MONTHYEARIR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 ML23312A1922024-01-18018 January 2024 Issuance of Amendment Nos. 316 & 316 Regarding a Risk Informed Approach for Tornado Classification of the Fuel Handling Trolley Support Structure ML24003A9022024-01-0303 January 2024 Stations, Units 1 and 2, Emergency Plan Revision - Relocation of the Technical Support Center (TSC) - Editorial Correction IR 05000280/20233012023-12-28028 December 2023 NRC Operator License Examination Report 05000280/2023301 and 05000281/2023301 ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23352A3692023-12-18018 December 2023 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change ML23334A2342023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23242A2292023-11-0707 November 2023 Issuance of Amendment Nos. 315 and 315, Regarding Emergency Procedure Relocation of the Technical Support Center ML23200A2622023-11-0202 November 2023 Issuance of Amendment Nos. 314 and 314, Regarding Technical Specification and Spent Fuel Pool Criticality Change IR 05000280/20230032023-10-25025 October 2023 Integrated Inspection Report 05000280/2023003 and 05000281/2023003 ML23286A0372023-10-13013 October 2023 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J ML23285A0922023-10-12012 October 2023 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests ML23277A1172023-10-0303 October 2023 Operator Licensing Examination Approval 05000280/2023301 and 05000281/2023301 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23256A2672023-09-21021 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23244A2352023-09-18018 September 2023 Request to Use a Subsequent Edition of the ASME Code, Section XI ML23230A0012023-09-15015 September 2023 Request to Use a Provision of a Previous Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for Non-Destructive Examinations IR 05000280/20220042023-09-0101 September 2023 Reissue - Surry Power Station - Integrated Inspection Report 05000280/2022004 and 05000281/2022004 ML23244A0142023-08-30030 August 2023 Inservice Inspection Owner'S Activity Report IR 05000280/20230052023-08-23023 August 2023 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2023005 and 05000281/2023005) ML23226A1862023-08-10010 August 2023 Proposed License Amendment Request - Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML23220A1492023-08-0707 August 2023 Independent Spent Fuel Storage Installation - Submittal of Cask Registrations for Spent Fuel Storage ML23220A1482023-08-0707 August 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Response to Request for Additional Information IR 05000280/20230022023-08-0404 August 2023 Integrated Inspection Report 05000280/2023002 and 05000281/2023002 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23198A0322023-07-18018 July 2023 Regulatory Audit Report Regarding Review of License Amendment to Modify Emergency Plan Staff Augmentation Times ML23193A9382023-07-18018 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23173A0602023-07-11011 July 2023 Audit Summary for License Amendment Request Revision of the Emergency Plan to Support Relocation of the Technical Support Center ML23136B1392023-06-29029 June 2023 Issuance of Amendment No. 313 Administrative Changes to Subsequent Renewed Operating Licenses and Technical Specifications ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23152A0432023-06-22022 June 2023 Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23163A2352023-06-12012 June 2023 Request to Use a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, for the SPS Sixth Inservice Inspection (Isi) Intervals and VCSNS Fifth ISI Interval ML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML23167B0072023-05-31031 May 2023 Proposed Emergency Plan Revision - Relocation of the Technical Support Center (TSC) Supplemental Information - LOCA Dose Calculation Summary ML23117A0952023-05-10010 May 2023 Audit Plan License Amendment Request to Support Relocation of the Technical Support Center ML23130A3742023-05-10010 May 2023 Request to Delay NRC Intial Licensing Examination 2024-02-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23187A1122023-07-0606 July 2023 TSC Relocation LAR RAIs ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23068A0242023-03-0808 March 2023 RAI Issuance Fuel Handling Trolley LAR ML23054A2412023-02-23023 February 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry Turbine Building Tornado Reclassification ML23046A1172023-02-0202 February 2023 002 Radiation Safety Baseline Inspection Information Request ML23018A1642023-01-17017 January 2023 Formal Issuance of RAIs for Surry ISI Alternative for SG Welds, 30 Day Calendar Response Period (Email) ML22349A2102022-12-15015 December 2022 Formal 43-day Request for Additional Information Issuance for Surry Turbine Building License Amendment Request ML22339A1582022-11-30030 November 2022 Requalification Inspection Notification Letter ML22258A2202022-09-13013 September 2022 FFD RFI ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22223A1192022-08-14014 