ML17146A940
| ML17146A940 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 09/08/1987 |
| From: | Bettenhausen L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Keiser H PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17146A941 | List: |
| References | |
| NUDOCS 8709150005 | |
| Download: ML17146A940 (5) | |
See also: IR 05000387/1987012
Text
- *
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 8709150005
DOC. DATE'7/09/08
NOTARIZED:
NO
FACIL: 50-387 Susquehanna
Steam Electr ic Stationi
Unit ii Pennsglva
50-388 Susquehanna
Steam Electric Stationi
Unit 2>
Pennsglva
UTH. NAME
AUTHOR AFFILIATION
TTENHAUSENi L.
Region ii Office of Director
ECIP. NAME
RECIPIENT AFFILlATION
KEISERi H. W.
Power
h Light Co.
SUBJECT:
Forwards Safety
Insp Repts
50-387/87-12
5 50-388/87-12
on
870701-0815
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR
(
ENCL
i
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Uiolation Response
NOTES: icy NMSS/FCAF/PM.
LPDR 2cgs Transcripts.
icy NMSS/FCAF/PM.
LPDR 2cgs Transcripts.
DOCKET
05000387
05000388
05000387
05000388
RECIPIENT
ID CODE/NAME
PDi-2 PD
RNAL:
LPDR
NOTES:
INTERNAL'CRS
DEDRO
NRR/DOEA DIR
NRR/DREP /RPB
NRR/PMAS/ILRB
OQC/HDS2
DEPY GI
COPIES
LTTR ENCL
1
'1
2
2
1
1
1
1
2
2
1
1
1
1
2
2
1
1
REC IP IENT
ID CODE/NAME
THADANIiM
NRR MORISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
RMANIJ
REG FIL
R'QN
FILE
01
NRC
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
SEP 08 1S87
Docket Nos.
50-387
50-388
Power 4 Light Company
ATTN:
Mr. H.
W. Keiser
Vice President
Nuclear Operations
2 North Ninth Street
Al 1 entown,
Pennsyl vania
18101
Gentl emen:
Subject:
Routine Resident
Inspection
50-387/87-12;
50-388/87-12
Thi s
refers
to
the
routi ne
resident
safety
inspection
conducted
by
Mr. L. Plisco
and Mr. J. Stair of this office on July 1,
1987 - August 15,
1987,
at
the
Susquehanna
Steam Electric Station,
Salem
Township,
The
inspection
consisted
of observation
of activities,
interviews with personnel
and
document
reviews.
The results
of the inspection
are described
in the
NRC
Region I Inspection
Report enclosed with this letter.
During our inspection,
the inspector identified two violations.
One violation
involved
inadequate
corrective
action
for
a 'ocumented
Nonconformance
concerning
loosening
of anti-rotation devices
globe
valves.
The
second violation concerned
an inoperable fire door to
a
4KV switchgear
room
which
was
not
detected
by
the
daily
Technical
Specification
surveillance.
Please
reply to these
matters
in accordance
with Appendix A.
Your cooperation with us is appreciated.
Sincerely,
Origlr.a~ Si~eg ~-
. Bette'nha
sen,
ief
Reactor Projects
Branch
No.
1
Enclosures:
l.
Appendix A, Notice of Viol tion
2.
Combined
NRC Inspection
Report 50-387/87-12;
50-388/87-12
8709150005
870908
ADQCN, 05000387
OFFICIAL RECORD
COPY
IR SUS 87-12
0001.0.0
09/03/87
Power
8 Light Company
cc w/encls:
OII l987
A.
R. Sabol,
Manager,
Nuclear guality Assurance
E. A. Heckman,
Licensing Group Supervisor
R.
G.
Byram, Superintendent
of Plant - SSES
W.
H. Hirst, Manager, Joint Generation
Projects
Department, Alantic Electric
R. J.
Benich, Services
Project Manager,
General Electric Company
B.
D. Kenyon, Senior Vice President - Nuclear
Bryan A. Snapp,
Esquire, Assistant Corporate
Counsel
Herbert
D. Woodeshick,
Special Office of the President
J .
C. Tilton III, Allegheny Electric Cooperative,
Inc.
Public Document
Room (PDR)
Local Public Document
Room (LPDR)
Nuclear Safety Information Center
(NSIC)
NRC Resident
Inspector
Commonwealth of Pennsylvania
bcc w/encls:
Region I Docket
Room (with concurrences)
Management Assistant,
DRMA (w/o encls)
J.
T. Wiggins, Chief, Project Section
1B,
J . Strosnider,
Acting Chief, Engineering
Branch,
RI: DRP
Plisco/mjd
~9/) /87
g ~ RI:DRP
g'iggins
9/
/87
OFFICIAL RECORD
COPY
RI:DRP 8~~~
Bettenhausen
9/$ /87
IR SUS 87-12 - 0002.0.0