ML17138B616
| ML17138B616 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/21/1980 |
| From: | Robert Carlson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| Shared Package | |
| ML17138B614 | List: |
| References | |
| NUDOCS 8012080393 | |
| Download: ML17138B616 (2) | |
See also: IR 05000387/1980019
Text
6PI'6CoC
(
0
p +~
O0
>>**<<
Docket Nos. 50-387.
50-388
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYI VANIA 19406
pug 2i HM
Power
8I Light Company
ATTN:
Mr. Norman
W. Curtis
Vice President
Engineering
and Construction - Nuclear
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Combined Inspection 50-387/80-19
and 50-388/80-13
This refers to the routine inspection
conducted
by Mr. J.
P. Durr of this office
on July 22-25,
1980 at the Susquehanna
Steam Electric Station, Unit Nos.
1 and
2, at Berwick, Pennsylvania of activities authorized
by
NRC License
Nos.
CPPR-
101 and CPPR-102
and to the discussions
of our findings held by Mr. Durr with
Mr. A. R. Sabol of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the Office of Inspection
and Enforcement
Inspection
Report which is enclosed with this letter.
Within
these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with personnel,
measurements
made by the
inspector,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your activities
was not conducted in fu11 compliance with NRC requirements,
as set forth in the
Notice of Violation, enclosed
herewith
as Appendix A.
This item of noncompliance
has
been categorized
into the levels
as described
in our correspondence
to'you
dated
December
31,
1974.
This notice is sent to you pursuant to the provisions
of Section
2,201 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of
Federal
Regulations.
Section
2.201. requires. you to submit to this office,
within thirty. (30) days of your receipt of this notice,
a written statement
or
explanation
in reply'including:
(1) corrective steps
which have
been taken by
you and the results
achieved;
(2) corrective steps
which will be taken to avoid
further items of noncompliance;
and (3) the date
when full compliance will be
achieved.
soIIaoso gpss
Power
& Light. Company
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part 2, Title
10,
Code of Federal
Regulations,
'a copy of this letter and the enclosures will
be placed in'he
NRC's Public Document
Room. If this report contains
any infor-
mation that you (or your contractor)
believe to be proprietary, it is necessary
that you make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
be accompanied
by an affidavit executed
by the owner of the information, which identifies the
document
or. part, sought to be withheld, and which contains
a statement of reasons
which addresses
with specificity the items which will be considered
by the
Commission
as listed in, subparagraph
(b) (4) of Section
2.790.
The information
sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear. from you in this regard within the
specified period, the report will be placed in the Public Document
Room.
Should you have any questions
concerning this inspection;
we will be pleased
to
discuss
them with vou.
Sincerely,
Ro ert T. Carlson,
hief
Reactor
Construction
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection
and 'Enforcement
Inspection
Report
Number 50-387/80-19
and 50-388/80-13
cc w/encl:
A. R. Sabol,
Manager,
Nuclear guality Assurance
W. E. Barberich,
Licensing Engineer
S.
H. Cantone,
Superintendent
of Plant