August 2022 RP Inspection Document Request Letter Final ML22110A2052022-04-19019 April 2022 Formal Issuance of RAIs for Post LOCA Buffer Change LAR ML22067A1622022-03-0909 March 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22012A0572022-01-11011 January 2022 Issuance of RAIs for Surry Unit 1, Spring 2021 Steam Generator Tube Inspection ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21196A1012021-07-15015 July 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000280/2021011 and 05000281/2021011) and Request for Information (RFI) ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21102A3122021-04-12012 April 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Final RAI for the LOCA AST LAR ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21061A0292021-03-0101 March 2021 2021 Sur - POV Inspection Information Request ML21049A2662021-02-16016 February 2021 NRR E-mail Capture - Surry, Units 1 and 2 - Final RAI Concerning the Leak-Before-Break (LBB) LAR ML21049A2672021-02-11011 February 2021 NRR E-mail Capture - Surry, Units 1 & 2 - Draft RAI for the LBB LAR ML21020A1322021-01-19019 January 2021 NRR E-mail Capture - RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML21020A1332021-01-13013 January 2021 NRR E-mail Capture - Draft RAIs for Surry'S Request for Proposed Alternative S1-I5-ISl-05 and S2-I5-ISl-06 (ML20296A680) ML20315A3972020-11-10010 November 2020 Notification of NRC Supplemental Inspection (95001) and Request for Information - RA ML20156A0652020-06-0404 June 2020 NRR E-mail Capture - Final RAIs for Surry U1 Fall 2019 Sgtir Application ML20136A0102020-05-14014 May 2020 NRR E-mail Capture - Final RAIs Regarding Surry Units 1 & 2 LAR to Adopt 10 CFR 50.69 ML20134J1382020-05-0606 May 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20106E9552020-04-15015 April 2020 Program Inspection RFI ML20029D8382020-02-0505 February 2020 Email from T. Tran, Nmss/Drefs/Elrb; Re., Request for Additional Information - Surry SLRA Environmental Review ML20013C7282020-01-0909 January 2020 NRR E-mail Capture - Final RAI Regarding Surry'S TS One-Time 14-Day AOT RSST Cable Replacement LAR ML20007F7952020-01-0606 January 2020 NRR E-mail Capture - Surry RAI Regarding Its Rx Coolant P-T Limits LAR ML19323E2212019-11-13013 November 2019 NRR E-mail Capture - RAI on the SPS Rtb CT Extension LAR ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19296D8982019-10-23023 October 2019 NRR E-mail Capture - RAI for Surry ISTF-411 LAR to Extend Rx Trip Breakers TS CT to 24 Hours ML19283B6252019-10-0202 October 2019 Questions Related to Interval Visual Inspections in Lieu of External Visual Inspections ML19283B6232019-09-20020 September 2019 NRC Surry Draft RAI-Open Cycle Cooling Water (NRC TRP-20 James Gavula) ML19283B6282019-09-19019 September 2019 SLRA - Draft 3rd Round RAI - Selective Leaching (Trp 33) ML19283B6272019-09-18018 September 2019 SLRA - Clarification Call for 3rd Round RAI - Trp 14 (Buried Piping) ML19253C7532019-08-20020 August 2019 SLRA Transmittal Email Attachment 4D Confirmation Letter - August 20, 2019 ML19231A1532019-08-14014 August 2019 Final Requests for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 4 August 14, 2019. L-2018-RNW-0023/000951 ML19217A3582019-08-0202 August 2019 SLRA RAI Transmittal Email Set 3 with Attachments- 2-August 5, 2019 ML19192A2472019-07-10010 July 2019 Final Disposition List of Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application (L-2018-RNW-0023/000951) ML19184A1392019-07-0101 July 2019 SLRA Email Transmittal of Draft RAIs with Attachments - 29JUN2019 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19164A3332019-06-11011 June 2019 Final Request for Additional Information for the Safety Review of the Surry Power Station, Units 1 and 2 Subsequent License Renewal Application Set 2 June 11, 2019 ML19176A5262019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments June 11, 2019 ML19163A0182019-06-11011 June 2019 Transmittal Email Surry SLRA Draft RAI- 22 May 2019 ML19163A3962019-06-11011 June 2019 SLRA Email Transmittal of Draft RAIs with Attachments - June 11, 2019 2023-07-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 26, 2017 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, VA 23060-6711
SUBJECT:
SURRY POWER STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION
Dear Mr. Stoddard:
The NRC will perform the baseline heat sink (HS) inspection at the Surry Power Station from July 10 - 14, 2017. Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. These documents have been divided into two groups. The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared. The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection at the present time will be Mr. Barry Garber of your organization. Our inspection dates are subject to change based on your updated schedule of activities. If there are any questions about this inspection or the material requested, please contact the lead inspector, Al Butcavage, at (404) 997-4640 (Alexander.Butcavage@nrc.gov).
