UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1990 N. CALIFORNIABOULEVARD
SUITE 202, WALNUTCREEK PLAZA
WALNUTCREEK, CALIFORNIA94596
AY I'9 1980
"(~~:tw~
Docket Nos~
=27
50-32
Pacific Gas
and Electric Company
77 Beale Street
San Francisco,
94106
Attention:
ter. Philip A. Crane,
Jr .
Assistant General
Counsel
Gentlemen:
Subject:
NRC Inspection of Diablo Canyon Units
1 and
2
This refers to the inspection
conducted
by Hr.
D. F. Kirsch of this
office on April 29 through Hay 2,
1980 of activities authorized
by NRC
Construction Permit Nos.
CPPR-39
and
CPPR-69,
and to the discussion of
our findings held by Nr. Kirsch with Mr. N.
N.
Nor'em and other
members
of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection report.
Within these areas,
the inspection consisted of
selective
examinations of procedures
and representative
records, inter-
views with personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted
in full compliance with NRC requirements,
as set forth in the Notice of Violations, enclosed
herewith as Appendix A.
This item of noncompliance
has
been categorized
into a level
as described
in our correspondence
to all
NRC licensees
dated
December
31,
1974.
This notice is sent to you pursuant to the provisions of Section 2.201,
of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal
Regulations.
Section
2.201 requires
you to submit to this office,
within thirty (30) days of your receipt of this notice,
a written state-
ment or explanation in reply including (1) corrective steps
which have
been
taken
by you and the results
achieved;
(2) corrective steps
which
will be taken to avoid further violations;
and (3) the date
when full
compliance will be achieved.
~
y
~
II
~
"I
l
Pacific Gas
and Electric Company -2-
MgY 19 1980
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10.
Code of Federal
Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the. NRC's Public Document
Room.
If this report contains
any information that you believe to be
proprietary, it is necessary
that you submit
a written application to
this office, within 30 days of the date of this letter, requesting that
such information be withheld from public disclosure.
The application
must include
a full statement of the reasons
why it is claimed that the
information is proprietary.
The application should
be prepared
so that
any proprietary information identified is contained in an enclosure
to
the application,
since the application without the enclosure will also
be placed in the Public Document
Room. If we do not hear from you in
this regard within the specified period,
the report will be placed in
the Public Document
Room.
Should you have any questions
concerning this inspection,
we will be
glad to discuss
them with you.
Sincerely,
Enclosures:
Q*
@CD~
G.
S.
Spen er, Chief
Reactor Construction
and
Engineering Support Branch
l.
Appendix A - Notice of Yiolation
2.
IE Inspection Report
Nos.
50-275/80-10
50-323/80-06
cc w/o enclosure
2:
W. A. Raymond,
PGSE
J.
D. Worthington,
R.
D.
Ramsay
PGSE (Diablo Canyon)
cc w/enclosures
1
8 2:
R.
D. Etzler,
PGSE (Diablo Canyon)
J.
B. Hoch,
PGSE
0
p1
4
$
,
E
y
c
h IIV.