Insp Rept 50-387/89-26

on 890807-08

& notice of

violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR

ENCL Q

SIZE: kk

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation Response

E

NOTES:LPDR

1

cy Transcripts.

C

05000387

RECIPIENT

ID CODE/NAME

PD1-2

PD

INTERNAL: ACRS

AEOD/DEIIB

DEDRO

NRR/DEST DIR

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

EXTERNAL: LPDR,

NSIC

NOTES:

COPIES

LTTR ENCL

1

1

2

2

1

1

.1

1

1

1

1

1

2

-2

1

1

1

1

1

1

1

1

1

1

2

2

RECIPIENT

ID CODE/NAME

THADANI,M

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DLPQ/PEB

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

REG FI E

02

RGB

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1,

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

"I

D

p \\

NCrK 'IO AIL 'RIDS

RECIPIENIS:

&

PLEASE HELP US XO REDUCE RASTE! ~V~~ DQCECEÃZ CGHIBDL DESK

BOCH Pl-37

(EZI'. 20079), XO ELMER YOUR NAME FKN DISTRIHUTX~

LTBT8 FOR DOaHHKS YOU mmmm mmnt

TOTAL NUMBER OF COPIES

REQUIRED:

ETTR

27t

ENCL

27

SEP 15

]989

Docket Nos.

50-387

"

50-388

Pennsylvania

Power

8 Light Company

ATTN:

Mr. Harold

W. Keiser

Senior Vice President

Nuclear

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

Report

No. 50-387/89-26

This letter refers to the announced

inspection

conducted

by Mr. H. J.

Kaplan

and Mr.

M. Oliveri of this office on August 7-8,

1989 at the Susquehanna

Steam

Electric Station Unit

1 in Berwick, Pennsylvania.

Messrs.

Kaplan

and Oliveri

discussed

the findings of the inspection with Mr. Blakeslee of your staff at

the conclusion of the inspection.

4

The areas

examined during this inspection

are described

in the

NRC Region I

Inspection

Report which is enclosed with this letter.

The objective of the

inspection

was to determine

the events

and the reasons

that led to starting

up

the plant with potentially unacceptable

ultrasonic indications in the reactor

vessel.

The inspectors

determined*that

the problem occurred

because

of

inadequate

procedural

controls, within both your organization

and your inspec-

tion contractor's

organization that resulted in poor communication

between

these parties.

It should

be noted that in assessing

this issue

the

NRC

recognized that subsequent

to restart of the plant your. organization

recognized

the potential

problem and.immediately initiated actions to properly disposition

the reactor vessel

indications.

Your efforts in,this regard

are

commended.

Nonetheless,

restarting

the plant without thorough evaluation of the pressure

vessel

inservice inspection results

represents

a serious deficiency in your

inservice inspection

program

and

we are issuing the violation enclosed

herewith

as Appendix A.

This violation has

been categorized

by Severity Level in

accordance

with the "General

Statement

of Policy and Procedure

for

NRC

~

Enforcement Actions,"

10 CFR Part 2, Appendix

C (Enforcement Policy).

Your are required to respond to this letter

and in preparing your response

you should follow the instructions

in Appendix A.

4> VQCj2~4

ADOf f

g)c""0~

Fi ii

OFFICIAL RECORD

COPY

IR SUS 89-26

0001.0.0

09/13/89

SEP

1 5 l98S

Pennsylvania

Power

& Light Company

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

CliffordJ. AndeTson

Jacque

P. Durr, Chief

Engineering

Branch

Division of Reactor Safety

Enclosures:

l.

Appendix A, Notice of Yiolation

2.

NRC Region I Inspection

Report

No. 50-387/89-26

cc w/encls:

A.

R. Sabol,

Manager,

Nuclear (}uality Assurance

E. A. Heckman,

Licensing Group Supervisor

R.

G.

Bryam, Superintendent

of Plant-SSES

S.

B. Ungerer,

Manager, Joint Generation

Projects

Department

J.

D. Decker,

Nuclear Services

Manager,

General Electric Co.

B. A. Snapp,

Esquire, Assistant

Corporate

Counsel

H.

D. Woodeshick,

Special Office of the President

J.

C. Tilton, III, Allegheny Electric Cooperative,

Inc.

Public Document

Room (PDR)

Local Public Document

Room (LPDR)

Nuclear Safety Information Center

(NSIC)

NRC Resident

Inspector

Commonwealth of Pennsylvania

bcc w/encls:

Region I Docket

Room (with concurrences)

Management Assistant,

DRMA (w/o encl)

R. Blough,

DRP

J.

Lyash,

DRP

PAO 10 (SALP) Reports

Only

J. Wiggins,

DRP

M. Kohl,

DRP

M. Thadani,

NRR

J. Dyer,

EDO

C.

Y. Cheng,

NRR

RI; DRS

Kaplan/gcb/rw

09//EI/89

RI:DRS

cia

RI~DRS

Strosnider

Durr

09/t I /89

09/(5 /89

OFFICIAL RECORD

COPY

IR SUS 89-26

0002.0.0

09/08/89