ML17083B737

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-275/86-12 & 50-323/86-13 on 860407-11.Enforcement Action Re Insp Will Be Subj of Separate Correspondence
ML17083B737
Person / Time
Site: Diablo Canyon  
Issue date: 04/24/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083B738 List:
References
NUDOCS 8605120476
Download: ML17083B737 (2)


See also: IR 05000275/1986012

Text

Aj R 24 }ggt,

Docket Nos. 50-275,

50-323

Pacific Gas

and Electric Company

77 Beale Street,

Room 1451

San Francisco,

California 94106

s'8

Attention:

Mr. J.

D. Shiffer, Vice President

Nuclear Power Generation,

Licensing

Gentlemen:

Subject:

NRC Inspection of Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Messrs.

J. F. Burdoin and

W. P.

Ang

of this office during April 7-11,

1986, of activities authorized by NRC

License Nos.

DPR-80 and DPR-81,

and to the discussion of our findings held by

Mr. Burdoin with Mr. R. Thornberry,

and other members of your staff on

April ll, 1986.

Areas

examined during this inspection are described in the enclosed inspection

report.

Within these

areas,

the inspection cons'isted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your

activities was not conducted in full compliance with NRC requirements.

Enforcement action by the

NRC relating to this inspection will be the subject

of separate

correspondence.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

e>tdtaaf g>>ad

b>

D.

F.

V,'rsch

D. F. Kirsch, Director

Division of Reactor Safety

& Projects

Enclosure:

Inspection Report Nos. 50-275/86-12,

50-323/86-13

cc w/enclosure:

S.

D. Skidmore,

PG&E

R.

C. Thornberry,

PG&E (Diablo Canyon)

PE

A. Crane, Jr.,

PG&E

D. Taggart,

PG&E (Diablo Canyon)

R. Weinberg,

PG&E (Diablo Canyon)

Sandra Silver (Report only)

State of CA

bcc:

RSB/Document Control Desk

(RIDS

J. p]yrpin;

B. Faulkenberry;

Q.

Cook;

Regiment

and Project~nspector

JBCKBoYkdh

WAng Kl'~

RDod~

AC%a'ffee

DKirkhh

4/ w5 /86

4/w'5/86

4/g3/86

4/zg/86

4/g /86

8605120476

860424

PDR

ADOCK 05000275

G

PDR

/

I f

1

~

~

li

~

'1

II f

I

4