D. Stoddard 2 This letter and its enclosure will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Shakur A. Walker, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-280, 50-281 License Nos.: DRP-32, DRP 37
Enclosure:
Pre-Inspection Document Request cc: Distribution via Listserv
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE AJB1 SAW4 NAME ABUTCAVAGE SWALKER DATE 5/24/2017 5/26/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO HEAT SINK PERFORMANCE DOCUMENT REQUEST Inspection Dates: July 10 - July 14, 2017 Inspection Procedures: IP 71111.17, Heat Sink Performance Inspectors: Al Butcavage, Reactor Inspector (Lead Inspector)
A. Information Requested for the In-Office Preparation Week The following information should be sent to the Region II office in hard copy or electronic format (preferred), in care of Al Butcavage by June 26, 2017, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The inspector will select specific items from the information requested below and then request from your staff additional documents needed during the onsite inspection week (Section B of this enclosure). We ask that the specific items selected from the lists be available and ready for review on the first day of inspection. *Please provide requested documentation electronically if possible. If requested documents are large and only hard copy formats are available, please inform the inspector, and provide subject documentation during the first day of the onsite inspection. If you have any questions regarding this information request, please call the inspector as soon as possible.
A.1 Heat Exchangers and Service Water Equipment a) List of heat exchangers (HXs) or equipment cooled by service water (SW) directly or indirectly
- Include the risk ranking from the site specific risk assessment for each listed HX
- Detail whether any cleaning or inspection activities are planned during the proposed onsite inspection period for any of the listed HXs
- For HXs directly cooled by SW, provide the testing, inspection, maintenance, and monitoring of biotic fouling and macrofouling program documents b) Detail of the HX performance inspection methods for HXs that are inspected/cleaned c) Response to Generic Letter 89-13 including any regulatory commitments made d) Design Basis documents associated with the SW system e) Design Basis documents associated with the Ultimate Heat Sink (UHS) f) SW system flow diagrams g) Recent Health Reports associated with the SW System and systems that are cooled by SW h) List of SW system related corrective action documents (with a brief description) which have received a Root Cause Analysis or an elevated severity level in the last three years Enclosure
2 i) Recent Operating Experience Events (2014-2017) j) List of applicable Codes and Industry Guidelines k) List of findings in the heat sink/heat exchanger performance area for the last 3 years l) List of redundant or infrequently used HXs m) Chemistry Program for safety-related HXs.
n) Detail whether the UHS is above ground encapsulated by embankments, weirs or excavated side slopes; underwater weir or excavation; or forced draft cooling tower or spray pond o) Provide a list of buried or inaccessible piping and the piping test program, inspection or monitoring program p) List of safety-related and non-safety related valve interfaces q) Most recent self-assessment reports performed on the UHS and SW systems B. Information to be provided on-site to the inspector at the entrance meeting (July 10, 2017):
B.1 Heat Exchangers and Service Water Equipment The inspector will select two to four heat exchangers and/or heat sink samples as required by the inspection procedure during the in-office preparation. The following items will be requested when the selections are made:
a) Updated list of System Engineers b) List of any through-wall leaks including completed or planned corrective actions and structural evaluations c) Provide a copy of the corrective actions and supporting documentation d) For the HXs that have Visual and/or Eddy Current Testing performed, provide a copy of the written procedures used, examination records, examiner qualification records, and associated corrective action documents e) Heat transfer calculations f) Evaluations for the potential of water hammer g) Documentation for controls and operational limits for excessive flow induced vibrations h) Periodic flow test results at/or near maximum design flow
3 i) For an UHS that is encapsulated by embankments, weirs of excavated side slopes provide: (1) third party dam inspection results, and (2) documentation showing that there is sufficient reservoir capacity j) For an UHS that is an underwater weir or excavation provide documentation showing:
- Periodic monitoring and trending of sediment build-up
- Sufficient reservoir capacity
- Considerations for adjacent non-seismic and/or non-safety related structures of possible degradation or blocking of safety-related flow paths due to severe weather or seismic events
- Performance monitoring of heat transfer capabilities
- Performance monitoring of UHS structural integrity
- SW flow balance test results Inspector Contact Information:
Al Butcavage Reactor Inspector 404-997-4640 Alexander.Butcavge@nrc.gov Mailing Address:
US NRC Region 2 Attn: Al Butcavage Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303