Forwards Insp Rept 50-410/93-81 on 931129-940128.Violation Noted.Violation Involved Inoperability of HPCS Sys as Discussed in Plant,Unit 2 LER 93-10 & Being Considred for Escalated Action
ML17059A242
Person / Time
Site: Nine Mile Point 
Issue date: 03/22/1994
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sylvia B
NIAGARA MOHAWK POWER CORP.
Shared Package
ML17059A243 List:
References
EA-94-002, EA-94-2, NUDOCS 9403290026
Download: ML17059A242 (8)


See also: IR 05000410/1993081

Text

t

'I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9403290026

DOC.DATE: 94/03/22

NOTARIZED:

NO

DOCKET

ACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara

Moha

05000410

AUTH.NAME

AUTHOR AFFILIATION

IGG NS,J.T.

Region

1 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

SYLVIA,B.R.

Niagara

Mohawk Power Corp.

SUBJECT:

Forwards

insp rept 50-410/93-81

on 931129-940128.Violation

noted. Violation involved inoperability of HPCS sys

as

discussed

in plant, Unit

2

LER 93-10

& being considred

for escalated

action.

DISTRIBUTION CODE: IEOID

COPIES

RECEIVED:LTR

IENCL

I

SIZE: 8 ~ ~ t

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD1-1

PD

INTERNAL: ACRS

AEOD/DSP/ROAB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS1

RES/HFB

EXTERNAL: EG&G/BRYCE,J.H.

NSIC

COPIES

LTTR ENCL

1

l.

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

'

RECIPIENT

ID CODE/NAME

MENNINGiJ

AEOD/DEIB

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFB

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE DIR

ggtE~~P

0 2

RGN1

FILE

01

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEED!

\\

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

MAR 22 SM

Docket No.

50-410

License No. NPF-69

EA No,94-002

Mr. B. Ralph Sylvia

Executive Vice President - Nuclear

Niagara Mohawk Power Corporation

301 Plainfield Road

Syracuse, New York 13212

Dear Mr. Sylvia:

SUBJECT:

NINE MILEPOINT UNIT2 ELECTRICAL DISTRIBUTIONSYSTEM

FUNCTIONALINSPECTION, NRC INSPECTION REPORT NO.

50-410/93-81

This refers to the announced electrical distribution system function inspection (EDSFI)

conducted by Mr. Leonard Cheung of this office from November 29, 1993, through

January 28, 1994.

The inspection included a review of activities authorized for Nine Mile

Point Unit 2. At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

This inspection was directed toward areas important to public health and safety.

The purpose

of this inspection was to determine whether the electrical distribution system as designed,

installed, and configured at Nine Mile Point Unit 2 is capable of performing its intended

safety functions.

In addition, this inspection also included a review of your self-assessment

of the electrical distribution system and a review of your response to the deficient condition

that the high pressure core spray (HPCS) system injection valve failed to open during testing

as reported in Nine MilePoint Unit 2 LER 93-10.

Based on the team's independent review of selected electrical and mechanical design areas,

and maintenance and test areas,

the team determined that your electrical distribution system

is currently capable of performing its intended function.

The team also determined that your

self-assessment

was comprehensive

and of high quality, and that your actions in response to

the deficient condition that the HPCS system injection valve failed to open during testing

were appropriate.

9403290026

940322

PDR

ADOCK 05000410

8

PDR

I

'V

Niagara Mohawk Power

Corporation

Based upon the results of this inspection, one apparent violation was identified, as described

in the enclosed inspection report.

This violation involved the inoperability of the HPCS

system as discussed in Nine Mile Point Unit 2 LER 93-10, and is being considered for

escalated

enforcement action in accordance

with the "General Statement of Policy and

Procedure for NRC Enforcement Actions" (Enforcement Policy), 10 CFR Part 2,

Appendix C. The status of this apparent violation is being evaluated by the NRC.

Accordingly, no Notice of Violation is presently being issued for this inspection finding.

You willbe informed of the NRC's decision in a separate letter.

In addition, three unresolved items were identified, as listed in the Executive Summary of the

inspection report.

We request that you provide to us, in writing, within 60 days of receipt of

this letter, a schedule for the resolution of the three unresolved items.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and

its enclosure willbe placed in the NRC Public Document Room.

Your cooperation with us in this matter is appreciated.

Sincerely,

James T. Wiggins, Deputy Director

Division of Reactor Safety

Enclosure:

Inspection Report No. 50-410/93-81

cc w/encl:

C. Terry, Vice President - Nuclear Engineering

M. McCormick, General Manager, Safety Assessment,

Licensing &Training

R. Abbott, Unit 1 Plant Manager

J. Mueller, Unit 2 Plant Manager

D. Greene, Manager, Licensing

J. Warden, New York Consumer Protection Branch

G. Wilson, Senior Attorney

M. Wetterhahn, Winston and Strawn

Director, Energy &Water Division, Department of Public Service, State of New York

C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law

K. Abraham, PAO (2)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New York, SLO Designee

Niagara Mohawk Power

Corporation

bcc w/encl:

Region I Docket Room (with concurrences)

C. Cowgill, DRP

L. Nicholson, DRP

R. Fuhrmeister, DRP

B. Norris - Nine Mile Point

bcc w/encl: (VIAE-MAIL)

M. Shannon, NRR (MXS1)

V. McCree, OEDO (VMM)

R. Capra, NRR

J. Menning, NRR

D. Brinkman, NRR

~Wc

Rl:DRS

Cheung

3/ /94

RI:DRS

RI:ORA

RI:DRS

Rg

Holody

iggins

Mf~

3/yi94

3idll94

3i~794

OFFICIALRECORD COPY

A:NM29381.INS

0,