ML17083A270

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/79-26 & 50-323/79-13 on 791203-13.No Noncompliance Noted
ML17083A270
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/21/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML17083A271 List:
References
NUDOCS 8003070002
Download: ML17083A270 (4)


See also: IR 05000275/1979026

Text

~p,A REGy~

(4

Op

s

0

o

p+

~>>*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1990 N. CALIFORNIABOULEVARD

SUITE 202, WALNUTCREEK PLAZA

WALNUTCREEK, CALIFORNIA94596

JAt~ al

@g'ocket

Nos.

SO-323

Paci fic Gas

and

El ectri c Company

77 Beale Street

San Francisco,

California

94106

Attention:

fir. Philip A. Crane, Jr.

Assistant

General

Counsel

Gentlemen:

Subject:

NRC Inspection at Diablo Canyon Units

1 and

2

This refers to the inspection

conducted

by Nr.

D. F. Kirsch of'his

office on December 3-13,

1979 of activities authorized

by

NRC Construction

Permit Nos.

CPPR-39

and

CPPR-69,

and to the discussion of our findings

held with Hr.

R.

D. Etzler and other members of your staff at the conclusion

of the inspection.

Areas

examined during this inspection

are described

in the enclosed

inspection report.

llithin these

areas,

the inspection consisted'f

selective

examinations of procedures

and representative

records,

inter views

with personnel,

and.observations

by the inspector.

No items of noncompliance with NRC requirements

were identified within

the scope of this inspection.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

.

Part 2, Title 10,

Code of Federal

Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public Document

Room.

If this report contains

any information that you believe to be

proprietary, it is necessary

that you submit

a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure.

The application

must include a full statement of the reasons

why it is claimed that the

80080~000+

Pacific Gas

and Electric Company

JAN ~y gg)

information is proprietary.

The application should

be prepared

so that

any proprietary information identified is contained in an enclosure

to

the application, since the application without the enclosure will also

be placed in the Public Document

Room. If we do not hear from you in

this regard within the specified period, the report will be placed in

the,Public Document

Ro'om.

Should you have any questions

concerning this inspection,

we wi11 be

glad to discuss

them with you.

Sincerely,

Enclosure:

IE Inspection

Report

~

~

Nos. 50-275/79-26

50-323/79-13

cc w/o enclosure:

W. A. Raymond,

PG&E

E.

B. Langley, Jr.,

PGSE

R.

D. Ramsay,

PGRE (Avila Beach)

cc w/enclosure:

R;

D. Etzler,

PGSE (Diablo Canyon)

.G.

S. Spencer,

Chief

Reactor

Construction

and Engineering

Support

Branch

~

g

~

e