Forwards IE Insp Rept 50-387/80-24 on 800908-1010 & Notice of Violation
ML17138B724
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 11/03/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17138B722 List:
References
NUDOCS 8101150850
Download: ML17138B724 (4)


See also: IR 05000387/1980024

Text

9P,S fl6OII~

P0

Cy

O

0

4p

I

n +**++

cket Nos.

50-387

t

UNITED STATES

NUCLEAR REGULATORY COMMISSIO

REGION I

631

PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA I 9406

NOV.

3 1980

Pennsylvania

Power

8 Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

(N-4)

2 North Ninth Street

Allentown, Pa.

18101

Gentlemen:

Subject:

Inspection

No. 50-387/80-24

This refers to the inspection

conducted

by Mr. R.

M. Gallo of this office on

September

8 - October

10,

1980 of activities authorized

by NRC License

No. CPPR-101

at Susquehanna

Steam Electric Station, Unit 1, Salem Township, Pennsylvania

and to

the discussions

of our findings held by Mr. R. Gallo with Mr. H.

W. Keiser at the

conclusion of the inspection.

Areas

examined during this inspection

are described

in the Office of Inspection

and Enforcement Inspection

Report which is enclosed with this letter.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your activities

was not conducted in full compliance with NRC requirements,

as set forth in the

Notice of Violation, enclosed

herewith

as Appendix A.

This item of noncompliance

has

been categorized

into the levels

as described

in our correspondence

to you

dated

December

31,

1974.

This notice is. sent to you pursuant to the provisions of

Section

2.201 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal

Regulations.

Section

2.201 requires

you to submit to this office, within twenty

(20) days of your receipt of this notice,

a written statement

or explanation in

reply including:

(1) corrective steps

which have

been

taken

by you and the results

achieved;

(2) corrective steps

which will be taken to avoid..further';items. of non-

compliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

10,

Code of Federal

Regulations,

a copy of this letter

and the enclosures will be

placed in the NRC's Public Document

Room. If this report contains

any information

8 101150850

cry',

- J>>

0

I

Pennsylvania

Power

8 Light Company

AfOV

S 1880

that you (or your contractor)

believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold such informa-

tion from public disclosure.

Any such application

must. be accompanied

by an affi-

davit executed

by the owner of the information, which identifies the document

or

part sought to be withheld, and which contains

a statement. of reasons

which addresses

with specificity the items which will be considered

by the Commission

as listed in

subparagraph

(b) (4) of Section 2.790.

The information sought to be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we

do not hear from you in this regard within the specified period, the report will be

placed in the Public Document

Room.

Should you have any questions

concerning this. inspection,

we will be pleased

to

discuss

them with you.

Sincerely,

dq

. Brunner, Chief

Rector

Operations

and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection

and Enforcement Inspection

Report Number 50-387/80-24

cc. a/encl s:

A. R. Sabol,

Manager,

Nuclear guality Assurance

W. E. Barberich, Licensing Engineer

H.

W. Keiser, Superintendent

of Plant