UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 May 12, 1998 LICENSEE: Niagara Mohawk Power Corporation FACILITY:
Nine Mile Point Nuclear Station, Unit No. 1
SUBJECT:
SUMMARY
OF TELEPHONE CONVERSATION OF MAY11, 1998, REGARDING SCHEDULE FOR MODIFICATIONSTO CONTROL ROOM AIR'TREATMENT
'YSTEM (TAC NO. MA1653)
On May 11, 1998, Mr. Steven Leonard of Niagara Mohawk Power Corporation (NMPC or licensee) called me to discuss the schedule for completing modifications to the Control Room Air Treatment System for Nine Mile Point Nuclear Station, Unit No. 1 (NMP1). These modifications, identified in NMPC's application for license amendment dated May 2, 1998, would automatically initiate the Control Room AirTreatment System on either a main steam line break or loss-of-coolant accident signal. The modifications are being made to correct deficiencies that caused the licensee to declare the system inoperable and shut NMP1 down on April28, 1998, until the modifications are completed and the NRC issues the license amendment.
Because the licensee expected to complete the modifications in 1 week, and because power operation cannot resume until the amendment is issued, the licensee requested in the application that the NRC issue the amendment on an emergency basis in accordance with 10 CFR 50.91(a)(5).
During the call, Mr. Leonard explained that since the application for amendment was issued, a project team, consisting of engineers from Sergeant 8 Lundy and NMPC, has completed an independent design review to determine compliance of plant activities (operations, maintenance, testing and engineering) with the Control Room AirTreatment System's design and licensing basis.
The project team identified noncompliances with the system's design and licensing basis, mostly involving the lack of system redundancy and lack of documentation regarding the system's ability to maintain a habitable control room environment after an accident concurrent with a single failure in the system.
Mr. Leonard said that modifications to correct these deficiencies have been added to the scope of work to be completed before the system will be declared operable.
Consequently, the earlier estimate of 7 days has changed and NMPC now estimates that the modifications willbe completed in about 2 to 3 weeks.
9805260079 9805i2 PDR ADQCK 05000220 P
PDR I:
K~Kmme eyV
I
)
Based on the revised schedule, I informed Mr. Leonard that the emergency circumstances discussed in the application for amendment are now considered to be exigent circumstances,,
and that I would proceed immediately to prepare a Federal ~Re inter notice regarding consideration to issue the amendmerit, the proposed no significant hazards consideration
. determination, and the opportunity for hearing, allowing at least 2 weeks from the date of the notice for public comment pursuant to 10 CFR 50.91(a)(6).
Docket No. 50-220 cc: See next page Sincerely, Sw~i~
Darl S. Hood, Senior Project Manager Project Directorate l-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
J
May, 12, 1998 Based on the revised schedule, I informed Mr. Leonard that the emergency circumstances discussed in the application for amendment are now considered to be exigent circumstances, and that i would proceed immediately to prepare a Federal ~Re inter notice regarding consideration to issue the amendment, the proposed no significant hazards consideration determin'ation,'and the opportunity for hearing, allowing at least 2 weeks from the date of the notice for public comment pursuant to 10 CFR 50.91(a)(6).
Docket No. 50-220 cc: See next page DISTRIBUTION:
Docket File PUBLIC PDI-1 R/F J. Zwolinski (A)
S. Bajwa S. Little D. Hood OGC ACRS Sincerely, ORIGINAL SIGNED BY:
.;, Darl S. Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation DOCUMENT NAME: G:>NMP1>NM1A1653.TEL To receive a copy ofthis document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"= No co OFFICE PH:PDI 1
HAHE DHood/Icc DATE 05/ V/98 E
LA:PDI-1 SLICCI 05/
/98 D:PDI-1 SBa Ma 05/
/98 OVA'cial Record Copy 05/
/98 05/.
/98
4 P
~ ~
a 4
May. 12, 1998 t Based on the revised schedule, I informed Mr. Leonard that the emergency circumstances discussed in the application for amendment are now considered to be exigent circumstances, and that i would proceed immediately to prepare a Federal ~Re inter notice regarding consideration to issue the amendment, the proposed no significant hazards consideration determination, and the opportunity for hearing, allowing at least 2 weeks from the date of the notice for public comment pursuant to 10 CFR 50.91(a)(6).
~ Sincerely, ORIGINAL SIGNEO, BY:
'Darl S. Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page DISTRIBUTION:
tmDocke~t"Iji~e-PUBLIC PDI-1 R/F J. Zwolinski (A)'.
Bajwa S. Little D. Hood OGC ACRS a
DOCUMENT NAME: G:iNMP1)NM1A1653.TEL To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"= No co OFFICE PM:PDI-1 E
LA:PDI-1 D:PDI-1 IIANE DHood/Icc SLittle 05/
/98 DATE 05/ V/98 SBa wa 05/
/98 Official Record Copy 05/
/98 05/
/98
C
~
~
tl A
'(
-We
~
~ p
~
Niagara Mohawk Power Corporation CC:
Nine Mile Point Nuclear Station Unit No. 1 Mr. John H. Mueller Chief Nuclear Officer Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Operations Building, Second Floor
'.O.
Box 63 Lycoming, NY 13093 Regional Administrator, Region I
U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza Albany, NY 12223 Mr. F. WilliamValentino, President New York State Energy, Research, and Development Authority Corporate Plaza West 286 Washington Avenue Extension Albany, NY 12203-6399