Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8709110244
.
DOC. DATE: 87/08/25
NOTARIZED:
NO
DOCKET
FACIL: 50-275 Diablo Canyon Nuclear
Power Planti Unit ii Pacific
Ga
05000275
50-323 Diablo Canyon Nuclear
Power Planti Unit 2i PaciFic
Ga
05000323
AUTH. NAME
~
AUTHOR AFFILIATION
ZIMMERMANiR. P.
Region
5i Office of Director
REC IP. NAME
RECIPIENT AFFILIATION
SHIFFERi J. D.
Pacific
Gas
5 Electric
Co.
SUBJECT:
Foi wards
Insp Repts
50-275/87-28
5 50-323/87-28
on 870727-31
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt>-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD5
INTERNAL:
DEDRO
NRR/DOEA DIR
NRR/DREP/RPH
NR R /P MAB/ILR8
OGC/HDS2
DEPY GI
TERNAL:
LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
2
2
1
1
-RECIPIENT
ID CODE/NAME
TRAMMELLED C
NRR MORISBEAUi D
NRR/DREP/EPO
NRR/DRIB DIR
ANi J
RGN5
FILE
01
NRC
COPIES
LTTR ENCL
l
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
23
ENCL
23
Docket Nos.
50-275
and 50-323
Pacific Gas
and Electric Company
77 Beale Street,
Room 1451
San Francisco,
California 94106
Attention:
Mr. J.
D. Shiffer, Vice President
Nuclear
Power Generation
Gentlemen:
SUBJECT:
NRC INSPECTION
OF DIABLO CANYON NUCLEAR POWER
PLANT
This letter refers to the routine inspection,
by Mr. J.
F. Burdoin of this
office on July 27 through July 31,
1987, of activities authorized
by
NRC
License
Nos.
and to the discussion
of our findings held
with Mr. J.
D. Townsend
on July 31, 1987,
and other members of your staff at
the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection report.
Within these
areas,
the inspection consisted of selective
~
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your
response
to this notice is to be submitted in accordance
with the provisions
of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures
will be'placed
in the
NRC Public Document
Room.
The responses
directed
by this letter are not subject to the clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this inspection,
we are willing to
discuss
them with you.
Sincerely,
R
P.
Zimmerman
Chief
eactor Projects
Branch
Enclosures:
A.
Notice of Violation, Appendix
A
B.
Inspection
Report Nos.
50-275/87-28,
50-323/87-28
9709'$ 10244 870~~>~~
ADOCK O~
9
'
'
Qg P5 f'987
/
rdoin
/7.o/87
MMendonca
8/p9 /87
AJoh son
8/g(/87
[
TO
]
YES
N
RPZi
rm
8/~87
cc w/encl'osures:
S.
M. Skidmore,
R.
C. Thornberry,
PG&E (Diablo Canyon)
R.
F.
Locke,
PG&E (Diablo Canyon)
D. Taggart,
PG&E (Diablo Canyon)
R. Weinberg,
PG&E (Diablo Canyon)
T.
L. Grebel,
PG&E (Diablo Canyon)
State of CA
S. Silver (Report only)
bcc w/enclosures:
RSB/Document Control
Desk (RIDS) (IE01)
Project Inspector
Resident
Inspector
G.
Cook
B. Faulkenberry
J. Martin
Docket File
bcc w/o enclosure
B:
LFMB
M. Smith
Region V/norma
E+T COPY ]
EST
COPY ] REQUEST
Y ]
COPY ]
,Y~
%8'
/
NO
YES /
0
ES /
NO
g,le
0 Id g>
Pa+a pov s
g/g~/8
'7
~
'